Date/Time

(all-day Face to Face Meeting in Santiago, Chile)

Agenda

https://www.amlight.net/?p=3362

(SAACC agenda on same page)

Meeting Notes

REUNA, Albert Astudillo

Current Implementation

October Goal

RNP, Aluizio

100G channel for LSST thru RNP network

LSST through RNP network: Equinix SP4 - POP-SP

LSST through RNP network: Equinix SP4 - POP-SP

POP-SP to POP-PR

POP-PR to POP-RS

Infrastructure for LSST outside RNP network (1)

Base to Summit Optical circuits - Ron Lambert

AURA La Serena - Ron Lambert

July Transfer Path - Ron Lambert

LHN Transfer Path

AmLIght, Jeronimo

SP3 to MI3 - AMLIGHT - wet network

SP3 to SP4 - RNP and ANSP

Patch cords, switch, transceivers - ANSP

MI3 to MI1 - dark fiber - dry network

Goal is to activate 400G.

Next Steps: Going North

2019:

2020/2021:

NCSA, Matt Kolross

ICCN

Optical protected waves is possible.  Can support 200G and 400G waves in the future.

WAN Connections

ESnet 600 W. Chicago Level 3

MREN 710 N. Lakeshore Dr. - StarLight

NPCF

Green is 40G.  Red is 100G.

This is today.

Action: What is NPCF diagram going to look like when ESnet circuits come in.  

JB: ESnet circuits will be new ports.  By 2020 ESnet will provide physical ports, directly from the optical device.

Action: Depict what ESnet circuits will look like.

Action: Paul Wefel: diagram that shows connections into the NPCF diagram.

JB: ESnet will pay only for their side of the connection.

Action: Matt and Paul: Confirm what will the actual config look like inside W. Chicgao and 710 N. Lakeshore, in fy20 and fy21.

Need the interconnection config - connections between ESnet and NCSA.

Other

Futures

IN2P3

Baseline plan requires IN2P3 to provide at least 10G.  Not documented in a signed agreement.

Diagrams from Sessions 1 and 2:

Action: Consolidate diagrams from each operator into a single physical network diagram.  If there are details in a particular network, its representative to diagram the details in a separate diagram using the templates provided by Jeronimo.

Session 3: Logical Topology

Refer to By Oct 1, 2019 diagram in Jeronimo’s slides.

Diagram 1:

Diagram 2:

Refer to questions in diagram.

Diagram 3:

Clarify ! (single points of failure)

JK comment: Do not have to be fully redundant until last milestone on the milestone spreadsheet.

Session 3: Planning the logical topology

LSST and NCSA will manage end points

Ron’s concern: so many vlans.

MK: imagining 2 vlans.

AA: today: 3 sets of vlans today from the AURA router to the AMPATH router.

JB: would be good to have 3 vlans e2e.

JB: Do we want predictability?

Who is preparing the IP plan for the receivers and forwarders?

Will IP blocks be public or private?

REcommendation: Stick to the plan.

Static vlans across two routers, and loopback BGP session between two routers.

Action: LHN IP Plan to be completed by Ron.  Confirm plan with Luis Coral.

Outcome: Update table from the 2017 report.

Session 5 - Establishing LSST Virtual NOC, Jeff Kantor

VNOC Vision

Customer experience is a single network, not 5 networks.

.5 FTE network eng at FIU and REUNA.  1.0 FTE at NCSA and La Serena.

LSST Help Desk could be first PoC.  Can generate a ticket.

LSST Help Desk should be able to interact with the VNOC.

How much can LSST burden the LSST HD?

Monitoring and alarming should be 24/7.  What is the LSST engineer staffing support model?

SLA for LSST Ops has not yet been written.

Goal: Integrated view of the complete network status.

Action: Define a data schema of all the data object that’s required.

Weather map for LSST users to see health of the network.

Consolidate data.  Identify trends.

Action: By end of 2019 fy a budgeted, costed, scheduled plan of steps and implementation of plan will run with a capability in place by 2021.

Actions:


3 FTE engineering total. Can we get 24x7x365 coverage?

All the operators have 24x7x365 NOCs.

Session 4: E2E Test Plan, Pescador

LSST E2E Test plan document.

Action To NCSA: Necessary to upgrade pS node operational system.

Test Specifications:

OWAMP

What is the packet size?

Bandwidth:


pS provides both passive and active measurements.

Tests must eventually use the available path between LS and NCSA.

I2 has a Performance Assurance Methodology.  JB asked if I2 would share their methodology.  John Hicks said yes.

Action: Andres Villalobos to talk to JB about NetSage.

Next Steps:


Goal is to have a few nodes for testing and troubleshooting.

GridFTP test is used by NRP and I2.  Helpful to determine capabilities of DTN and to troubleshoot network.

Action: Demonstration session: Add to next monthly meeting.

Review milestone sheet

Action: Craft updates to LSE-78.

Should schedule the next F2F meeting within a year or 6 months.

Publish results.

Le Bistro.cl


Action items