Date
Attendees
Goals
- Review readiness to begin assembling the system
Discussion items
Time | Item | Who | Notes |
---|---|---|---|
NCSA status | Unknown User (jalt) |
| |
SLAC status |
| ||
IPAC status | Unknown User (xiuqin) |
| |
Planning | Gregory Dubois-Felsmann |
Action items
(See the Prototype Data Access Center work items page for a summary of past action items)
- Unknown User (xiuqin) Make sure can log in to SUIT server machines with all required privileges
- Loi Ly Make sure can log in to SUIT server machines with all required privileges
- Unknown User (xiuqin) Try running Firefly at NCSA
- Gregory Dubois-Felsmann Post an LSST calendar meeting entry for this meeting so people will get reminders
- Gregory Dubois-Felsmann, Unknown User (xiuqin), Fritz Mueller Meet about the detailed work schedule for the weeks through November
- Unknown User (xiuqin), Gregory Dubois-Felsmann Create tickets for portal design and construction, including a local test against WISE data
- Gregory Dubois-Felsmann Test NCSA VPN access