- Why needed? To test qserv at scale
- What is needed? 25, 50, 100, 150 VMs. Each: 4 cores, 8 GB RAM, at least 100GB per VM
- When needed? up to ~100 in 1 year, more later, perhaps with more cores
- Typical usage: used most of the time during the time period as requested
- Note, this is not needed ad-hoc, can be planned and scheduled 1-2 months in advance
Qserv KPIs
We are planning to run tests to demonstrate we can meet planned KPIs. This is captured in
. The bottom line:Jira server JIRA serverId 9da94fb6-5771-303d-a785-1b6c5ab0f2d2 key DLP-645 Cycle DR1 Catalog
[%]S15 10 S16 20 S17 30 S18 50 S19 75 S20 100
Qserv as a service
- Why needed? For SUI. To gain experience with running continuously.
- What is needed?
- 1/2 year: 4 VM, 8 cores, 16 GB RAM, 2 TB local storage, sudo
- to serve DC_W13_Stripe82 or equivalent
- ~2 year time frame: 8-16 VMs, each: 8 cores, 16 GB RAM, 2 TB local storage, sudo
- could go to much higher numbers (even like 50-100 VMs) if we have funding and if SUI would really find it useful.
- 1/2 year: 4 VM, 8 cores, 16 GB RAM, 2 TB local storage, sudo
- When needed soon
- Typical usage: 24x7 Qserv service for SUI
...