(This page should ultimately be replaced by a JIRA query against the envisioned future JIRA reimplementation of the change request database, using labels to represent "DM is interested in this".  At the moment it is manually maintained.)

Items with a RED state value are ones being considered in the current CCB cycle.

LCRTitleStateDocuments AffectedCommentsRelated Issues
LCR-851Update to LSE-151

PENDING

LSE-151 "Interface Control & Compliance Management Process"Clarifies language surrounding ICDs and documents that describe or actually are the implementations of the interfaces controlled by ICD.
LCR-849

Update LSE-78 LSST Observatory Network Design

LCR ASSIGNED

LSE-78

LCR-838Auxiliary Telescope Scheduler

LCR ASSIGNED

LTS-187 (draft: SPT-372)

LCR-836Typographic correction to LSE-69 to match LSE-130

PENDING

LSE-69

This is a trivial typographic correction that was requested a long time ago in LIT-183 - Getting issue details... STATUS .

DM-9336 - Getting issue details... STATUS
LCR-835Camera Heterogeneous Sensor Focal Plane

LCR ASSIGNED


Implicitly sharpens requirements on ability to determine the correct pixel geometry upon data ingest from Camera to DM.


LCR-795

Updates to DM/EPO interface requirements (LSE-131)

PENDING REFINEMENT

LSE-131


LIT-97 - Getting issue details... STATUS

LCR-787Commissioning Re-Plan 2016

STUDIED

LSE-79See also the February 2017 Commissioning Review.
Awaiting the report of the review committee. 

LCR-786Eliminate Base Network Outage Buffer; Expand Summit Camera Image Buffer

APPROVED


Kevin Long is awaiting guidance on what WBS element to use for the additional budget for the enlarged buffer.


LCR-780Eliminate Engineering & Facilites Database Copies in Offline Archive Centers

STUDIED

LSE-72, LDM-230Requires changing EFD interface with OCS to be the ingest to the Reformatted EFD.
LCR-733LSST CCD, CCS, and DAQ for the Auxiliary Telescope Spectrograph

APPROVAL PENDING

LSE-140 and many othersRequires consequential changes to LSE-140 because of the change to direct spectrograph-to-DM image retrieval.

The details of the timeline of capabilities required of DM to support the spectrograph, starting 8/2018, remain under analysis. 

LCR-581Calibration Hardware Requirements Update

FULLY IMPLEMENTED

LSE-30 (OSS), LSE-60, LSE-140 (DM ICD)

LCR-458Support for "Deep Drilling" observing scenario

STUDIED




Principal references: