Date
Attendees
- Gregory Dubois-Felsmann
- Unknown User (xiuqin)
- Igor Gaponenko
- Brian Van Klaveren
- Unknown User (jalt)
- Fabio Hernandez
Goals
- Review readiness to begin assembling the system
Discussion items
Time | Item | Who | Notes |
---|---|---|---|
NCSA status |
| ||
SLAC status |
| ||
IPAC status |
| ||
Planning |
Action items
(See the LSP Integration and PDAC work items page for a summary of past action items)
- Unknown User (xiuqin) Make sure can log in to SUIT server machines with all required privileges
- Loi Ly Make sure can log in to SUIT server machines with all required privileges
- Unknown User (xiuqin) Try running Firefly at NCSA
- Gregory Dubois-Felsmann Post an LSST calendar meeting entry for this meeting so people will get reminders
- Gregory Dubois-Felsmann, Unknown User (xiuqin), Fritz Mueller Meet about the detailed work schedule for the weeks through November
- Unknown User (xiuqin), Gregory Dubois-Felsmann Create tickets for portal design and construction, including a local test against WISE data created epics DM-4681 DM-8307 DM-8350 to cover the work
- Gregory Dubois-Felsmann Test NCSA VPN access