DRAFT

This is a draft - the suggested contact points remain to be confirmed by T/CAMs and the DM Project Manager.

Contents

Introduction

See DMS Requirements and Design Documents for context, particularly the "Interface Control Documents and Support Documents" section.

For much of the LSST design period and the first three years of construction, the primary contact point in DM for most ICDs was the "DM Interface Scientist", Gregory Dubois-Felsmann.

As part of the growth of the team and the maturation of the construction process, we are transitioning to having each ICD have as its primary DM contact a person with direct responsibility for the DM component(s) on which the interface "lands" - the ones responsible for implementing it.

This page is intended to direct interested parties to the appropriate contact persons for each ICD involving DM.  It would be useful to expand it with partner subsystem contacts as well.

Table of DM ICDs and Associated Support Documents (see also Collection-5201)

DocumentTitle

Notes

Key Components (see LDM-294 Appendix A)DM ContactOther interested parties in DM
LSE-69Interface between the Camera and Data ManagementCamera events and telemetryLevel 1 System, L1 OCS ComponentsJim ParsonsScience Pipelines (for the metadata content)
LSE-68Camera Data Acquisition InterfaceCamera image dataArchiver, Catchup Archiver, Prompt ProcJim Parsons
LSE-130 (S)Support-Data Exchanges between Data Management and CameraCamera as-built information provided to DM
Science Pipelines designee






LSE-75Control System Interfaces between the Telescope & Data ManagementPointing and WCS feedback to the telescope
Eric BellmJim Parsons
LSE-76Infrastructure Interfaces between the Summit Facility and Data ManagementWithdrawn
(see LSE-299, Summit Computer Room Requirements, not an ICD)
LSE-299 (S)Summit Computer Room RequirementsSpecifications for the construction and physical environment of the Summit computer room


LSE-77Infrastructure Interfaces Between Data Management and the Base FacilityWithdrawn
(see LSE-239, Base Facility Data Center Design Requirements, not an ICD) 
LSE-239 (S)Base Facility Data Center Design RequirementsSpecifications prepared for design/build contractor


LSE-78 (S)LSST Observatory Network DesignSummit and Base LANs and WANDM NetworksJim Parsons, NCSA WAN contact
LSE-140Auxiliary Instrumentation Interface between Data Management and TelescopeCalibration spectrometer, dome screen, etc.
Jim Parsons, Merlin Fisher-Levine






LSE-72OCS - Data Management Software Communication InterfaceDM OCS-visible devices/components and EFD archiving
Jim ParsonsFelipe Menanteau, Level 1 science payload expert
LSE-70 (S)LSST Observatory Control System Communication Architecture and ProtocolOCS middleware communications


LSE-209 (S)Software Component to OCS Interface Control DocumentStates and commands for OCS-visible devices/components


LSE-74 (S)System Dictionary and Telemetry Streams









LSE-131Interface between Data Management and EPO

Kian-Tat LimGregory Dubois-Felsmann