02C.07.01.01 Data Management Control System
02C.07.01.02 Orchestration Manager
Request from | Relevant issues | Target cycle | Summary |
---|
DRP |
DLP-493
-
Getting issue details...
STATUS
| W16 | It should be possible for configuration to vary by filter (as well as by camera, as at present). |
DRP |
DLP-496
-
Getting issue details...
STATUS
DM-3144
-
Getting issue details...
STATUS
| W16 | DRP is prioritizing a re-write of the top-level pipeline tasks. This is a priority as we are incurring technical debt in terms of inconsistent interfaces, configurations and outputs as we merge from HSC through S15. We would like to take this opportunity to update these tasks to address known issues with the configuration system, as described, for example, in DM-3144. |
02C.07.01.03.02 Logging Services
02C.07.01.03.03 Inter-Process Messaging Services
Request from | Relevant issues | Target cycle | Summary |
---|
DRP |
DLP-493
-
Getting issue details...
STATUS
| W16 | Pool and/or scatter/gather below top-level driver. |
DRP |
DLP-523
-
Getting issue details...
STATUS
DLP-483
-
Getting issue details...
STATUS
| W18 | Detailed pipeline parallelization and distribution systems. We anticipate that the middleware ported from HSC (see short term requirements description,
RFC-68
-
Getting issue details...
STATUS
,
DM-2983
-
Getting issue details...
STATUS
), or equivalent home-grown LSST functionality, will provide adequate parallelization and distribution capabilities for the next 2-3 years of development. However, we do not imagine that this middleware will be deployed into production. Instead, production pipeline topology will depend on the results of ongoing and upcoming algorithmic development as well as hardware procurement and the processing control middleware capabilities which will be developed as part of 02C.07. We foresee the definition of this system as being the result of continued discussion between the interested parties. DRP will stand ready to provide input to these discussions in the form descriptions of potential processing topologies that suit our algorithmic requirements, with the level of detail and confidence increasing with time, culminating in the finalized interfaces described in DLP-523 and DLP-483. |
02C.07.01.03.04 Checkpoint/Restart Services
02C.07.02.01 Event Services
02C.07.02.02 Security and Access Control Services
-
DM-2512
-
Getting issue details...
STATUS
needs authentication system
02C.07.02.04 System Administration and Operations Services
02C.07.02.05 File System Services
02C.07.03.02 Camera DAQ Test Bed
02C.07.03.03 Telescope/OCS Interfaces Test Bed
02C.07.04.01 Archive Center Infrastructure
02C.07.04.02 US Data Access Center Infrastructure
02C.07.04.03 Base Center Infrastructure (Hardware Procurement)
02C.07.04.04 Chilean DAC Infrastructure (Hardware Procurement)
02C.07.04.05 Development and Integration Infrastructure
02C.07.04.06 Archive Site External Network