CatSim and Sky model
Scott
- New interface for opsim outputs (sqlite + new db format)
- DONE
- Validation on phosim/catsim SED normalization & magnitudes
- NOT DONE
- Use new interface to implement realistic (sky background) noise in GalSim
- DONE FOR CATALOGS not GALSIM
- Refactor photometry code in catsim (make sure vectorized)
- DONE
- Implement realistic noise in photometry mixin
- DONE
- Rework variability model & interaction with catsim
- NOT DONE
Peter:
- Review ESO papers and out current data. Present plan for sky model (1 wk)
- DONE
- Review Opsim data structure needs for full-sky calculations (1 wk)
- DONE
- Develop modules to output SED for each sky component (moon, upper atm, lower atm, etc) (4 wk)
- DONE
- Compare SED models to all-sky camera observations. (1 wk)
- DONE
MAF/Performance
Peter
- Refactor plotting and driver (2 wk)
- DONE
- Paper hack (1 wk)
- NOT DONE
- Tucson March meeting (1 wk)
- DONE
- DONE
Lynne
- Solar System Metrics (1 month)
- NOT DONE
- Work with Peter on refactor plotting & driver & database
- DONE
- Paper hack (1 week + )
- NOT DONE
- Tucson March meeting (1 wk)
- DONE
- Prepare 10 minute talk with Simon for DESC meeting (1-2 days)
- DONE
- SRD and community metrics with Cathy & Zeljko (2 weeks)
- DONE
Opsim
Kem
- Rerunning tier 1 with v3.2.1 code
- DONE
- New reference run
- Lynne testing it - close
- Push LSE-190 (requirements document)
- NOT DONE
- Rolling cadence testing and improvements
- DONE
- Tier 2 runs
- NEXT QUARTER
- Create solar system proposals (SS Deep drilling, perhaps NEO sweet spot)
- UNKNOWN
- Sensitivity analysis for changing parameters and balancing proposals (with Cathy)
- WAIT TILL REFACTORING
- WAIT TILL REFACTORING
Cathy
- MAF replacing SSTAR
- DONE
- New reference run
- Lynne testing it - close
- Lynne testing it - close
Michael
- Parameter management process (moving to pex config)
- PUT OFF TO REFACTOR
- Refactoring review & start refactoring process
- DONE
- Create telemetry streams
- NEXT QUARTER
- Extend WFD proposal to arbitrary number of visits (instead of just pairs)
- NEXT QUARTER - PUSH TO REFACTOR
Andy -
- Docker with Opsim etc
- DONE
- Scheduling workshop -- March 16-20 in Tucson.
- DONE
Alerts
Darko & Veljko
- communication with comet to do independent testing of format
- IN PROGRESS
- testing of speed and comparison of different protocols
- NOT DONE
- publishing code in sims/DM format
- DONE
- installing ESPER and testing communication with alertsim
- IN PROGRESS
- generating cutouts (phosim/galsim??)
- IN PROGRESS
- inclusion any new developement in variable star/galaxy class (i.e. SN...) if feasible..
- NOT DONE