Date/Time
(Default schedule is second Thursday of Month.)
ET 13:00
Meeting Online Connections:
Join Zoom Meeting
https://fiu.zoom.us/j/602918755?pwd=dmpheWkzZ0I2YWF3OGpWNzlUL3ltUT09
Meeting ID: 602 918 755
Passcode: 000000
One tap mobile
+16468769923,,602918755# US (New York)
+13017158592,,602918755# US (Germantown)
Dial by your location
+1 646 876 9923 US (New York)
+1 301 715 8592 US (Germantown)
+1 312 626 6799 US (Chicago)
+1 669 900 6833 US (San Jose)
+1 253 215 8782 US (Tacoma)
+1 346 248 7799 US (Houston)
Meeting ID: 602 918 755
Find your local number: https://fiu.zoom.us/u/aedBVv78VU
Join by SIP
602918755@zoomcrc.com
Join by H.323
162.255.37.11 (US West)
162.255.36.11 (US East)
115.114.131.7 (India Mumbai)
115.114.115.7 (India Hyderabad)
213.19.144.110 (Amsterdam Netherlands)
213.244.140.110 (Germany)
103.122.166.55 (Australia)
209.9.211.110 (Hong Kong SAR)
64.211.144.160 (Brazil)
69.174.57.160 (Canada)
207.226.132.110 (Japan)
Meeting ID: 602 918 755
Passcode: 000000
Meeting Recording:
TBD
Attendees
- Jeff Kantor (JK) (Rubin Observatory)
- Julio Ibarra (JI) FIU/AmLight
- Jeronimo Bezerra (JB) FIU/AmLight
- Cristián Silva (Rubin Observatory) HOST
- Renata Frez (RZ) Amlight/Brazil
- Richard Hughes-Jones (RHJ) GEANT
- Phil DeMar (PD) FNAL
- Paul Wefel (PW) ESnet
- Matt Kollross (MK) NCSA
- Ed Moynihan (EM) NEARR, Global NOC, IU
- Kate Robinson (KR) ESnet
- Vasilka Chergarova (VCh) FIU/AmLight
Albert Astudillo (AA) REUNA
- Stuart McLellan (SM) RENATER
- Gisella Kapus (GK) ESnet
Goals
- Coordination of networking activities across Rubin Observatory
Discussion items
Time (PT) | Item | Who | Notes |
---|---|---|---|
NET Action Items Status | Reminder: Work on your action items: International Communications (aka Long-Haul Networks) Network activities schedule (subject to COVID19 impacts): January - Continued work on Rubin Observatory Network Verification Plan (including JIRA). February - Completed draft Rubin Observatory Network Verification Plan (including JIRA). March - Scheduled Rubin Observatory Networks Pre-Verification Review for May 18 - 19 April - Prepare for Rubin Observatory Networks Pre-Verification Review. Submit LSST Change Request to update LSE-78 Rubin Observatory Network Design (including Chilean, International, and US networks), and related milestones in PMCS. Complete LDM-732 Rubin Observatory Networks Pre-verification Baseline. May - Complete FY19, FY20 NET Reports and Technical Document June - Conduct and respond to actions from Rubin Observatory Networks Pre-Verification Review. Meet with GlobalNOC re VNOC support. July - Pre-Ops Rehearsal 2 testing. August - Ops Rehearsal 2/Pre-verification testing. September - Cisco ACI review, Huawei analysis October - Start Verification Testing, LS restart, LS - SCL 40G upgrade. (hopefully) - November - Update Rubin Observatory Operations & Management Plan, USDF Selection, CP Restart, Network Contracts and SLAs. December - Updates on G-NOC service progress, Brazil path (Huawei) options, planning for US Data Facility at SLAC January - Updates on G-NOC service progress, Brazil path (Huawei) options, planning for US Data Facility at SLAC February - Agreed to propose NSF to DOE include funding of VNOC and Huawei in the ops proposal / USDF continuing discussing footprints, power cooling. March - Keep 2x20GB through Chicago during Construction. End of Construction Aug-FY23, would need 2x100 to SLAC. New processing facility in UK, some data that goes to Europe will go to UK (1/4), likely 75% of data will be processed in Europe so more data will come back, so the 2x10GB link will likely increase 7-7.5GB per year | ||
Timelines & Milestones Review | <all> | Baseline Milestones Spreadsheet Review and Checkup: ESnet should connect to SLAC in June? Physically connected and would be 100gb between SLAC and Atlanta. | |
Update on CONUS Networks | CONUS Networks, including ESnet: Paul: Working in the SLAC connectivity Jeronimo: Working Boca to Atlanta working and Jacksonville to Atlanta. Working in collocation providers RNP: Sao Paulo and Porto Alegre soon too be ready., for Stgo to Sao Paulo. Purchased exfo equipment, with great results. Still waiting for Juniper switches. | ||
Chilean/International Networks Update | Developments in La Serena and end-to-end service to NCSA for upcoming Auxiliary Telescope Traffic and general (internet, mail, voice) traffic Cristian: No updates. Sergio: No updates. | ||
USDF & NCSA - CC-IN2P3 Networks update | USDF & NCSA - CC- IN2P3 network: Mark: Pre-ops preparation deploying 100gb links. Richard: Meeting between in2p3, geant, renater .100gb between in2p3 and geant, some extra bw available but needs to be isolated from other science projects, in particular LHCONE. Fabio: working group set up to exercise Rucio-driven bulk data replication between the data facilities (USDF, FrDF and UKDF). | ||
Other Discussion Topics | By topic | Rubin Observatory Network Verification: Josh: LDM-732 doc. generated from Jira. Working in requirements with DM scientist. Rubin Observatory Networks, SLAs for Operations: No updates. Virtual NOC: No updates. Document update status summary: LSE-78: updates in progress. LSE-479: no updates | |
Other business | Any | Phil: O&M draft next month. | |
Wrap up and next meeting | Wrap up and Next meetings:
All meetings at ET/1300 (subject to time changes) |