Infrastructure meetings take place every other Thurs. at 9:00 Pacific on the BlueJeans infrastructure-meeting channel: https://bluejeans.com/383721668
Date
- Discussion items
Item | Who | Notes |
---|---|---|
Item | Who | Notes |
Review of last meeting notes |
| |
Discussion item: Base/Summit | Michelle Butler | Discussion: network diagram in Google to be placed in a ticket somewhere. ATS private network for Tucson test stand being discussed this week. EFD config and what is being placed at the base in 2019. |
Monthly maintenance | Going on today, and going well. Is rapping up at the end of the meeting, a bit early. Everything is being rebooted due to availability of security patch. | |
K8 instability | Instability of the K8 and the ingres environment with a reboot of a few nodes here and there is getting to be a daily occurance, and no one is really sure where the problems are. It's getting frustrating. all teams are working on this, and look forward to today's reboot. Weird stuff is going on with no end in site. | |
Log access | Log access to the K8 environment is increasing a high need. I think somewhere there is a cron that shows the log files is needed, and then a influx DB from monitoring would be nice, but need something now. | |
RPM/binary docker images repository needed | Kian-Tat Lim | Unknown User (mbutler) suggested to get a K8 environment set up for storing images as a test instance. That would be quickest way to a node for this testing. A machine can be purchased after the informal testing can be done. KT will start this with some help from Unknown User (mcarras2) basically the kind of set up that the Jenkins configuration was for Gabrelle. |
IN2P3 | Fabio Hernandez | DESC jobs are running a long time, so he is researching that through the logs and etc. He is heading to Rucio conference in Feb. IN2P3 have the FTS set up for Rucio and will test with NERSC and NCSA if we wish. |
Topics for next meeting |
Action items
Please enter action items in the form
Responsible Person, Due Date, Description