(This page should ultimately be replaced by a JIRA query against the envisioned future JIRA reimplementation of the change request database, using labels to represent "DM is interested in this". At the moment it is manually maintained.)
Principal references:
LCR | Title | State | Documents Affected | Comments | Related Issues |
---|---|---|---|---|---|
LCR-795 | Updates to DM/EPO interface requirements (LSE-131) | PENDING REFINEMENT | LSE-131 | ||
LCR-849 | Update LSE-78 LSST Observatory Network Design | LCR ASSIGNED | LSE-78 | ||
LCR-838 | Auxiliary Telescope Scheduler | LCR ASSIGNED | LTS-187 (draft: SPT-372) | ||
LCR-836 | Typographic correction to LSE-69 to match LSE-130 | LCR ASSIGNED | LSE-69 | - DM-9336Getting issue details... STATUS | |
LCR-780 | Eliminate Engineering & Facilites Database Copies in Offline Archive Centers | STUDIED | LSE-72, LDM-230 | Requires changing EFD interface with OCS to be the ingest to the Reformatted EFD. | |
LCR-733 | LSST CCD, CCS, and DAQ for the Auxiliary Telescope Spectrograph | APPROVAL PENDING | Requires consequential changes to LSE-140 because of the change to direct spectrograph-to-DM image retrieval. The details of the timeline of capabilities required of DM to support the spectrograph, starting 8/2018, remain under analysis. | ||
LCR-581 | Calibration Hardware Requirements Update | FULLY IMPLEMENTED | LSE-30 (OSS), LSE-60, LSE-140 (DM ICD) |