Attendees

  • None, due to internet troubles.

Notes

  • Merlin Fisher-Levine
    • Work closely with Jérémy,
    • tidying up the Spectractor output, fixing bugs and warnings, and improving the quality of the reductions.
    • Re-reduce the data and relink that as the nominal reduction if progress is significant.
  • Andrés Alejandro Plazas Malagón
    • Week of April 5th: merged DM-29272 (fixes DM-27197, and closes DM-28588 too), reviewed DM-29589 and DM-27650, merged DM-29569 (bug with PTC found by Craig), merged DM-24762 (PTC sigma clipping correction in var, cov), verified that gen3 calibration products successfully run at NCSA (/repo/main/u/plazas) using ComCam data (documented in DM-29618).

    • Next: The second half of DM-29618 calls for generating the calibrations at the summit. @rhl: is it true that to move on with this IHS-4737 has to happen first, or is there something I could be doing now?

    • Work on tickets listed under s21b-drp-detector , e.g, DM-26037

  • Christopher Waters
    • Last week I tried to clear out my backlog of small/old cpp/isr tickets.
    • This week will be continuing to deal with the rebase consequences of that
    • pushing to get cp_verify through review.
    • It sounds like creating skyCorr is soon to be an issue for other parts of DM, so getting that converted to gen3 is also on the list.
    • also have a largely functional display_astrowidgets (based in large part on display_ginga)