(This page should ultimately be replaced by a JIRA query against the envisioned future JIRA reimplementation of the change request database, using labels to represent "DM is interested in this".  At the moment it is manually maintained.)

Items with a RED state value are ones being considered in the current CCB cycle.

LCRTitleStateDocuments AffectedSummary and commentsRelated IssuesCCB meeting for decision
(unassigned)Follow up to New Camera Image Types (LCR-773) to flow down requirements to subsystem specs and ICDs

PROPOSED

LSE-59, LSE-71; DM impact to be analyzedAdds the new image types introduced by LCR-773 (New Camera Image Types) to the Camera requirements and OCS-Camera ICD. Superficially this doesn't require a response in DM-level documents; however, the exploitation of the new image types is driven by calibration requirements and so most likely they should eventually appear in DM documents.

LCR-1013Place the LSST Science Platform Vision Document under Change Control

LCR ASSIGNED

LSE-319


LCR-1006Update DM-OCS ICD, LSE-72, to reflect DM design changes and to match recent LSE-70/LSE-209

LCR ASSIGNED

LSE-72, LDM-230Updates LSE-72 to match current design work. Incorporates changes from LCR-780 and LCR-888.

LCR-1005LSE-209 Software Component Document Reformat and Reqs Refresh 

LCR ASSIGNED

LSE-209, likely LSE-72This is mostly a cleanup pass on a key OCS middleware definition document. The DM-to-OCS interface depends on its contents, so it's likely that some consequential changes to LSE-72 will be needed.

LCR-1004Withdraw LSE-77, "Infrastructure Interfaces Between Data Management and the Base Facility"

LCR ASSIGNED

LSE-77, possibly LSE-239In 2015, the project shifted from the then-existing DM-to-T&S ICD LSE-77 to a new "Base Data Center Requirements" document, LSE-239, to capture the needs of DM for data center space at the Base. LSE-77 became effectively a dead letter in the process. This change request is intended to just clean that up.

LCR-983Integrate DM and Camera Data Systems Early

LCR ASSIGNED

PMCS, possibly ICDsPerform additional early integration activities, notably around the use of the CCOB camera test facility to generate data to be ingested into DM on a regular basis.

LCR-974Update Network Requirements in LSE-61

LCR ASSIGNED

LSE-61One new requirements, modifications to 3 others.

LCR-964Summit Computer Room Requirements Document

STUDIED

LSE-299 (new)Consolidates all planned compute hardware needed on the Summit (except what is actually in the domes).

LCR-963Summit - Base ITC Design Document

LCR ASSIGNED

LSE-309 (new)

Product of Jeff Kantor's Summit-Base Tiger Team

Touches on almost all DM's interfaces with the other systems.



LCR-962Flowdown LSE-163 (DPDD) to LSE-61 (DMSR)

FULLY IMPLEMENTED

LSE-163, LSE-61Includes a handful of unrelated requirements changes/additions. Some text updates to DPDD.

LCR-943

Minor updates to LSE-63

FULLY IMPLEMENTED

LSE-63 (Data Quality Assurance Plan)LSE-63 has not been updated since 2011. This update includes some minor modernizations based on current best practice and removes mention that we are currently in R&D phase.

LCR-924Duplicate LSR Data
Performance Metrics in OSS for DM Flow Down

LCR ASSIGNED

LSE-30 (OSS)

Flows LSR-REQ-0093, LSE-REQ-0094 and LSR-REQ-0097 to OSS so that DM can include them in DMSR for verification of the performance metrics (via LIT-276 - Getting issue details... STATUS ).



LCR-921DM to Provide Service for Publishing Predicted Visit Sequence

LCR ASSIGNED

LSE-61 (DMSR)

Publish telescope position and predicted schedule to the community (via LIT-215 - Getting issue details... STATUS ).



LCR-908Keep all Data Releases loaded in databases

LCR ASSIGNED

LSE-30 (OSS) and many subordinate documentsAdopt the following requirement: "The LSST project shall maintain user access to the contents of all Data Releases. This facility may be provided with reduced performance and capacity for Data Releases older than the most recent one, but be qualitatively identical otherwise." in place of the current policy of maintaining access only to the two most recent data releases. RFC-325 - Getting issue details... STATUS
LCR-900DM S17 Mid Cycle Replan

FULLY IMPLEMENTED

(PMCS)Implement S17b plans for NCSA, SQuaRE, and AP with some small tweaks to other subsystems.

LCR-899Scheduler Requirements Control

STUDIED

LTS-347, possibly LSE-62Promote the scheduler requirements in LTS-347 to project-level change control, moving them to an LSE-* document.

LCR-888Proposed Meta-data header client for LSST images

LCR ASSIGNED

LSE-72, LDM-230, probably numerous othersProposes that a common Summit-Base service be created that extracts all observation metadata (from published telemetry or the EFD) intended to be packaged with the image files, storing an artifact containing all this metadata as "headers" for later retrieval.Q: Does this have anything to do with the reformatted EFD database? -XW
LCR-851Update to LSE-151

FULLY IMPLEMENTED

LSE-151 "Interface Control & Compliance Management Process"Clarifies language surrounding ICDs and documents that describe or actually are the implementations of the interfaces controlled by ICD.

2017-02-22

LCR-849

Update LSE-78 LSST Observatory Network Design

FULLY IMPLEMENTED

LSE-78LCR-849 is to make LSE-78 consistent with and refer to the Network Sizing document LDM-142.  Requested CCB if this can be voted on via the electronic voting process.  I think it is non-controversial and was discussed at some length in the DM TCT when we last updated LDM-142. It would be good to get this done, as there are a number of more significant changes to the same documents coming very soon as a consequence of Tiger Team activities.
2017-03-05 email vote
LCR-838Auxiliary Telescope Scheduler

LCR ASSIGNED

LTS-187 (draft: SPT-372)


LCR-836Typographic correction to LSE-69 to match LSE-130

APPROVED

LSE-69

This is a trivial typographic correction that was requested a long time ago in LIT-183 - Getting issue details... STATUS .

DM-9336 - Getting issue details... STATUS

2017-02-22

LCR-835Camera Heterogeneous Sensor Focal Plane

LCR ASSIGNED


Implicitly sharpens requirements on ability to determine the correct pixel geometry upon data ingest from Camera to DM. May have an implication for the generation of difference imaging templates, at the (~annual) template-creation level and/or at the nightly template-warp-instantiation level.


2017-03-22 (status check only)

LCR-795

Updates to DM/EPO interface requirements (LSE-131)

PENDING REFINEMENT

LSE-131

See substantive discussion in the DM Leadership Team Meeting 2017-03-20.

LIT-97 - Getting issue details... STATUS

2017-03-22 (vote deferred)

LCR-788Transfer Task Framework from 02C.07 to 02C.06FULLY IMPLEMENTED


(PMCS)Moves the Task class and a cluster of related classes and interfaces to be a responsibility of the SLAC group.

LCR-787Commissioning Re-Plan 2016

STUDIED

LSE-79See also the February 2017 Commissioning Review.
Awaiting the report of the review committee. 


LCR-786Eliminate Base Network Outage Buffer; Expand Summit Camera Image Buffer

APPROVED

Unclear

Kevin Long is awaiting guidance on what WBS element to use for the additional budget for the enlarged buffer.

The "documents affected" is "Unclear" because it has not been completely decided whether to implement this as a change to requirements or as a specification that exceed the requirement. This is a separate question both at system and at Camera level.



LCR-785Observatory Operations Server

STUDIED

Unclear; may require a new ICD. Would also affect DM design documents.


LCR-783Commissioning Cluster Services

STUDIED

Appears in DM design documents


LCR-782Additional OCS Driven Services for Archive Center Access

STUDIED

LSE-72, possibly LSE-140Provide a means for the OCS to launch predefined batch processing actions at the Archive Center. Likely to be used for, e.g., producing synthetic calibration images following the collection of the input flats, bias frames, etc.

LCR-780Eliminate Engineering & Facilites Database Copies in Offline Archive Centers

STUDIED

LSE-72, LDM-230

Requires changing EFD interface with OCS to be the ingest to the Reformatted EFD.

: discussed at an OCS-DM meeting. Further discussions planned for .



LCR-773New Camera Image Types

APPROVAL PENDING

LSE-30 (OSS)Adds requirements for a pinhole filter and for the capability to take filterless images.

LCR-747Unified LSST Authentication and Authorization Services

FULLY IMPLEMENTED

LSE-279Provides unified authentication and authorization technical services to assure authorized individuals access LSST services and systems.

2017-10-19 minutes

LCR-733LSST CCD, CCS, and DAQ for the Auxiliary Telescope SpectrographFULLY IMPLEMENTED


LSE-140 and many othersRequires consequential changes to LSE-140 because of the change to direct spectrograph-to-DM image retrieval.

The details of the timeline of capabilities required of DM to support the spectrograph, starting 8/2018, remain under analysis. 


LCR-687Alternate Standard Visit with 30s single exposure

APPROVED

LSE-29 (LSR), LSE-30 (OSS)Requires that DM be able to handle two types of standard visits: two 15s exposures, or one 30s exposure. Somewhat vague on the question of how closely the two types of visits could be interleaved.

2016-11-16 minutes

LCR-586Update LSE-209 Software to OCS ICD

APPROVED

LSE-209A further round of technical updates to the OCS-to-subsystem device interface. The draft already serves as the basis for the prototype and early integration work that is ongoing.

2017-03-22

LCR-581Calibration Hardware Requirements Update

FULLY IMPLEMENTED

LSE-30 (OSS), LSE-60, LSE-140 (DM ICD)


LCR-458Support for "Deep Drilling" observing scenario

STUDIED





Principal references: