(This page should ultimately be replaced by a JIRA query against the envisioned future JIRA reimplementation of the change request database, using labels to represent "DM is interested in this".  At the moment it is manually maintained.)

This page is manually maintained (primarily by Gregory Dubois-Felsmann and Tim Jenness).  It contains change requests originated by DM as well as ones from or affecting other LSST subsystems which the editors believe will be of interest to DM staff.  It also omits certain manifestly DM-related change requests that are primarily concerned with PMCS technicalities and will not be subject to full CCB action.  These change requests are always available by querying the database for DM-originated requests.  The editors welcome comments on this policy!

Principal references:

LCRTitleStateDocuments AffectedSummary and commentsRelated IssuesCCB meeting for decision
LCR-1403Update Base and Long-Haul Network Activities

LCR ASSIGNED

NA

The Base Network plan has been delayed relative to the baseline due to the updated schedule for construction and occupancy of the Base Facility. This LCR reflects the updated dates.

The US Network plan has been delayed while we coordinated with ESnet for dedicated 2 x 100 Gbps links between Atlanta and Chicago. The ESnet links provide additional path diversity and guaranteed latency for prompt processing over leased service from internet2. This coordination is documented in a request document and technical requirements document, which when finalized will be posted in docushare. The activities and dates in this LCR reflect the implementation plan and schedule for the ESnet links.



LCR-1375Update Base Data Center IT Installation and Configuration Activities

LCR ASSIGNED

NA

Add Base Data Center activities in PMCS



LCR-1395Proposed Data Rights Policy Document LPM-261

LCR ASSIGNED

LPM-261Codifies a proposed data rights and data access policy. Will require SAC review and agency approval.

LCR-1392Restore requirement to OSS from LSE-369 scheduler requirements

LCR ASSIGNED

LSE-30Add OSS-REQ-0378 back to OSS so that DM tracing will work correctly.LCR-899
LCR-1364Updated LSE-131 (EPO/DM ICD)

LCR ASSIGNED

LSE-131Mainly reduction of scope.

LCR-1353Reorganization of Early Integration Activities

LCR ASSIGNED

PMCSClarification and augmentation of the list of planned cross-subsystem early integration activities.

LCR-1344Add Performance Metrics to
LSE-61

LCR ASSIGNED

LSE-61Add database and image access requirements and ability to calculate science KPMs.

LCR-1343Revisions to LSE-239 Base Data Center Requirements

LCR ASSIGNED

LSE-239


LCR-1332Update LSE-30 (OSS) to Better Define OSS-REQ-0164

STUDIED

LSE-30Improves and modernizes the language concerning the definition of completeness and reliability tests for DM.

LIT-388 - Getting issue details... STATUS


LCR-1309Update DM Documentation Regarding Special Programs

APPROVED

LSE-29, LSE-30, LSE-61


LCR-1302LSR-REQ-0034 Clarification

APPROVED

LSE-29Clarify the requirement concerning the saving of Observatory engineering data and the like.

LIT-100 - Getting issue details... STATUS


LCR-1243Update LSE-239 Base Data Center Requirements

APPROVED

LSE-239

LSE-239 was developed to provide the definition of the Base Data Center (BDC) requirements for the Base construction contracts and the BDC Information Technology and Communications (ITC) infrastructure design. Since that version, much has been learned and the requirements have been migrated into the project SySML requirements model. A new version of LSE-239 has been prepared as a document generated from Magic Draw, and has also been substantially re-organized, to more cleanly separate those sections directly applicable to the Base Facility construction contract (Sections 1 - 3), versus those more targeted at the ITC infrastructure design (Appendices I and II). Finally, as the formerly baseline Tape Library has been recommended to be replaced in the BDC ITC design baseline (LCR-781 and follow-on), requirements related to the Tape Library have been deprecated into Appendix III.



LCR-1238Implement DM and OSS part of LCR-786

APPROVED

LSE-61, LSE-30


LCR-1230Update to LSE-75

STUDIED

LSE-75Defining feedback for Active Optics and guider. KTL rewording with more specifics after discussion with Sandrine.

LCR-1214Clarify DM's Level 1, 2, and 3 Terminology for the Science Community

APPROVED

LSE-163, LPM-231


LCR-1203Searchable - Interactive Nightly Reports

STUDIED


Need to determine what DM will need to do to meet this requirement.

LCR-1154Stand Up Data Access Rights Working Group - Put LPM-221 under Change Control

FULLY IMPLEMENTED

LPM-221


LCR-1070DM Milestones for Base LAN and Summit Network

FULLY IMPLEMENTED





LCR-1068Revised Commissioning Plan LSE-79

FULLY IMPLEMENTED

LSE-79


LCR-1065Date Update for the DM/EPO ICD Phase 3 Milestone

FULLY IMPLEMENTED





LCR-1064Add Priorities to LSE-61

FULLY IMPLEMENTED

LSE-61

Add priorities to the baselined version of the document that are already part of the MagicDraw model (added as part of DM-10647 - Getting issue details... STATUS )



LCR-1048Update Summit Network Installation Schedule

FULLY IMPLEMENTED





LCR-1034Auxiliary Telescope Spectrograph Instrument and Detector Schedule and Cost Update

FULLY IMPLEMENTED


Updates the schedule and cost of the procurement of the Auxiliary Telescope Spectrograph Instrument. Details of the change are not yet available ().



LCR-1024Tie LSE-163 into OSS

APPROVED

LSE-30 (OSS); others indirectly, LSE-61Resolves a long-running formal gap in our requirements flowdown. Makes the contents of the DPDD (LSE-163) authoritative in deriving DM-level requirements (i.e., in the DMSR, LSE-61) by stating in the OSS that the data products generated by DM shall conform to the DPDD.

LCR-1021Adjust Dates for DWDM Equipment Installation

FULLY IMPLEMENTED

PMCSNotes ~60 day delay in the installation of the Summit-Base and Base-Santiago DWDM equipment, triggered by late delivery from the equipment vendor. New schedule shows installations complete by roughly November 2017.

LCR-1018Follow up to New Camera Image Types (LCR-773) to flow down requirements to subsystem specs and ICDs

APPROVED

LSE-59, LSE-71; DM impact to be analyzed

Adds the new image types introduced by LCR-773 (New Camera Image Types) to the Camera requirements and OCS-Camera ICD. Superficially this doesn't require a response in DM-level documents; however, the exploitation of the new image types is driven by calibration requirements and so most likely they should eventually appear in DM documents.

Note that as of  LCR-773 itself is Approved but not Fully Implemented.



LCR-1013Place the LSST Science Platform Vision Document under Change Control

FULLY IMPLEMENTED

LSE-319


LCR-1006Update DM-OCS ICD, LSE-72, to reflect DM design changes and to match recent LSE-70/LSE-209

STUDIED

LSE-72, LDM-230Updates LSE-72 to match current design work. Incorporates changes from LCR-780 and LCR-888.


LCR-1005LSE-209 Software Component Document Reformat and Reqs Refresh 

REJECTED

LSE-209, likely LSE-72This is mostly a cleanup pass on a key OCS middleware definition document. The DM-to-OCS interface depends on its contents, so it's likely that some consequential changes to LSE-72 will be needed.

LCR-1004Withdraw LSE-77, "Infrastructure Interfaces Between Data Management and the Base Facility"

FULLY IMPLEMENTED

LSE-77, possibly LSE-239In 2015, the project shifted from the then-existing DM-to-T&S ICD LSE-77 to a new "Base Data Center Requirements" document, LSE-239, to capture the needs of DM for data center space at the Base. LSE-77 became effectively a dead letter in the process. This change request is intended to just clean that up.
Final result: LSE-77 has been withdrawn.

Vote initiated

LCR-983Integrate DM and Camera Data Systems Early

APPROVED

PMCS, possibly ICDs, LSE-61Perform additional early integration activities, notably around the use of the CCOB camera test facility to generate data to be ingested into DM on a regular basis.

LCR-974Update Network Requirements in LSE-61

FULLY IMPLEMENTED

LSE-61One new requirements, modifications to 3 others.

LCR-964Summit Computer Room Requirements Document

FULLY IMPLEMENTED

LSE-299 (new)Consolidates all planned compute hardware needed on the Summit (except what is actually in the domes).

LCR-963Summit - Base ITC Design Document

FULLY IMPLEMENTED

LSE-309 (new)

Product of Jeff Kantor's Summit-Base Tiger Team

Touches on almost all DM's interfaces with the other systems.



LCR-962Flowdown LSE-163 (DPDD) to LSE-61 (DMSR)

FULLY IMPLEMENTED

LSE-163, LSE-61Includes a handful of unrelated requirements changes/additions. Some text updates to DPDD.

LCR-943

Minor updates to LSE-63

FULLY IMPLEMENTED

LSE-63 (Data Quality Assurance Plan)LSE-63 has not been updated since 2011. This update includes some minor modernizations based on current best practice and removes mention that we are currently in R&D phase.

LCR-924Duplicate LSR Data
Performance Metrics in OSS for DM Flow Down

APPROVED

LSE-30 (OSS)

Flows LSR-REQ-0093, LSE-REQ-0094 and LSR-REQ-0097 to OSS so that DM can include them in DMSR for verification of the performance metrics (via LIT-276 - Getting issue details... STATUS ).



LCR-921DM to Provide Service for Publishing Predicted Visit Sequence

FULLY IMPLEMENTED

LSE-61 (DMSR)

Publish telescope position and predicted schedule to the community (via LIT-215 - Getting issue details... STATUS ).



LCR-908Keep all Data Releases loaded in databases

APPROVED

LSE-30 (OSS) and many subordinate documentsAdopt the following requirement: "The LSST project shall maintain user access to the contents of all Data Releases. This facility may be provided with reduced performance and capacity for Data Releases older than the most recent one, but be qualitatively identical otherwise." in place of the current policy of maintaining access only to the two most recent data releases. RFC-325 - Getting issue details... STATUS
LCR-900DM S17 Mid Cycle Replan

FULLY IMPLEMENTED

(PMCS)Implement S17b plans for NCSA, SQuaRE, and AP with some small tweaks to other subsystems.

LCR-899Scheduler Requirements Control

STUDIED

LTS-347, possibly LSE-62Promote the scheduler requirements in LTS-347 to project-level change control, moving them to an LSE-* document.

LCR-888Proposed Meta-data header client for LSST images

APPROVED

LSE-72, LDM-230, probably numerous othersProposes that a common Summit-Base service be created that extracts all observation metadata (from published telemetry or the EFD) intended to be packaged with the image files, storing an artifact containing all this metadata as "headers" for later retrieval.Q: Does this have anything to do with the reformatted EFD database? -XW
LCR-851Update to LSE-151

FULLY IMPLEMENTED

LSE-151 "Interface Control & Compliance Management Process"Clarifies language surrounding ICDs and documents that describe or actually are the implementations of the interfaces controlled by ICD.

2017-02-22

LCR-849

Update LSE-78 LSST Observatory Network Design

FULLY IMPLEMENTED

LSE-78LCR-849 is to make LSE-78 consistent with and refer to the Network Sizing document LDM-142.  Requested CCB if this can be voted on via the electronic voting process.  I think it is non-controversial and was discussed at some length in the DM TCT when we last updated LDM-142. It would be good to get this done, as there are a number of more significant changes to the same documents coming very soon as a consequence of Tiger Team activities.
2017-03-05 email vote
LCR-838Auxiliary Telescope Scheduler

LCR ASSIGNED

LTS-187 (draft: SPT-372)


LCR-836Typographic correction to LSE-69 to match LSE-130

APPROVED

LSE-69

This is a trivial typographic correction that was requested a long time ago in LIT-183 - Getting issue details... STATUS .

DM-9336 - Getting issue details... STATUS

2017-02-22

LCR-835Camera Heterogeneous Sensor Focal Plane

FULLY IMPLEMENTED


Implicitly sharpens requirements on ability to determine the correct pixel geometry upon data ingest from Camera to DM. May have an implication for the generation of difference imaging templates, at the (~annual) template-creation level and/or at the nightly template-warp-instantiation level.


2017-03-22 (status check only)

LCR-795

Updates to DM/EPO interface requirements (LSE-131)

FULLY IMPLEMENTED

LSE-131

See substantive discussion in the DM Leadership Team Meeting 2017-03-20.

LIT-97 - Getting issue details... STATUS

2017-03-22 (vote deferred)

LCR-788Transfer Task Framework from 02C.07 to 02C.06FULLY IMPLEMENTED


(PMCS)Moves the Task class and a cluster of related classes and interfaces to be a responsibility of the SLAC group.

LCR-787Commissioning Re-Plan 2016

FULLY IMPLEMENTED

LSE-79See also the February 2017 Commissioning Review.
Awaiting the report of the review committee. 


LCR-786Eliminate Base Network Outage Buffer; Expand Summit Camera Image Buffer

FULLY IMPLEMENTED

Unclear

Kevin Long is awaiting guidance on what WBS element to use for the additional budget for the enlarged buffer.

The "documents affected" is "Unclear" because it has not been completely decided whether to implement this as a change to requirements or as a specification that exceed the requirement. This is a separate question both at system and at Camera level.



LCR-785Observatory Operations Server

REJECTED

Unclear; may require a new ICD. Would also affect DM design documents.


LCR-783Commissioning Cluster Services

REJECTED

Appears in DM design documents


LCR-782Additional OCS Driven Services for Archive Center Access

APPROVED

LSE-72, possibly LSE-140Provide a means for the OCS to launch predefined batch processing actions at the Archive Center. Likely to be used for, e.g., producing synthetic calibration images following the collection of the input flats, bias frames, etc.

LCR-780Eliminate Engineering & Facilites Database Copies in Offline Archive Centers

APPROVED

LSE-72, LDM-230

Requires changing EFD interface with OCS to be the ingest to the Reformatted EFD.

: discussed at an OCS-DM meeting. Further discussions planned for .



LCR-773New Camera Image Types

FULLY IMPLEMENTED

LSE-30 (OSS)Adds requirements for a pinhole filter and for the capability to take filterless images.

LCR-747Unified LSST Authentication and Authorization Services

FULLY IMPLEMENTED

LSE-279Provides unified authentication and authorization technical services to assure authorized individuals access LSST services and systems.

2017-10-19 minutes

LCR-733LSST CCD, CCS, and DAQ for the Auxiliary Telescope SpectrographFULLY IMPLEMENTED


LSE-140 and many othersRequires consequential changes to LSE-140 because of the change to direct spectrograph-to-DM image retrieval.

The details of the timeline of capabilities required of DM to support the spectrograph, starting 8/2018, remain under analysis. 


LCR-687Alternate Standard Visit with 30s single exposure

FULLY IMPLEMENTED

LSE-29 (LSR), LSE-30 (OSS)Requires that DM be able to handle two types of standard visits: two 15s exposures, or one 30s exposure. Somewhat vague on the question of how closely the two types of visits could be interleaved.

2016-11-16 minutes

LCR-586Update LSE-209 Software to OCS ICD

APPROVED

LSE-209A further round of technical updates to the OCS-to-subsystem device interface. The draft already serves as the basis for the prototype and early integration work that is ongoing.

2017-03-22

LCR-581Calibration Hardware Requirements Update

FULLY IMPLEMENTED

LSE-30 (OSS), LSE-60, LSE-140 (DM ICD)


LCR-458Support for "Deep Drilling" observing scenario

PENDING


See LIT-325 - Getting issue details... STATUS for a task relating to unblocking this change request.