Agenda & Notes

Update & dates for the the factoring design review [Francisco]

    • All hands meeting at SLAC week of Feb 9; (Michael will attend)
    • Francisco in TUS week of Feb 2 and Feb 9 
    • Francisco  in Tucson Feb 18-19 for 2nd verison of OCS Interface meeting (Michael to attend?) 
    • Proposed data Feb 2 for factoring design review - all in Tucson
    • Need Camera Team kinematics of filter change to include in model
    • Refactoring of code needs discussion - kem, francisco, michael - set up for mon/tues next week - help to detail better way to implement the current plan, and divide activities between opsim and scheduler team Monday at 9:30 PST/12:30 EST 2:30pm Chile -

OpSim & EUPS; visitTime - status [Michael]

    • One set to 0 and should be 34 - never touched so switched at the write; VisitExpTime is 34 (defaults to 30 if not specified - needs fixing) but WLProp configs all specify; Used too many places to change right now.  Suggest doing as part of refactor - code is essentially not maintainable - too much unused code, dead code, entanglement. Will figure out process flow and algorithms and document in the near future.  Anticipate a restructure of code as a result. At the write to ObsHistory table - put in the right numbers (cosmetic fix); make sure it works properly with modifySchema and MAF. Will go ahead and fix on a branch now.  Can also at this time put in the username and hostname work properly - write the correct values into Session table (most mahines don’t have env HOSTNAME set. 

Need EUPS installed to run OpSim - check out code and type scons to get packages that are defined there.

    • Not in the stack system yet; Simon can try out an install where they don't have a database.
    • Sign off, and Simon will help get it into EUPS universe.
    • Set up in it's own place - eups distrib install sims_operations - Michael and Simon will work on the build side

OpSim & Configuration file management – Demo [Michael] - next time

Workflow signoff [Cathy] - https://confluence.lsstcorp.org/display/SIM/Unified+JIRA+Workflow+proposal

    • Frossie - do change in 2 next weeks
    • Next step combine both Opsim and CatSim (ask Andy about PhoSim) rename components or otherwise handle

Close Sprint 16  setup Sprint 17 [Kem]

    • MAF issues - close to signoff - offline access test - Lynne offered to telecon  to review.
    • Discuss NES and time spent on DD - side discussion on non-wfd proposals - Kem will set up a time to discuss.