Date/Time

(Default schedule is second Thursday of Month.)

0800 PT/0900 MT/1000 CT/1100 ET/1300 CLT

Meeting Online Connections:

Join Zoom Meeting
https://fiu.zoom.us/j/602918755?pwd=dmpheWkzZ0I2YWF3OGpWNzlUL3ltUT09

Meeting ID: 602 918 755
Passcode: 000000
One tap mobile
+16468769923,,602918755# US (New York)
+13017158592,,602918755# US (Germantown)

Dial by your location
        +1 646 876 9923 US (New York)
        +1 301 715 8592 US (Germantown)
        +1 312 626 6799 US (Chicago)
        +1 669 900 6833 US (San Jose)
        +1 253 215 8782 US (Tacoma)
        +1 346 248 7799 US (Houston)
Meeting ID: 602 918 755
Find your local number: https://fiu.zoom.us/u/aedBVv78VU

Join by SIP
602918755@zoomcrc.com

Join by H.323
162.255.37.11 (US West)
162.255.36.11 (US East)
115.114.131.7 (India Mumbai)
115.114.115.7 (India Hyderabad)
213.19.144.110 (Amsterdam Netherlands)
213.244.140.110 (Germany)
103.122.166.55 (Australia)
209.9.211.110 (Hong Kong SAR)
64.211.144.160 (Brazil)
69.174.57.160 (Canada)
207.226.132.110 (Japan)
Meeting ID: 602 918 755
Passcode: 000000

Meeting Recording:

TBD

Attendees

  • Gisella Kapus (GK) ESnet

Goals

  • Coordination of networking activities across Rubin Observatory

Discussion items

Time

(PT)

Item

Who

Notes


NET Action Items Status

Reminder: Work on your action items: International Communications (aka Long-Haul Networks)

Network activities schedule (subject to COVID19 impacts):

January - Continued work on  Rubin Observatory Network Verification Plan (including JIRA). 

February - Completed draft  Rubin Observatory Network Verification Plan (including JIRA).

March - Scheduled Rubin Observatory Networks Pre-Verification Review for May 18 - 19

April - Prepare for Rubin Observatory Networks Pre-Verification Review.  Submit LSST Change Request to update LSE-78 Rubin Observatory Network Design (including Chilean, International, and US networks), and related milestones in PMCS.   Complete LDM-732 Rubin Observatory Networks Pre-verification Baseline.

May - Complete FY19, FY20 NET Reports and Technical Document

June - Conduct and respond to actions from Rubin Observatory Networks Pre-Verification Review.  Meet with GlobalNOC re VNOC support.

July  - Pre-Ops Rehearsal 2 testing.

August - Ops Rehearsal 2/Pre-verification testing.

September - Cisco ACI review, Huawei analysis 

October - Start Verification Testing, LS restart, LS - SCL 40G upgrade. (hopefully) - 

November - Update Rubin Observatory Operations & Management Plan, USDF Selection, CP Restart, Network Contracts and SLAs.

December - Updates on G-NOC service progress, Brazil path (Huawei) options, planning for US Data Facility at SLAC

January - Updates on G-NOC service progress, Brazil path (Huawei) options, planning for US Data Facility at SLAC

February - Agreed to propose NSF to DOE include funding of VNOC and Huawei in the ops proposal / USDF continuing discussing footprints, power cooling. 

March - Keep 2x20GB through Chicago during Construction. End of Construction Aug-FY23, would need 2x100 to SLAC.

New processing facility in UK, some data that goes to Europe will go to UK (1/4), likely 75% of data will be processed in Europe so more data will come back, so the 2x10GB link will likely increase 7-7.5GB per year


Update on CONUS Networks

CONUS Networks, including ESnet:

  • Some ESnet6 backbone links are being upgraded from 100GE to 400GE; no disruption in service is expected during this transition;
  • The Boca/ATL segment spectrum deployment is in the vendor investigation phase; expectation is the service to be in place by August (2022), to allow ~1yr of use before operations starts;
  • Capacity on Internet-2 for the JAX/ATL backup path has been confirmed to be available; it's simply a timing issue now on when to procure/turn on the service.

Chilean/International Networks Update

Developments in La Serena and end-to-end service to NCSA for upcoming Auxiliary Telescope Traffic and general (internet, mail, voice) traffic

  • A google maps topology version of the Vera Rubin networking is being finalized by Vera Rubin Observatory;
  • There is some maintenance scheduled for this coming weekend on the La Serena / Santiago links.  As with previous outages, outages will be posted in the SLACK channel.
  • REUNA completed the extension to Huechuraba; 100GE is now in place between Huechuraba and Port Alegre.

USDF & NCSA - CC-IN2P3 Networks update

USDF & NCSA - CC- IN2P3 network:

  • Figures for the terminus of the LHN at SLAC are still in progress by multiple parties; they should be ready by the next meeting, and will be added to LSE-479.
  • 3-4 racks for servers are being put in place at SLAC in existing computer room space ahead of occupational readiness for the US-DF facility area.  Switches for those racks have been delayed by supply chain issues.
  • GEANT backbone upgrades are progressing smoothly; no disruption of existing services should be felt.

Other Discussion Topics

By topic


Rubin Observatory Network Verification:

No update this month

Rubin Observatory Networks, SLAs for Operations:

No update this month

Virtual NOC: 

No change in status.  

Document update status summary

SLAAC Conference/NET Workshop:

  • SLAAC meeting will be April 19-20; NET Workshop will be April 21-22.  Invitations for registration have been sent out.  It is requested that people register as soon as possible.
  • A session focusing on Data Movement plans/activities & associated networking requirements will be included in the NET Workshop agenda.
  • Julio, Cristian, & Phil will meet within the next several weeks to decide on the NET Workshop agenda structure.  The March NET meeting will be targeted at preparations for NET workshop agenda items.

Other businessAny