Date/Time
(Default schedule is second Thursday of Month.)
0800 PT/0900 MT/1000 CT/1100 ET/1300 CLT
Meeting Online Connections:
Join Zoom Meeting
https://fiu.zoom.us/j/602918755?pwd=dmpheWkzZ0I2YWF3OGpWNzlUL3ltUT09
Meeting ID: 602 918 755
Passcode: 000000
One tap mobile
+16468769923,,602918755# US (New York)
+13017158592,,602918755# US (Germantown)
Dial by your location
+1 646 876 9923 US (New York)
+1 301 715 8592 US (Germantown)
+1 312 626 6799 US (Chicago)
+1 669 900 6833 US (San Jose)
+1 253 215 8782 US (Tacoma)
+1 346 248 7799 US (Houston)
Meeting ID: 602 918 755
Find your local number: https://fiu.zoom.us/u/aedBVv78VU
Join by SIP
602918755@zoomcrc.com
Join by H.323
162.255.37.11 (US West)
162.255.36.11 (US East)
115.114.131.7 (India Mumbai)
115.114.115.7 (India Hyderabad)
213.19.144.110 (Amsterdam Netherlands)
213.244.140.110 (Germany)
103.122.166.55 (Australia)
209.9.211.110 (Hong Kong SAR)
64.211.144.160 (Brazil)
69.174.57.160 (Canada)
207.226.132.110 (Japan)
Meeting ID: 602 918 755
Passcode: 000000
Meeting Recording:
TBD
Attendees
- Jeff Kantor (JK) (Rubin Observatory)
- Julio Ibarra (JI) FIU/AmLight
- Jeronimo Bezerra (JB) FIU/AmLight
- Cristián Silva (Rubin Observatory)
- Renata Frez (RZ) Amlight/Brazil
- Richard Hughes-Jones (RHJ) GEANT
- Phil DeMar (PD) FNAL
- Paul Wefel (PW) ESnet
- Matt Kollross (MK) NCSA
- Ed Moynihan (EM) NEARR, Global NOC, IU
- Kate Robinson (KR) ESnet
- Vasilka Chergarova (VCh) FIU/AmLight
Albert Astudillo (AA) REUNA
- Stuart McLellan (SM) RENATER
- Gisella Kapus (GK) ESnet
Goals
- Coordination of networking activities across Rubin Observatory
Discussion items
Time (PT) | Item | Who | Notes |
---|---|---|---|
NET Action Items Status | Reminder: Work on your action items: International Communications (aka Long-Haul Networks) Network activities schedule (subject to COVID19 impacts): January - Continued work on Rubin Observatory Network Verification Plan (including JIRA). February - Completed draft Rubin Observatory Network Verification Plan (including JIRA). March - Scheduled Rubin Observatory Networks Pre-Verification Review for May 18 - 19 April - Prepare for Rubin Observatory Networks Pre-Verification Review. Submit LSST Change Request to update LSE-78 Rubin Observatory Network Design (including Chilean, International, and US networks), and related milestones in PMCS. Complete LDM-732 Rubin Observatory Networks Pre-verification Baseline. May - Complete FY19, FY20 NET Reports and Technical Document June - Conduct and respond to actions from Rubin Observatory Networks Pre-Verification Review. Meet with GlobalNOC re VNOC support. July - Pre-Ops Rehearsal 2 testing. August - Ops Rehearsal 2/Pre-verification testing. September - Cisco ACI review, Huawei analysis October - Start Verification Testing, LS restart, LS - SCL 40G upgrade. (hopefully) - November - Update Rubin Observatory Operations & Management Plan, USDF Selection, CP Restart, Network Contracts and SLAs. December - Updates on G-NOC service progress, Brazil path (Huawei) options, planning for US Data Facility at SLAC January - Updates on G-NOC service progress, Brazil path (Huawei) options, planning for US Data Facility at SLAC February - Agreed to propose NSF to DOE include funding of VNOC and Huawei in the ops proposal / USDF continuing discussing footprints, power cooling. March - Keep 2x20GB through Chicago during Construction. End of Construction Aug-FY23, would need 2x100 to SLAC. New processing facility in UK, some data that goes to Europe will go to UK (1/4), likely 75% of data will be processed in Europe so more data will come back, so the 2x10GB link will likely increase 7-7.5GB per year | ||
Networking Flow Talk | Richard Dubois | Richard Duboiswill update the rates estimations according to the 7s requirement | |
Update on CONUS Networks | CONUS Networks, including ESnet: NCSA will be used during construction. SLAC next year likely will have traffic from ComCam and Auxtel. ESNet in talks to increase its transatlantic traffic. No updates from CONUS | ||
Chilean/International Networks Update | Developments in La Serena and end-to-end service to NCSA for upcoming Auxiliary Telescope Traffic and general (internet, mail, voice) traffic: Cristián Silva distribution list created. rubinobs-lhn-notifications@lists.lsst.org Albert / Cristian : Backup link being configured. Cristián SilvaJira project in progress Cristián Silva ipv6 Stgo to Porto Alegre, missing component in Buenos Aires to complete connection. | ||
USDF & NCSA - CC-IN2P3 Networks update | USDF & NCSA - CC- IN2P3 network: NCSA: No updates SLAC: Pending conversation to connect fiber links from ESNet to SLAC. IPv6 understanding its impact. Telemetry developed by Amlight is at the moment ipv4, will require further development if needed. IN2P3: GEATN Pier with ESNet transatlantic, ready for tests. | ||
Other Discussion Topics | By topic | Rubin Observatory Network Verification: No updates. Rubin Observatory Networks, SLAs for Operations: Virtual NOC: Document update status summary: LSE-78; LSE-479; Operations & Management document Updates added to LSE-78, ready to be reviewed by the rest of the NET Updates to LSE-479 in Dropbox, Julio assigned action items to NET members O&M Document, waiting for co-chairs to review doc. GMT talk with Jeff, Cristian and Albert about connectivity to Noirlab. | |
Other business | Any | Cristián Silva next meeting ipv6 talk by Nick Buraglio | |
Wrap up and next meeting | Wrap up and Next meetings: