Date/Time
8am PT
Meeting Online Connections:
Blue Jeans
To join the Meeting:
https://bluejeans.com/153579667
To join via Room System:
Video Conferencing System: bjn.vc -or-199.48.152.152
Meeting ID : 153579667
To join via phone :
1) Dial:
+1.408.740.7256
+1.888.240.2560
+1.408.317.9253
(see all numbers - http://bluejeans.com/numbers)
2) Enter Conference ID : 153579667
Meeting Recording
Attendees
- Jeff Kantor (JK)
- Julio Ibarra (JI) (not available)
- Unknown User (rlambert) (RL)
- Unknown User (kollross) (MK)
Jeronimo Bezerra (JB)
Humberto Galiza (HG)
Albert Astudillo (AA)
Goals
- Discuss use of Confluence and lsst-net@lists.lsst.org mailing list
- Discuss requirements and verification plans
Discussion items
Time | Item | Who | Notes |
---|---|---|---|
Using confluence and lsst-net@lists.lsst.org for NET communications | Jeff Kantor | How to view actions, update pages, post messages, browse archives, etc. | |
NET Action Items Status | Jeff Kantor | Review open action items: Unknown User (kollross) reported on IN2P3 information. Jeff Kantor confirmed that we will have 3 design-level network documents (lead): LSE-xxx Summit - Base ITC Design Document will cover design of Summit - Base (AURA, Tiger Team) LSE-78 will provide overview of all networks and design of Base to Chicago (AURA, FIU) LSE-xxx will cover Champaign - Chicago - Lyon (NCSA) | |
Requirements Clarifications and Verification Plans | Jeff Kantor | Discussion on consistency of requirements in LSE-61, LDM-142, etc. ACTION from last meeting. Updated Bandwidth Reservations Sheet | |
Wrap up and next meeting | Jeff Kantor | Next meeting date and agenda topics: June 22nd 2017 10AM EST: Link: https://bluejeans.com/712327980 |
Action items
- Unknown User (kollross) to get IN2P3 scope of work and confirm NCSA - IN2P3 bandwidth requirements, get more details about the 20G Ethernet service
- Jeff Kantor ensure traffic types referenced in LDM-142 are defined in LSE-78. Updated due date, this is in work and will be in the next LSE-78 LCR, goal is before LSST 2017.
- Jeff Kantor Unknown User (kollross) to update LSE-78 with the connectivity from ESNET/Chicago to LSST. ESnet request/negotiations complete, date updated again.
- Unknown User (kollross) to provide information on NCSA plans for dedicated wave, 500G backbone, etc.
- Jeronimo Bezerra to update the LSST End to End Test Plan to address his 100G concerns discussed during the meeting
- Jeronimo Bezerra to update the bw_reservation.xlsx and share it with NET
1 Comment
Jeff Kantor
Albert Astudillo reported he has no comments on the E2E Test Plan following the meeting.