Date/Time
(Default schedule is second Thursday of Month.)
0800 PT/0900 MT/1000 CT/1100 ET/1300 CLT
Meeting Online Connections:
Join Zoom Meeting
https://fiu.zoom.us/j/602918755?pwd=dmpheWkzZ0I2YWF3OGpWNzlUL3ltUT09
Meeting ID: 602 918 755
Passcode: 000000
One tap mobile
+16468769923,,602918755# US (New York)
+13017158592,,602918755# US (Germantown)
Dial by your location
+1 646 876 9923 US (New York)
+1 301 715 8592 US (Germantown)
+1 312 626 6799 US (Chicago)
+1 669 900 6833 US (San Jose)
+1 253 215 8782 US (Tacoma)
+1 346 248 7799 US (Houston)
Meeting ID: 602 918 755
Find your local number: https://fiu.zoom.us/u/aedBVv78VU
Join by SIP
602918755@zoomcrc.com
Join by H.323
162.255.37.11 (US West)
162.255.36.11 (US East)
115.114.131.7 (India Mumbai)
115.114.115.7 (India Hyderabad)
213.19.144.110 (Amsterdam Netherlands)
213.244.140.110 (Germany)
103.122.166.55 (Australia)
209.9.211.110 (Hong Kong SAR)
64.211.144.160 (Brazil)
69.174.57.160 (Canada)
207.226.132.110 (Japan)
Meeting ID: 602 918 755
Passcode: 000000
Meeting Recording:
TBD
Attendees
- Jeff Kantor (JK) (Rubin Observatory)
- Julio Ibarra (JI) FIU/AmLight
- Jeronimo Bezerra (JB) FIU/AmLight
- Cristián Silva (Rubin Observatory)
- Renata Frez (RZ) Amlight/Brazil
- Richard Hughes-Jones (RHJ) GEANT
- Phil DeMar (PD) FNAL
- Paul Wefel (PW) ESnet
- Matt Kollross (MK) NCSA
- Ed Moynihan (EM) NEARR, Global NOC, IU
- Kate Robinson (KR) ESnet
- Vasilka Chergarova (VCh) FIU/AmLight
Albert Astudillo (AA) REUNA
- Stuart McLellan (SM) RENATER
- Gisella Kapus (GK) ESnet
Goals
- Coordination of networking activities across Rubin Observatory
Discussion items
Time (PT) | Item | Who | Notes |
---|---|---|---|
NET Action Items Status | Reminder: Work on your action items: International Communications (aka Long-Haul Networks) Network activities schedule (subject to COVID19 impacts): January - Continued work on Rubin Observatory Network Verification Plan (including JIRA). February - Completed draft Rubin Observatory Network Verification Plan (including JIRA). March - Scheduled Rubin Observatory Networks Pre-Verification Review for May 18 - 19 April - Prepare for Rubin Observatory Networks Pre-Verification Review. Submit LSST Change Request to update LSE-78 Rubin Observatory Network Design (including Chilean, International, and US networks), and related milestones in PMCS. Complete LDM-732 Rubin Observatory Networks Pre-verification Baseline. May - Complete FY19, FY20 NET Reports and Technical Document June - Conduct and respond to actions from Rubin Observatory Networks Pre-Verification Review. Meet with GlobalNOC re VNOC support. July - Pre-Ops Rehearsal 2 testing. August - Ops Rehearsal 2/Pre-verification testing. September - Cisco ACI review, Huawei analysis October - Start Verification Testing, LS restart, LS - SCL 40G upgrade. (hopefully) - November - Update Rubin Observatory Operations & Management Plan, USDF Selection, CP Restart, Network Contracts and SLAs. December - Updates on G-NOC service progress, Brazil path (Huawei) options, planning for US Data Facility at SLAC January - Updates on G-NOC service progress, Brazil path (Huawei) options, planning for US Data Facility at SLAC February - Agreed to propose NSF to DOE include funding of VNOC and Huawei in the ops proposal / USDF continuing discussing footprints, power cooling. March - Keep 2x20GB through Chicago during Construction. End of Construction Aug-FY23, would need 2x100 to SLAC. New processing facility in UK, some data that goes to Europe will go to UK (1/4), likely 75% of data will be processed in Europe so more data will come back, so the 2x10GB link will likely increase 7-7.5GB per year | ||
US ipv6 Mandate Talk | 20% ipv6 only - FY23 80% ipv6 only - FY25 SLAC still WIP regarding the answer to the mandate. OMB Mandate: https://www.whitehouse.gov/wp-content/uploads/2020/11/M-21-07.pdf DeMar OMB Mandate presentation slides: | ||
Update on CONUS Networks | CONUS Networks, including ESnet: Paul Wefel not much happening, work on LSE-479 Jeronimo Bezerra not changes for the next 2 years. | ||
Chilean/International Networks Update | Developments in La Serena and end-to-end service to NCSA for upcoming Auxiliary Telescope Traffic and general (internet, mail, voice) traffic Cristián SilvaJira project creation still in progress, backup link still pending configuration | ||
USDF & NCSA - CC-IN2P3 Networks update | USDF & NCSA - CC- IN2P3 network: NCSA: no updates. SLAC: no updates, planning of pre population of services. IN2P3: Planning for next week. | ||
Other Discussion Topics | By topic | Rubin Observatory Network Verification: No updates. Rubin Observatory Networks, SLAs for Operations: No updates, close LSE-78 and OM Plan first Virtual NOC: No updates either. Document update status summary: LSE-78; LSE-479; Operations & Management document | |
Other business | Any | Cristián Silva next meeting ipv6 talk by Nick Buraglio | |
Wrap up and next meeting | Wrap up and Next meetings:
All meetings at 0800 PT/0900 MT/1000 CT/1100 ET/1300 CLT (subject to time changes) |