Attendees
Notes
- Christopher Waters
- Sky correction.
- cp_verify is reviewed. Time to write new tests.
- Aim for May 15th to have bias, dark, flat, and ptc able to be automated at the summit.
- Andrés Alejandro Plazas Malagón
- Demonstrating calib production at the summit:
- Now works for bias, dark, flat, ptc, defects, bfk.
- Write configuration for running at the summit.
- Looking at variance planes.
- Robert Lupton
- It would be good to get a list of diagnostic plots that we will want for cpp/cp_verify/certification.
- Written in such a way as to be something we can hand off to observers.
{"serverDuration": 125, "requestCorrelationId": "80799ff50258e947"}