Attendees
- None, due to internet troubles.
Notes
- Merlin Fisher-Levine
- Work closely with Jérémy,
- tidying up the Spectractor output, fixing bugs and warnings, and improving the quality of the reductions.
- Re-reduce the data and relink that as the nominal reduction if progress is significant.
- Andrés Alejandro Plazas Malagón
Week of April 5th: merged DM-29272 (fixes DM-27197, and closes DM-28588 too), reviewed DM-29589 and DM-27650, merged DM-29569 (bug with PTC found by Craig), merged DM-24762 (PTC sigma clipping correction in var, cov), verified that gen3 calibration products successfully run at NCSA (/repo/main/u/plazas) using ComCam data (documented in DM-29618).
Next: The second half of DM-29618 calls for generating the calibrations at the summit. @rhl: is it true that to move on with this IHS-4737 has to happen first, or is there something I could be doing now?
Work on tickets listed under s21b-drp-detector , e.g, DM-26037
- Christopher Waters
- Last week I tried to clear out my backlog of small/old cpp/isr tickets.
- This week will be continuing to deal with the rebase consequences of that
- pushing to get cp_verify through review.
- It sounds like creating skyCorr is soon to be an issue for other parts of DM, so getting that converted to gen3 is also on the list.
- also have a largely functional display_astrowidgets (based in large part on display_ginga)