Date/Time

(Default schedule is second Thursday of Month.)

ET 11:00

Date/Time
(Default schedule is second Thursday of Month.)

12 Oct 2023ET 11:00

Meeting Online Connections:

Join Zoom Meeting

https://fiu.zoom.us/j/91798981616?pwd=UStqamsydWNuQmI2RHAwR2VCUkZ1QT09

Meeting ID: 917 9898 1616

Passcode: Uycj3H

One tap mobile

+13052241968,,91798981616# US

+16469313860,,91798981616# US

---

Dial by your location

  • +1 305 224 1968 US
  • +1 646 931 3860 US
  • +1 301 715 8592 US (Washington DC)
  • +1 309 205 3325 US
  • +1 312 626 6799 US (Chicago)
  • +1 646 876 9923 US (New York)
  • +1 719 359 4580 US
  • +1 253 205 0468 US
  • +1 253 215 8782 US (Tacoma)
  • +1 346 248 7799 US (Houston)
  • +1 360 209 5623 US
  • +1 386 347 5053 US
  • +1 507 473 4847 US
  • +1 564 217 2000 US
  • +1 669 444 9171 US
  • +1 669 900 6833 US (San Jose)
  • +1 689 278 1000 US

Meeting ID: 917 9898 1616

Find your local number: https://fiu.zoom.us/u/adf7noRLRY

---

Join by SIP

---

Join by H.323

  • 162.255.37.11 (US West)
  • 162.255.36.11 (US East)
  • 115.114.131.7 (India Mumbai)
  • 115.114.115.7 (India Hyderabad)
  • 213.19.144.110 (Amsterdam Netherlands)
  • 213.244.140.110 (Germany)
  • 103.122.166.55 (Australia Sydney)
  • 103.122.167.55 (Australia Melbourne)
  • 209.9.211.110 (Hong Kong SAR)
  • 64.211.144.160 (Brazil)
  • 69.174.57.160 (Canada Toronto)
  • 65.39.152.160 (Canada Vancouver)
  • 207.226.132.110 (Japan Tokyo)
  • 149.137.24.110 (Japan Osaka)

Meeting ID: 917 9898 1616

Passcode: 200413

---

Meeting Recording:

TBD

Attendees 

  • Jeronimo Bezerra (JB) FIU/AmLight
  • Julio Ibarra (JI) FIU/AmLight  HOST
  • Julio Constanzo (JC) Vera Rubin Observatory
  • Josh Hoblitt (JH) Vera Rubin Observatory
  • Phil DeMar (PD) FNAL  
  • Paul Wefel (PW) ESnet
  • Mark Foster (MF) USDF, SLAC
  • David Ripley (DR), Global NOC, IU
  • Corey Donovan (CD), Global NOC, IU
  • Jon Sherk (JS), Global NOC, IU
  • Adam Williamson (AW), Global NOC, IU
  • Jeremy Oakes (JO), Global NOC, IU
  • Brian McGough (BM), Global NOC, IU
  • Matthew Mountz (MM) USDF/SLAC
  • Vasilka Chergarova (VCh) FIU/AmLight
  • Sergio Cofre (SC) REUNA

Goals

  • Coordination of networking activities across Rubin Observatory

Discussion items










  Timelines & Milestones Review

<all>

Baseline Milestones Spreadsheet Review and Checkup:

No updates or changes in milestones spreadsheet, although noted that some dates are no longer accurate and do need to be updated in the spreadsheet.  Expectation is Cristian will update when he able to return to work.

La Serena ↔ SLAC PS MaDDash:

MaDDash Dashboard - Check Results (ampath.net)

High retransmit rates as measured from the La Serena PS server on throughput from SLAC to La Serena (reverse direction) were discussed.  Updating of SLAC PS server had raised the reverse throughput results, but it was still below the forward throughput (LS → SLAC) results and still had higher retransmits.  

PS servers for summit and USDF are still "in the pipeline" for deployment.

Documents - Google Drive


Update on CONUS Networks

CONUS Networks, including ESnet:

Paul (ESnet):  X-connect orders are in at ATL.  Paperwork on transition of LSST to operational budget spending has been received, and being looked at.  Paul will look into using an ESnet PS server at SLAC for running measurements to/from La Serena for comparison to the current results with the SLAC PS server.

Julio (AmLight): X-connects for Ampath to JAX over I2 moving forward.  SPectrum from JAX to ATL is in place.

Official ask for 2nd backup circuit?


Chilean/International Networks Update

Julio Constanzo

Sergio Cofre

Jeronimo Bezerra 

Developments in La Serena and end-to-end service to NCSA for upcoming Auxiliary Telescope Traffic and general (internet, mail, voice) traffic

Josh (Vera Rubin Obser.):  No updates to provide; waiting for Cristian's return.

Sergio (REUNA):  No updates.

Julio (AmLight):  HuaWei bypass is waiting for completion of 4x100GE circuits between Sao Paulo to Buenos Aires.  X-connects on those circuits are on order.  Target for having the circuits available remains end-of-year.  AmLight network hardware refresh scheduled for Santiago.


USDF - CC-IN2P3 Networks update

Mark Foster

Frederic Loui 

USDF - CC- IN2P3 network:

Mark (USDF):  Progress continuing on USDF installations.  No update on when USDF PS server might be available.  


GNOC Services Discussion & Update

David Ripley (GNOC)

Corey Donovan (GNOC)

Jon Sherk (GNOC)

Delays in scheduling meeting with Ver Rubin Obser. due to Cristian's continued absence.  Targeting getting something set up after Thanksgiving.  Discussion on available documentation that the GNOC can provide on their monitoring APIs, and how it should be distributed.  Plan is to organize and distribute that documentation prior to the Dec. meeting, then discuss it at that meeting.

Other Discussion Topics

By topic


Rubin Observatory Network Verification:

No updates on this.  Waiting for Cristian's return.  This may be tied in with encryption devices deployment & availability.

Rubin Observatory Networks, SLAs for Operations:

No update available on the REUNA SLA.

Document update status summary

LSE-78 :   Should be done

LSE-479:  Still in progress.

O&M :   Still in progress.


Other businessAny