his page details the SOCS workplan with planned and actual storypoints.
Updated: 2015-10-29 12:33


SOCS Release v0.1 (SIM-1283)

Release Date: 2015-09-30

Statement of Work
  • Release OpSim Requirements document
  • Design SOCS independant of OpSim
  • Define and initiate SOCS code modules in SE Simulations repository
  • Prototype and benchmark Communications using current release of DDS-SAL-Python

OpSim Requirements Document (SIM-1267)

Planned Story Points = None

Statement of Work
  • Write OpSim requirements document
  • Ensure Scheduler requirements document reflects necessary interface
Issues

Number of Issues = 10

Key

Description

Status

Story Points

SIM-1274

Ensure requirements are captured in both documents

Done

4.0

SIM-1273

Arrange and hold meeting to review Scheduler Requirement doc.

Done

3.0

SIM-1272

Coordinate creation of diagram & narrative with Francisco

Done

3.0

SIM-1270

Add text from Sphinx on DB Architecture to Appendix C

Done

1.0

SIM-1269

Add text for configuration tables to Appendix B (parameters)

Done

4.0

SIM-1243

Update OpSim short term work plan

Done

4.0

SIM-1191

Draft 6month development plan for Scheduler coordinating with OCS

Done

1.5

SIM-1190

Draft 6month development plan for Scheduler coordinating with OCS

Done

1.5

SIM-1086

Draft of Epics / Issues for Obsim/Scheduler Dev plan & review backlog

Done

0.5

SIM-1085

Draft of Epics / Issues for Obsim/Scheduler Dev plan & review backlog

Done

0.5

 


Design and Prototyping for SOCS (SIM-1268)

Planned Story Points = None

Statement of Work
  • Create repository for new SOCS code
  • Create repository for DDS testing scripts
Issues

Number of Issues = 2

Key

Description

Status

Story Points

SIM-1246

Collect scripts for DDS tests

Done

4.0

SIM-1245

Create repository for sims_ocs

Done

2.0

 



SOCS Release v0.2 (SIM-1284)

Release Date: 2015-12-27

Statement of Work
  • Implement SOCS structure with interface
  • Implement simulation kernel with time simulator
  • Refactor and integrate observatory model
  • Implement observatory telemetry simulator
  • Implement simulation sequencer with targets handling
  • Refactor and integrate observations DB
  • Integrate with Scheduler
    • SOCS topics: telemetry for time and observatory conditions
    • Scheduler topics: next target from scripted proposal

Implement SOCS interface structure (SIM-1276)

Planned Story Points = 20.0

Statement of Work
  • SAL communication layer
  • Driver scripts
  • Configuration parameter system
  • DB interaction layer
Issues

Number of Issues = 4

Key

Description

Status

Story Points

SIM-1484

Create initial driver for simulation

In Review

1.0

SIM-1483

Setup initial configuration system

In Review

1.0

SIM-1451

Create parser and logging infrastructure

Done

1.0

SIM-1395

Remaining Story Points

To Do

25.0

 


Implement SOCS Simulation Kernel (SIM-1278)

Planned Story Points = 11.0

Statement of Work
  • Implement Time Handler interface
  • Implement Time Handler communication via DDS topics
  • Implement Sequencer interface
  • Implement Sequencer behavior for DDS topics on requested targets
  • Implement Sequencer behavior for handling observations
  • Implement Sequencer communication of observations (visits) via DDS topics
  • Implement DB interaction for recording visit information
Issues

Number of Issues = 4

Key

Description

Status

Story Points

SIM-1532

Implement initial sequencer behavior

In Review

2.0

SIM-1531

Implement initial time handler behavior

In Review

2.0

SIM-1530

Implement initial simulation driver class

In Review

2.0

SIM-1397

Remaining Story Points

To Do

13.0

 


Integrate and test with Scheduler v0.2 (SIM-1279)

Planned Story Points = 14.0

Statement of Work
  • Checking ability to run Scheduler from SOCS driver
  • Checking observatory telemetry communication between SOCS/Scheduler
  • Checking observation (visit) telemetry communication between SOCS/Scheduler
Issues

Number of Issues = 2

Key

Description

Status

Story Points

SIM-1533

Test time handling and observation communication

Done

3.0

SIM-1398

Remaining Story Points

To Do

19.0

 


Implement SOCS Observatory Model (SIM-1277)

Planned Story Points = 14.0

Statement of Work
  • Inherit from Scheduler Observatory Model
  • Implement interface for variational model
  • Implement observatory telemetry broadcast via DDS topics
  • Implement configuration parameter handling
  • Implement DB interaction for state record keeping
Issues

Number of Issues = 1

Key

Description

Status

Story Points

SIM-1396

Remaining Story Points

To Do

19.0

 


Implement production tools v0.2 (SIM-1280)

Planned Story Points = 39.0

Statement of Work
  • Design layout of post-processing reorganization
  • Create new repo and structure for tools
  • Refactor the current conversion tools
  • Implement functionality needed from v0.2 of SOCS
  • Setup structure for production pipeline
Issues

Number of Issues = 7

Key

Description

Status

Story Points

SIM-1575

test speed of new SSDs on production machines

In Progress

1.0

SIM-1540

Make changes in m5 calculation in modifySchema.sh

To Do

3.0

SIM-1538

Production Scripts: Complete running version of launch script.

In Progress

2.0

SIM-1537

Production Scripts: Complete the identification of all steps needed in the process with placeholders

Done

2.0

SIM-1535

Provide consulting on production pipeline scripts

In Progress

1.0

SIM-1438

Design & initial implementation of scripts for production pipeline

Done

8.0

SIM-1400

Remaining Story Points

To Do

51.0

 


Cadence Studies v0.2 (SIM-1319)

Planned Story Points = 33.0

Statement of Work

No description provided.

Issues

Number of Issues = 6

Key

Description

Status

Story Points

SIM-1542

Refine rolling cadence to count visits in the desired way.

To Do

5.0

SIM-1541

Support cadence science runs

In Progress

2.0

SIM-1539

Reconfigure OpSim text/links for new public website page under Simulations

Done

2.0

SIM-1399

Remaining Story Points

To Do

42.0

SIM-1081

generate and analyze permutations of reference runs with various auxiliary proposals

In Progress

3.0

SIM-957

Reference Run: Prepare written documentation and package for Change Control Board

In Progress

2.0

 



SOCS Release v0.3 (SIM-1285)

Release Date: 2016-05-20

Statement of Work
  • Refactor and integrate Astronomical Sky
  • Integrate Observatory Model slew and track behavior for observing visits
  • Implement observing behavior in simulation sequencer
  • Integrate DB storage of targets received and visits performed
  • Integrate and benchmark performance with Scheduler
    • Test multiple AD proposals survey with slew time cost and sky brightness
    • Test repeatability
    • Test speed under simulation

Implement SOCS Astronomical Sky (SIM-1302)

Planned Story Points = 19.0

Statement of Work
  • Assist Scheduler developer in using sims_skybrightness package for Scheduler classes
  • Inherit from Scheduler classes
  • Implement interface for variational model
  • Implement sky conditions telemetry broadcast via DDS topics
  • Implement configuration parameter handling
  • Implement DB interaction for record keeping
Issues

Number of Issues = 1

Key

Description

Status

Story Points

SIM-1401

Remaining Story Points

To Do

19.0

 


Enhancements for Observatory Model (SIM-1304)

Planned Story Points = 13.0

Statement of Work
  • Implement slewing and tracking behavior to simulate a visit
Issues

Number of Issues = 1

Key

Description

Status

Story Points

SIM-1402

Remaining Story Points

To Do

13.0

 


Enhancements for Sequencer (SIM-1305)

Planned Story Points = 13.0

Statement of Work
  • Add communication between Sequencer and Observatory Model for visit
  • Implement DB interaction for visit record keeping (targets and observations)
Issues

Number of Issues = 1

Key

Description

Status

Story Points

SIM-1403

Remaining Story Points

To Do

13.0

 


Implement Proposal Interface (SIM-1307)

Planned Story Points = 25.0

Statement of Work
  • Work with stakeholders to help Scheduler developer define necessary behavior
  • Implement configuration parameter passing via DDS topics
Issues

Number of Issues = 1

Key

Description

Status

Story Points

SIM-1404

Remaining Story Points

To Do

25.0

 


Integrate and test with Scheduler v0.3 (SIM-1308)

Planned Story Points = 23.0

Statement of Work
  • Ensure that SOCS/Scheduler still work together
  • Initial benchmarking of SOCS/Scheduler performance
  • Begin testing repeatability of SOCS/Scheduler system
Issues

Number of Issues = 1

Key

Description

Status

Story Points

SIM-1405

Remaining Story Points

To Do

23.0

 


Cadence Studies v0.3 (SIM-1320)

Planned Story Points = 52.0

Statement of Work

No description provided.

Issues

Number of Issues = 1

Key

Description

Status

Story Points

SIM-1406

Remaining Story Points

To Do

52.0

 


Implement production tools v0.3 (SIM-1365)

Planned Story Points = 56.0

Statement of Work

Continued work on Production tools

Ensure post-processing tools work
Begin exercising production pipeline
Develop any new MAF metrics for SOCS/Scheduler validation

Issues

Number of Issues = 1

Key

Description

Status

Story Points

SIM-1407

Remaining Story Points

To Do

56.0

 



SOCS Release v1.0 (SIM-1286)

Release Date: 2016-10-27

Statement of Work
  • Refactor and integrate Environment Model
  • Simulate weather telemetry, clouds and seeing
  • Incorporate filter swaps during new moon
  • Incorporate downtime simulator
  • Implement Scheduler configuration via commands
  • Integrate with Scheduler
    • Test with complete survey
    • Test repeatability
    • Test execution speed

Simulate weather telemetry, clouds and seeing (SIM-1340)

Planned Story Points = 20.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Incorporate filter swaps during new moon (SIM-1341)

Planned Story Points = 9.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Incorporate downtime simulator (SIM-1342)

Planned Story Points = 15.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Implement Scheduler configuration via commands (SIM-1343)

Planned Story Points = 20.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Integrate and test with Scheduler v1.0 (SIM-1344)

Planned Story Points = 23.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Refactor and integrate environmental model (SIM-1388)

Planned Story Points = 15.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Cadence Studies v1.0 (SIM-1389)

Planned Story Points = 57.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Implement production tools v1.0 (SIM-1390)

Planned Story Points = 68.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 



SOCS Release v1.1 (SIM-1287)

Release Date: 2017-04-18

Statement of Work
  • Support for previous release
  • Support Development for Area Distribution Look Ahead in Scheduler 1.1
  • Implement non deterministic weather simulator
  • Implement non deterministic downtime simulator
  • Integrate and test with Scheduler
    • Test survey with Area Distribution proposals and Look Ahead
    • Test speed performance
    • Test repeatability

Support Development for Area Distribution Look Ahead in Scheduler 1.1 (SIM-1345)

Planned Story Points = 12.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Implement non-deterministic weather simulator (SIM-1346)

Planned Story Points = 47.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Integrate and test with Scheduler v1.1 (SIM-1347)

Planned Story Points = 12.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Implement non-deterministic downtime simulator (SIM-1348)

Planned Story Points = 12.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Cadence Studies v1.1 (SIM-1392)

Planned Story Points = 62.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Implement production tools v1.1 (SIM-1393)

Planned Story Points = 74.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 



SOCS Release v1.2 (SIM-1288)

Release Date: 2017-08-24

Statement of Work
  • Support for previous release
  • Support Development for Time Distribution Look Ahead in Scheduler 1.2
  • Integration and test with Scheduler

Support Development for Time Distribution Look Ahead in Scheduler 1.2 (SIM-1350)

Planned Story Points = 59.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Support for previous release v1.1 (SIM-1414)

Planned Story Points = 12.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Cadence Studies v1.2 (SIM-1416)

Planned Story Points = 46.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Implement production tools v1.2 (SIM-1417)

Planned Story Points = 55.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 



SOCS Release v1.3 (SIM-1289)

Release Date: 2018-01-07

Statement of Work
  • Support for previous release
  • Evaluate and implement performance enhancements

Evaluate and implement performance enhancements (SIM-1352)

Planned Story Points = 76.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Support for previous release v1.2 (SIM-1418)

Planned Story Points = 12.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Cadence Studies v1.3 (SIM-1419)

Planned Story Points = 49.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Implement production tools v1.3 (SIM-1420)

Planned Story Points = 59.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 



SOCS Release v1.4 (SIM-1290)

Release Date: 2018-06-25

Statement of Work
  • Support for previous release
  • Implement warm start DB interface for Scheduler
  • Implement image quality feedback simulator
  • Implement degraded operational modes simulator
    • Constrained limits and/or speeds for mount, rotator, dome, optics.
    • Constrained availability of filters
  • Integrate and test with Scheduler
    • Test resuming partial surveys
    • Test variable image quality feedback
    • Test degraded modes

Implement warm start DB interface for Scheduler (SIM-1353)

Planned Story Points = 23.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Implement image quality feedback simulator (SIM-1354)

Planned Story Points = 23.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Implement degraded operational modes simulator (SIM-1355)

Planned Story Points = 23.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Integrate and test with Scheduler v1.4 (SIM-1356)

Planned Story Points = 26.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Support for previous release v1.3 (SIM-1421)

Planned Story Points = 12.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Cadence Studies v1.4 (SIM-1422)

Planned Story Points = 60.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Implement production tools v1.4 (SIM-1423)

Planned Story Points = 72.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 



SOCS Release v1.5 (SIM-1291)

Release Date: 2018-11-17

Statement of Work
  • Support for previous release
  • Implement spatial distribution for weather simulator
  • Integrate and test with Scheduler
    • Test dithering in Scheduler
    • Test spatial distribution for weather in a survey

Implement spatial distribution for weather simulator (SIM-1357)

Planned Story Points = 53.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Integrate and test with Scheduler v1.5 (SIM-1358)

Planned Story Points = 29.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Support for previous release v1.4 (SIM-1424)

Planned Story Points = 12.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Cadence Studies v1.5 (SIM-1425)

Planned Story Points = 52.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Implement production tools v1.5 (SIM-1426)

Planned Story Points = 62.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 



SOCS Release v2.0 (SIM-1292)

Release Date: 2019-04-12

Statement of Work
  • Support for previous release
  • Support Scheduler Implementation for publication of future targets schedule
  • Integrate and test with Scheduler

Support Scheduler Implementation for publication of future targets schedule (SIM-1359)

Planned Story Points = 70.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Integrate and test with Scheduler v2.0 (SIM-1360)

Planned Story Points = 12.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Support for previous release v1.5 (SIM-1427)

Planned Story Points = 12.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Cadence Studies v2.0 (SIM-1428)

Planned Story Points = 52.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Implement production tools v2.0 (SIM-1429)

Planned Story Points = 62.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 



SOCS Release v2.1 (SIM-1293)

Release Date: 2019-08-17

Statement of Work
  • Support for previous release
  • Implement weather forecast
  • Integrate and test with Scheduler

Implement weather forecast (SIM-1361)

Planned Story Points = 47.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Integrate and test with Scheduler v2.1 (SIM-1362)

Planned Story Points = 24.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Support for previous release v2.0 (SIM-1430)

Planned Story Points = 12.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Cadence Studies v2.1 (SIM-1431)

Planned Story Points = 46.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Implement production tools v2.1 (SIM-1432)

Planned Story Points = 55.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 



SOCS Release v2.2 (SIM-1294)

Release Date: 2020-01-10

Statement of Work
  • Support for previous release
  • Support Scheduler implementation of generic interface for optimization algorithms
  • Support Schedule Incorporation community provided optimizations

Support Scheduler implementation of generic interface for optimization algorithms (SIM-1363)

Planned Story Points = 35.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Support Scheduler incorporation of community provided optimizations (SIM-1364)

Planned Story Points = 47.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Cadence Studies v2.2 (SIM-1434)

Planned Story Points = 52.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 


Implement production tools v2.2 (SIM-1435)

Planned Story Points = 62.0

Statement of Work

No description provided.

Issues

Number of Issues = 0

 