News, announcements and task review

All

Faro paper submitted to SPIE. Draft: dmtn-211.lsst.io . Acceptance notification from SPIE is 06 Apr 2022, so nothing more to do until then. 


  • Along with other changes in Rubin leadership, there will be a reorganization of SIT-Com. Plan by the AMCR.

CI status, bugs, issues of the week

All
  • CI job has not been running for a week. There is an issue with Jenkins. Jobs so slow that they don't finish. KT is on it.
  • The new weekly should have the fix for non-deterministic wiggles in metric values. Since dashboard hasn't been running, Jeff is running his own tests.
  • When source tables are combined into a single parquet table, they are combined in a random order. Eli implemented change to enforce ordering by detector so that repeatable. Before fix, FGCM was getting slightly different calibrations each run. The algorithms have an order dependence.
    • This gives us a sense of the systematic floor of the algorithms
  • Separate issues. Require 50 repeated measurements to compute photometric repeatability. Jeff will change configuration for the CI jobs to be 20. yaml configs.
Faro Development status 
  • Fall 2021 epic
  • Backlog epic: 
  • Progress on conversion to parquet
  • Last week merged ticket so that refcat loader gives a single merged dataframe that includes refcat columns + proper motion corrected astrometry and color-term-corrected photometry 
  • Dan Taranu had developed a matcher. To use, we would do matching before the measurement task
  • Jeff and Peter working on selectors. There is PR. Once this is merged we can finish converting metrics to use parquet format 
  • ATLAS REFCAT2 RFC. General support to move forward. Closes tomorrow. Already shared up in the desired format.

Data processing campaigns  

  • RC2/DC2 reprocessing epic :
    • w_2021_40 RC2:  
    • w_2021_44 DC2 :
  • AuxTel
  • AP/DiffIm

DP0.2

Faro for DP0.2


AOB

Potential co-working session ideas here

Next meeting Homework task for everyone to take a look at tickets from the previous development epic and we'll do a big review of status + planning for new development cycle next week.


List of tasks (Confluence)