You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 33 Next »

(This page should ultimately be replaced by a JIRA query against the envisioned future JIRA reimplementation of the change request database, using labels to represent "DM is interested in this".  At the moment it is manually maintained.)

Items with a RED state value are ones being considered in the current CCB cycle.

LCRTitleStateDocuments AffectedSummary and commentsRelated IssuesCCB meeting for decision
LCR-908Keep all Data Releases loaded in databases

LCR ASSIGNED

LSE-30 (OSS) and many subordinate documentsAdopt the following requirement: "The LSST project shall maintain user access to the contents of all Data Releases. This facility may be provided with reduced performance and capacity for Data Releases older than the most recent one, but be qualitatively identical otherwise." in place of the current policy of maintaining access only to the two most recent data releases.

LCR-900DM S17 Mid Cycle Replan

APPROVAL PENDING

(PMCS)Implement S17b plans for NCSA, SQuaRE, and AP with some small tweaks to other subsystems.

LCR-899Scheduler Requirements Control

STUDIED

LTS-347, possibly LSE-62Promote the scheduler requirements in LTS-347 to project-level change control, moving them to an LSE-* document.

LCR-888Proposed Meta-data header client for LSST images

LCR ASSIGNED

LSE-72, LDM-230, probably numerous othersProposes that a common Summit-Base service be created that extracts all observation metadata (from published telemetry or the EFD) intended to be packaged with the image files, storing an artifact containing all this metadata as "headers" for later retrieval.Q: Does this have anything to do with the reformatted EFD database? -XW
LCR-851Update to LSE-151

APPROVAL PENDING

LSE-151 "Interface Control & Compliance Management Process"Clarifies language surrounding ICDs and documents that describe or actually are the implementations of the interfaces controlled by ICD.

2017-02-22

LCR-849

Update LSE-78 LSST Observatory Network Design

PENDING

LSE-78LCR-849 is to make LSE-78 consistent with and refer to the Network Sizing document LDM-142.  Requested CCB if this can be voted on via the electronic voting process.  I think it is non-controversial and was discussed at some length in the DM TCT when we last updated LDM-142. It would be good to get this done, as there are a number of more significant changes to the same documents coming very soon as a consequence of Tiger Team activities.
2017-03-05 email vote
LCR-838Auxiliary Telescope Scheduler

LCR ASSIGNED

LTS-187 (draft: SPT-372)


LCR-836Typographic correction to LSE-69 to match LSE-130

APPROVED

LSE-69

This is a trivial typographic correction that was requested a long time ago in LIT-183 - Getting issue details... STATUS .

DM-9336 - Getting issue details... STATUS

2017-02-22

LCR-835Camera Heterogeneous Sensor Focal Plane

LCR ASSIGNED


Implicitly sharpens requirements on ability to determine the correct pixel geometry upon data ingest from Camera to DM. May have an implication for the generation of difference imaging templates, at the (~annual) template-creation level and/or at the nightly template-warp-instantiation level.


2017-03-22 (status check only)

LCR-795

Updates to DM/EPO interface requirements (LSE-131)

PENDING REFINEMENT

LSE-131

See substantive discussion in the DM Leadership Team Meeting 2017-03-20.

LIT-97 - Getting issue details... STATUS

2017-03-22 (vote deferred)

LCR-788Transfer Task Framework from 02C.07 to 02C.06

LCR ASSIGNED

(PMCS)Moves the Task class and a cluster of related classes and interfaces to be a responsibility of the SLAC group.

LCR-787Commissioning Re-Plan 2016

STUDIED

LSE-79See also the February 2017 Commissioning Review.
Awaiting the report of the review committee. 


LCR-786Eliminate Base Network Outage Buffer; Expand Summit Camera Image Buffer

APPROVED


Kevin Long is awaiting guidance on what WBS element to use for the additional budget for the enlarged buffer.



LCR-780Eliminate Engineering & Facilites Database Copies in Offline Archive Centers

STUDIED

LSE-72, LDM-230

Requires changing EFD interface with OCS to be the ingest to the Reformatted EFD.

: discussed at an OCS-DM meeting. Further discussions planned for .



LCR-747Unified LSST Authentication and Authorization Services

FULLY IMPLEMENTED

LSE-279Provides unified authentication and authorization technical services to assure authorized individuals access LSST services and systems.

2017-10-19 minutes

LCR-733LSST CCD, CCS, and DAQ for the Auxiliary Telescope Spectrograph

APPROVED

LSE-140 and many othersRequires consequential changes to LSE-140 because of the change to direct spectrograph-to-DM image retrieval.

The details of the timeline of capabilities required of DM to support the spectrograph, starting 8/2018, remain under analysis. 


LCR-687Alternate Standard Visit with 30s single exposure

APPROVED

LSE-29 (LSR), LSE-30 (OSS)Requires that DM be able to handle two types of standard visits: two 15s exposures, or one 30s exposure. Somewhat vague on the question of how closely the two types of visits could be interleaved.

2016-11-16 minutes

LCR-586Update LSE-209 Software to OCS ICD

STUDIED

LSE-209A further round of technical updates to the OCS-to-subsystem device interface. The draft already serves as the basis for the prototype and early integration work that is ongoing.

2017-03-22

LCR-581Calibration Hardware Requirements Update

FULLY IMPLEMENTED

LSE-30 (OSS), LSE-60, LSE-140 (DM ICD)


LCR-458Support for "Deep Drilling" observing scenario

STUDIED





Principal references:

  • No labels