Rehearsal will use Slack #ops-rehearsal-2 channel for communications.
Meetings (using BlueJeans 462820406):
NOTES pages/links:
Resources
Meetings
- kickoff (pre-meeting) July 27, 2020 (10am PDT):
- Day 1 (July 28, 2020, 10am PDT):
- Day 2 (July 29, 2020, 10am PDT):
- Day 3 (July 30, 2020, 10am PDT):
Outline:
Simulated Time | Rehearsal Time (PDT) | Activity | Actor(s) | Description |
---|---|---|---|---|
Day 0 | July 27, 10am | Pre-meeting | ALL | A hopefully quick session to make sure we have all our ducks in a row. |
#Afternoon (DAY 1) | #Morning July 28 | |||
7am | Acquire afternoon calibration. | ObsOps | Simple Calibration Sequence: N? x bias, N? x flat, Dark sequence | |
Calibrations Products Pipeline | USDF | |||
9am | Examine Calibrations | SciOps | ||
10am | Afternoon Stand-up Operations Meeting. | ALL | ||
Close Out previous night's report | SciOps | |||
Reprocessing (if needed) | USDF | |||
Select Configurations and Calibration | SciOps | |||
#Night | ||||
#Afternoon (DAY 2) | #Morning July 29 | |||
7am | Acquire afternoon calibration. | ObsOps | Calibration Sequence (change illumination source) and repeat Day 1 | |
Calibrations Products Pipeline | USDF | |||
9am | Examine Calibrations | SciOps | ||
10am | Afternoon Stand-up Operations Meeting. | ALL | ||
Close Out previous night's report | SciOps | |||
Reprocessing (if needed) | USDF | |||
Select Configurations and Calibration | SciOps | |||
#Night | ||||
#Afternoon (DAY 3) | #Morning July 30 | |||
7am | Acquire afternoon calibration. | ObsOps | Calibration Sequence: N x Bias, M x Flat (interrupt or change illumination during sequence) N x Flat (take good sequence) Dark Sequence | |
Calibrations Products Pipeline | USDF | |||
9am | Examine Calibrations | SciOps | ||
10am | Afternoon Stand-up Operations Meeting. | ALL | ||
Close Out previous night's report | SciOps | |||
Reprocessing (if needed) | USDF | |||
Select Configurations and Calibration | SciOps | |||
#Night | ||||
#Afternoon (DAY 4) | #Morning July 31 | |||
Network configuration change | Kantor | The purpose being to test fail-over routing (provisional to networking) | ||
10am | Acquire afternoon calibration. | ObsOps | One set of BIAS(?) | |
Verify Data Arrival and Archiving | USDF | |||
No Need for General Meeting | \ | |||
next week | Write Tech Note to Summarize/Discuss Rehearsal | All | All really refers to |