You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 108 Next »

Current Status

NORMAL


Report a problem

Upcoming Scheduled Maintenance

(All times are Project Time (Pacific))

StartEndEventLocation

Description

Systems/services that will NOT be availableStatus

Third Thursday of every month 06:00

Third Thursday of every month 08:00

Recurring-Monthly

Monthly lsst-dev maintenance

NCSA
  • Routine system updates.
Variable. Do not expect any lsst-dev system to be available during this period.

SCHEDULED

Every Mon. 04:00


Recurring- Weekly

Purge of GPFS /scratch partition
NCSA

Per LSST data management policies, files older than 180 days will be purged from the LSST shared (GPFS) /scratch file system.

Purge logs can be found in /gpfs/fs0/admin/purge_logs/scratch/

No outage or service disruption.

SCHEDULED

Every Tu. 08:00

Every Tu. 10:00

Recurring- Weekly

Weekly Nebula Maintenance

NCSARoutine system updates. Computational services continue to run.Horizon and API interfaces.

SCHEDULED

Thursday 2017-12-14 04:00

Thursday 2017-12-14 10:00

December lsst-dev maintenance

(off-schedule)

NCSA
  • Due to holiday schedules, the December maintenance event is being moved up 1 week, from 2017-12-21 to 2017-12-14
  • Routine system updates
  • Network switch replacement
  • lsst-db server replacement
  • Further details here
Do not expect any lsst-dev system to be available during this period.

IN PROGRESS

Saturday  

Tuesday  

Support over holiday breakNCSA2017-12-22 to 2018-1-01 (inclusive) is the University holiday period. Services will be operational. NCSA will respond to incidents based on business criticality.All services will be operational.

SCHEDULED

 09:00

 17:00

NebulaNCSANebula (OpenStack) will be shut down for hardware and software maintenance from January 2nd, 2018 at 9am until January 5th, 2018 at 5pm.All Nebula systems unavailable.

SCHEDULED

Previous Outages & Events

StartEndEventLocation

Planned Activities

Systems/services that will NOT be availableStatus
Tuesday 2017-11-28, 10:00TBDRolling reboots of PDAC qserv nodesNCSA
  • In order to address a spontaneous rebooting issue with some qserv nodes, firmware upgrades are being performed.
The occasional qserv node will need to be rebooted. Experience with the first couple will allow NCSA to give more precise information on the order and timing of the reboots.

COMPLETED

2017-11-20 7:002017-11-20 14:00Nebula Openstack cluster

NCSA

Nebula OpenStack cluster will be unavailable for emergency hardware maintenance. A failing RAID controller from one of the storage nodes and a network switch will be replaced.

Not all instances will be impacted. If any running Nebula instances are affected by the outage they will be shut down, then restarted again after we finish maintenance that day.

COMPLETED

Thursday 2017-11-16 06:00

Thursday 2017-11-16 10:00

Extended monthly lsst-dev maintenance

NCSA
  • Routine system updates.
  • Due to the volume of work that needs to be done, this event is being extended by 2 hrs. If systems become available before the end of the maintenance window, we will announce it here.
  • Be aware that this event will include an off-schedule purge of items in /scratch older than 180 days.
Do not expect any lsst-dev system to be available during this period.

COMPLETED

2017-10-31
NFS instabilityNCSANFS becomes intermittently unresponsive.

~STABLE

We are guardedly optimistic that this problem has been resolved. PDAC is now utilizing native GPFS mounts.

2017-10-24 09:50LSSTGPFS outageNCSAAll LSST nodes from NCSA 3003 (e.g., lsst-dev01/lsst-dev7) and NCPF (verify-worker, PDAC) that connect to GPFS (as GPFS or NFS) have lost their connection.GPFS

ONLINE

Storage is working to bring GPFS back online

2017-10-21 17:15

LSSTpublic/protected network switch is down in rack N76 at NPCF


nodes cannot communicate DNS, LDAP, etc. so largely cannot communicate with other nodes, e.g., no communication between affected verify-worker nodes and the Slurm scheduler on lsst-dev01, no communication between affected qserv-db nodes and the rest of qserv

Efffectively, the whole verification cluster

RESTORED

in progress, replacement switch is on order

Workaround in progress. If all goes well, systems should be back online by late afternoon.

2017-10-19 06:00

2017-10-19 14:00qserv-master replacementNCSA

qserve-master will be down so that systems engineering can finish configuring the new server and xfering files. Status updates here: IHS-378 - Getting issue details... STATUS .

qserv-master will be down for this entire period

COMPLETE

Archived events


DM Meetings and Events

NameDatesLocationNotes/links
JupyterCon 20182018/08/21-24New York City

https://www.oreilly.com/conferences/

Call for speaker: 2018/01 - 2018/02

LSST2018 Project & Community Workshop2018/08/13–17Tucson, AZ

LSST@Europe3

2018/06/11–15Lyon, France
SPIE 20182018/06/10-15Austin, TXSPIE Conference in Austin, Meeting: 10 June – 15 June 2018
IVOA InterOp Northern Spring2018/05/28- 06/01CADC, Victoria, BC
DMLT face to face2018/05/22-24SLAC or UW
Python in Astronomy 20182018/04/30- 05/04New York, NYDeadline for applications is December 9th.
DM Joint Meeting with Systems Engineering2018/03/06-08IPAC, Pasadena, CA
DESC Meeting2018/02/05–09SLAChttps://confluence.slac.stanford.edu/display/LSSTDESC/February+2018+Collaboration+Meeting+-+SLAC
Jupyter Widgets Workshop2018/01/23-26Saclay, FranceDeveloper-centered workshop at CMAP Laboratory at Ecole Polytechnique. Some details at end of this Github thread, or contact Sylvain Corlay sylvain.corlay@gmail.com
DM Gen. 3 Middleware Meeting2018/01/22-25Princeton, NJInternal DM meeting to further developer SuperTask/Butler designs and do some collaborative development. Agenda and list of attendees are still in progress.

DM Boot Camp 2

TBD
231st AAS Meeting2018/01/08–12Washington, DC
Towards Science in Chile with LSST in Chile2017/12/13-15Santiago, Chilehttps://www.lsst-chile.cl/2017-workshop


  • No labels