You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Next »

Date/Time

Default schedule is second Thursday of Month.

0800 PT/0800 MST/1000 CT/1130 ET/1200 CT

Meeting Online Connections

Join Zoom Meeting

TBD

Meeting Recording:

TBD

Attendees

Guests

Goals

  • Coordination of networking activities across LSST

Discussion items

Time

(PT)

Item

Who

Notes


NET Action Items Status

Reminder: Work on your action items: International Communications (aka Long-Haul Networks)

Documentation updates schedule:

August - LSST Joint NSF/DOE Status Review will establish new overall project schedule, commissioning milestones.  Observing with ComCam pushed back and shortened, observing with FullCam pushed back. We updated Network Milestones sheet accordingly. COMPLETE (See attachment)

September - Created FY20 contract amendments for FIU, REUNA, NCSA. COMPLETE

October - Complete LSST Change Request to update LSE-309 Summit - Base ITC Design Document (including Summit and Base networks) and related milestones in PMCS. COMPLETE

November/December - Continue work on  LSST Network Verification Plan (including JIRA).  See discussion below.

(Holidays and other activities.)

January - Develop draft LSST Operations Network SLAs.  See discussion below. Submit LSST Change Request to update LSE-78 LSST Observatory Network Design (including Chilean, International, and US networks) and related milestones in PMCS.  Including updated diagrams, including ESnet, etc. Complete work on  LSST Network Verification Plan (including JIRA).  See discussion below.


Update on CONUS Networks

CONUS Networks, including ESnet:

2 x 20 Gbps paths from Atlanta to Chicago built. Waiting for the AL2S portion to be built from Atlanta southwards.  2 options:

  • connect directly w/2 ports (plan A) cost arrangement
  • connect via Southern Crossroads Exchange point (SOX) (plan B) no cost

Received quote from internet2 for ports in Atlanta.  High priority.  Julio Ibarralead on this with internet2.  Need to resolve co-location discussion, Jacksonville.


Chilean/International Networks Update

Developments in La Serena and end-to-end service to NCSA for upcoming Auxiliary Telescope Traffic and general (internet, mail, voice) traffic:

LSST DWDM from Summit - Base upgraded with 2 x 100 G cards for general traffic. Moved a 20x10G card to different slot.  DAQ over DWDM test completed successfully.

DWDM service intervals and recent summit - caseta attenuation issue.  REUNA usually just cleans filters.  Fibers are usually okay as long as not touched, don't need frequent service.  Attenuation issue happened maybe because equipment sat in storage for a long time.  But there were no alarms. Unknown User (rlambert)Albert AstudilloDue diligence follow up on this problem.

REUNA DWDM from La Serena - Santiago 100G upgrade now planned for January.  Jeronimo Bezerrawill come to LS after setting up in Santiago?

ATS now planned to ship by Christmas, on-sky mid-January.  We are ready for start of data transfers.


NCSA - CC-IN2Pe Networks updateUnknown User (kollross)

NCSA - CC- IN2P3 network:

There are multiple options from Chicago - Europe, need to define which one and get necessary approvals in place (including "right to use" for LSST operations and VNOC participation).  See attached ANA-RENATER diagram.  Unknown User (kollross)working with IN2P3, RENATER, GEANT on default plan going via CANARIE - Amsterdam.  What MOUs do we need in place?  Is this addition to LSST - IN2P3 MOU?  Do we need to pay CANARIE ($ or other)


Other Discussion Topics

By topic


LSST Network Document Update:  Julio IbarraJeff Kantor

https://docs.google.com/document/d/1ZvpaHwIzHHMuqRXJEornIgQNH_8tP_EfiV6S1SzyonU/edit

New version is ready as soon as we get input from network operators to respond to questions, review document.  Identified members of NET need to complete this by one week before next month meeting  ACTION ITEM

LSST Network Verification: Jeff Kantor

LSST Networks needs to be formally verified as ready for LSST System Integration and Commissioning.  2019-07-11 Meeting published a list of requirement to be verified and a diagram of the JIRA test artifacts that must be done. (NOTE: Confluence can't render the JIRA test artifacts attachment, but it is a valid JPG file.  Download it to view it.)  Also see Network Verification Plan and Matrix, recently updated, on LSST-NET home page (and attached to this meeting page).

Management wants a network readiness review sometime in January/February, need to discuss timing and scope.  Ideally, this would come close after implementation of the ESnet 2 x 20 GB capability.

LSST Network SLAs for Operations: Jeff Kantor

FIU SLA in work, will use as template for others. 

Virtual NOC: Jeronimo BezerraUnknown User (rlambert)Albert AstudilloUnknown User (kollross)

Report from Ed Moynihan on Global NOC/IU interest in participating in VNOC definition and development

Use case - Recent fiber cut on REUNA segment, how could VNOC improve on outage and recovery notifications?  A proposed list of notifications and data elements:

Fault Notification

  • Where the fault exists
  • What time it occurred
  • Likely prognosis
  • What circuits it affects
  • What circuits are now active to move the traffic.

Recovery Notification

  • Time the failing circuit recovered, with outage time, and traffic reverted back
  • Diagnosis of the fault

(See also email thread on NET mailing list regarding LANautilus outage example)


Network Design and End-to-End Test Plan and QoS planningNeed to finish 100G migration in Chile to resume work on this.  Was planned for October, now November.

Other businessAny




Wrap up and next meeting

Wrap up and Next meetings:

 

 

All meetings at 0800 PDT/0800 MST/1000 CDT/1100 EDT/1100 CLT (subject to time changes)

Action items 

  • Unknown User (kollross) Work with IN2P3, RENATER, GEANT on default plan going via CANARIE - Amsterdam, produce diagram of paths (primary, secondary).  Define: What MOUs do we need in place?  Is this addition to LSST - IN2P3 MOU?  Do we need to pay CANARIE ($ or other)  
  •  Jeff KantorSchedule VNOC notification discussion meeting with entire NET  
  • Ed Moynihan Schedule meeting with Jeff KantorJulio Ibarra, Phil DeMar to discuss IU/GRNOC assistance in defining/elaborating VNOC requirements/design 
  •  Albert Astudillo , Jeronimo BezerraUnknown User (rlambert) , Renata Frez, Unknown User (kollross) Need to complete review, input to LSST Network Document 
  •  



  • No labels