Rehearsal will use Slack #ops-rehearsal-2 channel for communications.

Meetings (using BlueJeans 462820406):

NOTES pages/links:

Resources
Meetings

Outline:

Simulated
Time
Rehearsal
Time (PDT)

Activity

Actor(s)Description
Day 0July 27, 10amPre-meetingALLA hopefully quick session to make sure we have all our ducks in a row.
#Afternoon
(DAY 1)
#Morning
July 28




7amAcquire afternoon calibration.ObsOpsSimple Calibration Sequence:  N? x bias, N? x flat, Dark sequence


Calibrations Products Pipeline USDF

9amExamine CalibrationsSciOps

10am

Afternoon Stand-up Operations Meeting.

ALL


Close Out previous night's reportSciOps


Reprocessing (if needed)USDF


Select Configurations and Calibration SciOps
#Night



#Afternoon
(DAY 2)
#Morning
July 29




7amAcquire afternoon calibration.ObsOpsCalibration Sequence (change illumination source) and repeat Day 1


Calibrations Products Pipeline USDF

9amExamine CalibrationsSciOps

10am

Afternoon Stand-up Operations Meeting.

ALL


Close Out previous night's reportSciOps


Reprocessing (if needed)USDF


Select Configurations and Calibration SciOps
#Night



#Afternoon
(DAY 3)
#Morning
July 30




7amAcquire afternoon calibration.ObsOpsCalibration Sequence:
 N x Bias,
 M x Flat (interrupt or change illumination during sequence)
 N x Flat (take good sequence)
Dark Sequence


Calibrations Products Pipeline USDF

9amExamine CalibrationsSciOps

10am

Afternoon Stand-up Operations Meeting.

ALL


Close Out previous night's reportSciOps


Reprocessing (if needed)USDF


Select Configurations and Calibration SciOps
#Night



#Afternoon
(DAY 4)
#Morning
July 31





Network configuration changeKantorThe purpose being to test fail-over routing (provisional to networking)

10amAcquire afternoon calibration.ObsOpsOne set of BIAS(?)


Verify Data Arrival and ArchivingUSDF


No Need for General Meeting
\

next weekWrite Tech Note to Summarize/Discuss RehearsalAllAll really refers to 

NOTES/Comments:







  • No labels