Location
Browser | Room System | Phone Dial-in |
---|---|---|
| Dial-in numbers:
Meeting ID: 293724745 |
(back to the list of all DMLT meeting minutes)
Time
10:00am PT
Regrets:
Guidelines: Propose items in line with the meeting rationale (see above); include as much information in the agenda notes; summarize, don't go into details while on the call; maximize time available for discussion.
Time | Item | Who | Notes |
---|---|---|---|
xx min | Overdue RFCs | RFCs with "Planned end" past "now".
| |
xx min | Outstanding DMLT actions | See links and action item report below. | |
xx min | Change Control Board report | Possible Change Control Board meeting.
| |
xx min | JTM retrospective | ||
xx min | Miscellaneous | ||
DMLT Travel & Availability This Week | |||
Matters arising | |||
Common entity definitions | Mario Juric, Architecture | Mario Juric expressed concern that we have conflicts in the way we use common terminology within DM. To some extent this had been covered in the distant past by the Enterprise Architect "domain model", but this is now defunct. Should we start a new collection of definitions? Gregory Dubois-Felsmann noted that there are two relevant project-level documents, one on acronyms and abbreviations (Document-11921) and one on definitions (Document-14412), which are still being maintained. (They are even mentioned in the OSS.) Kian-Tat Lim mentioned that there are several other similar documents that have been started over the years on Trac and Confluence. Tim Jenness requested that pointers to all these be sent to him.
|
Postponed for subsequent DMLT / proposed for future DMLT:
Time | Item | Who | Notes |
---|---|---|---|
Add new items here.... |