BlueJeans: https://bluejeans.com/426716450

  • Association:
    • Our association task now talks to the PPDB prototype (l1dbproto).
    • This requires some extra instantiation ahead of time. (Maybe.)
      • So there are some extra docs required.
      • This setup may be a little awkward in ap_verify.
    • Should be in review very soon.
    • Should then be what gets used in future ap_pipe test runs (e.g. by Meredith Rawls).
  • Forced photometry:
    • Starting next week!
    • Specifically, this will be looking to perform forced photometry on PVIs based on the positions of DIASources.
  • Data Facility:
    • Got a repository working that has appropriate calibs covering effectively all DES data.
    • Expecting to get coadd building working tomorrow.
  • Reprocessing ap_verify_hits2015:
    • Problems with calib validities prevented all the data being processed; working on resolving this.
    • Docs are merged!
  • Cutouts:
    • Are done, and work!
  • Speeding up the ap_verify test suite:
    • So that they can run in response to small changes.
  • Good seeing selector:
    • Merged!
    • Not tested...
    • Working with Russell next week to produce some tests for this.
    • Intending to update obs packages to call these coadds “good seeing” rather than “deep”.
    • Also writing documentation on how to generate templates.