Date/Time

(Default schedule is second Thursday of Month.)

0800 PT/0900 MT/1000 CT/1100 ET/1300 CLT

Meeting Online Connections:

Join Zoom Meeting
https://fiu.zoom.us/j/602918755?pwd=dmpheWkzZ0I2YWF3OGpWNzlUL3ltUT09

Meeting ID: 602 918 755
Passcode: 000000
One tap mobile
+16468769923,,602918755# US (New York)
+13017158592,,602918755# US (Germantown)

Dial by your location
        +1 646 876 9923 US (New York)
        +1 301 715 8592 US (Germantown)
        +1 312 626 6799 US (Chicago)
        +1 669 900 6833 US (San Jose)
        +1 253 215 8782 US (Tacoma)
        +1 346 248 7799 US (Houston)
Meeting ID: 602 918 755
Find your local number: https://fiu.zoom.us/u/aedBVv78VU

Join by SIP
602918755@zoomcrc.com

Join by H.323
162.255.37.11 (US West)
162.255.36.11 (US East)
115.114.131.7 (India Mumbai)
115.114.115.7 (India Hyderabad)
213.19.144.110 (Amsterdam Netherlands)
213.244.140.110 (Germany)
103.122.166.55 (Australia)
209.9.211.110 (Hong Kong SAR)
64.211.144.160 (Brazil)
69.174.57.160 (Canada)
207.226.132.110 (Japan)
Meeting ID: 602 918 755
Passcode: 000000

Meeting Recording:

TBD

Attendees

  • Gisella Kapus (GK) ESnet

Goals

  • Coordination of networking activities across Rubin Observatory

Discussion items

Time

(PT)

Item

Who

Notes


NET Action Items Status

Reminder: Work on your action items: International Communications (aka Long-Haul Networks)

Network activities schedule (subject to COVID19 impacts):

January - Continued work on  Rubin Observatory Network Verification Plan (including JIRA). 

February - Completed draft  Rubin Observatory Network Verification Plan (including JIRA).

March - Scheduled Rubin Observatory Networks Pre-Verification Review for May 18 - 19

April - Prepare for Rubin Observatory Networks Pre-Verification Review.  Submit LSST Change Request to update LSE-78 Rubin Observatory Network Design (including Chilean, International, and US networks), and related milestones in PMCS.   Complete LDM-732 Rubin Observatory Networks Pre-verification Baseline.

May - Complete FY19, FY20 NET Reports and Technical Document

June - Conduct and respond to actions from Rubin Observatory Networks Pre-Verification Review.  Meet with GlobalNOC re VNOC support.

July  - Pre-Ops Rehearsal 2 testing.

August - Ops Rehearsal 2/Pre-verification testing.

September - Cisco ACI review, Huawei analysis 

October - Start Verification Testing, LS restart, LS - SCL 40G upgrade. (hopefully) - 

November - Update Rubin Observatory Operations & Management Plan, USDF Selection, CP Restart, Network Contracts and SLAs.

December - Updates on G-NOC service progress, Brazil path (Huawei) options, planning for US Data Facility at SLAC

January - Updates on G-NOC service progress, Brazil path (Huawei) options, planning for US Data Facility at SLAC

February - Agreed to propose NSF to DOE include funding of VNOC and Huawei in the ops proposal / USDF continuing discussing footprints, power cooling. 


Update on CONUS Networks

CONUS Networks, including ESnet:

Working on the documentation along with Jeff.  LSE-78 / LSE-479. Clarification about the VNOC work, it should be passive, reporting outages to the operators rather than lead 

Update documentation in preparation for the Net Meeting. 

Amlight everything is done, waiting for Huawei decision, Buenos AIres - Sao Paulo will be finished this month, BA to SCL done, Internet 2 done. Boca to Atlanta waiting for operations. 



Chilean/International Networks Update

Developments in La Serena and end-to-end service to NCSA for upcoming Auxiliary Telescope Traffic and general (internet, mail, voice) traffic:

Cristián Silva Auxtel run in January, data sent to NCSA. A few outages in the LS-SCL link, data shifted to commodity link. Next run 16th Feb. (planned)

Cristián Silva No updates on LHN LS-SCL backup link, waiting on the decision by upper management. A third party report has been requested to ensure proper fiber installation.

Jeff KantorLS-SCL had few outages, would like to move the 40G to 100G, hence the importance of the backup link. Reuna in talks with the provider to increase bw to 100G. Jeff, Cristian will meet about contract administration during 

Albert AstudilloInfrastructure ready to transport 40G. BFD problem in the backup path, working on the solution.


NCSA - CC-IN2P3 Networks update

Unknown User (kollross)

Richard Hughes-Jones

Stuart McLellan

NCSA - CC- IN2P3 network:

IN2P3 to SLAC update: Working in the path with partners to get from IN2P3 to SLAC. Path should be part of LSE-78/479. LSST traffic Genive - Renater over 100GB. 4x10GB IN2P3 - Renater , Lion - Genive 100GB. Conversation on going about where SLAC and IN2P3 will peer. Shared infrastructure could complicate diagrams, but the documentation should be Rubin centric. 



Other Discussion Topics

By topic


Rubin Observatory Network Verification:

Cristián Silva no updates, it is in the queue. Will have a plan before end of Q2

Rubin Observatory Networks, SLAs for Operations:

Jeff Kantor Drafted an SLA template. Reuna, FIU. embed into operations proposal so they don't have to re-compete. COVID delays created a gap in funding. Will request extra funding to cover gap FY22. LDM-142  details funding of bw in construction and operations.

Network Security:

Encrypt data, but there are no requirements yet. 


Other businessAny

SAAC 13 - 14 April - Invitations sent and registration page. Link sent https://www.amlight.net/?p=4467 program still under discussion. Last co-chair meeting of Jeff. Julio will continue as chair and Bob Blum agreed on replacing Jeff. 

Net Meeting 15-16 April - By Invitation only. Julio / Phil / Cristian chairs



Wrap up and next meeting

Wrap up and Next meetings:  

 

All meetings at 0800 PT/0900 MT/1000 CT/1100 ET/1300 CLT (subject to time changes)

Action items 

  •  
  •