BlueJeans: https://bluejeans.com/426716450
- Association:
- Our association task now talks to the PPDB prototype (l1dbproto).
- This requires some extra instantiation ahead of time. (Maybe.)
- So there are some extra docs required.
- This setup may be a little awkward in ap_verify.
- Should be in review very soon.
- Should then be what gets used in future ap_pipe test runs (e.g. by Meredith Rawls).
- Forced photometry:
- Starting next week!
- Specifically, this will be looking to perform forced photometry on PVIs based on the positions of DIASources.
- Data Facility:
- Got a repository working that has appropriate calibs covering effectively all DES data.
- Expecting to get coadd building working tomorrow.
- Reprocessing ap_verify_hits2015:
- Problems with calib validities prevented all the data being processed; working on resolving this.
- Docs are merged!
- Cutouts:
- Are done, and work!
- Speeding up the ap_verify test suite:
- So that they can run in response to small changes.
- Good seeing selector:
- Merged!
- Not tested...
- Working with Russell next week to produce some tests for this.
- Intending to update obs packages to call these coadds “good seeing” rather than “deep”.
- Also writing documentation on how to generate templates.