You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 8 Next »

Major Objectives for 2015

Catsim:

Update data sets: bright stars, new galfast, (new galaxies?)

Complete the uncertainty functionality in postions/fluxes

Demonstrate we can ingest arbitrary data sets

Complete the CCD pixel prediction

PCA and speed optimization

Variability rework

Images:

Complete integration of galsim with catalogs (sky background - from opsim, rotation angle of telescope)

Parallelization of galsim

Validation of the PSF classes 

Investigate sensor effects for galsim

Site:

Complete the new sky model - add twilight (forward prediction model)

 

  • Need photodiode data (zero points)
  • All except twilight
  • Then transparency

integrate with catsim/opsim 

add cloud (this is an open question of how to implement cloud)

OpSim:

Complete the filter change (april 7th)

Reference run to Zeljko (Monday)

Complete refactoring to modular design (development path)

-- DDS eval (Michael)

-- extract scheduler

-- modularize the scheduler (constraints  specification)

-- Telescope model will be the initial design (one model for opsim and T&S)

-- simple scheduler information (ajc)


Prep for workshop

Rolling cadence Tier 2s (+others?)+

Cloud hosting (ajc) for TIer 1's

SRD metrics (email out the srd/science list and which have defined constraints)

Temporal constraint













CatSim and Sky model

Scott

  • New interface for opsim outputs (sqlite + new db format)
    • DONE
  • Validation on phosim/catsim SED normalization & magnitudes
    • NOT DONE
  • Use new interface to implement realistic (sky background) noise in GalSim 
    • DONE FOR CATALOGS not GALSIM
  • Refactor photometry code in catsim (make sure vectorized)
    • DONE
  • Implement realistic noise in photometry mixin
    • DONE
  • Rework variability model & interaction with catsim
    • NOT DONE

 

Peter:

  • Review ESO papers and out current data.  Present plan for sky model (1 wk)
    • DONE
  • Review Opsim data structure needs for full-sky calculations (1 wk)
    • DONE
  • Develop modules to output SED for each sky component (moon, upper atm, lower atm, etc) (4 wk)
    • DONE
  • Compare SED models to all-sky camera observations. (1 wk)
    • DONE

MAF/Performance

 

Peter

  • Refactor plotting and driver (2 wk)
    • DONE
  • Paper hack (1 wk)
    • NOT DONE
  • Tucson March meeting (1 wk)
    • DONE

Lynne

  • Solar System Metrics (1 month)
    • NOT DONE
  • Work with Peter on refactor plotting & driver & database 
    • DONE
  • Paper hack (1 week + )
    • NOT DONE
  • Tucson March meeting (1 wk)
    • DONE
  • Prepare 10 minute talk with Simon for DESC meeting (1-2 days)
    • DONE
  • SRD and community metrics with Cathy & Zeljko (2 weeks)
    • DONE

 

Opsim

Kem 
  • Rerunning tier 1 with v3.2.1 code
    • DONE
  • New reference run
    • Lynne testing it - close
  • Push LSE-190 (requirements document)
    • NOT DONE
  • Rolling cadence testing and improvements 
    • DONE
  • Tier 2 runs
    • NEXT QUARTER
  • Create solar system proposals (SS Deep drilling, perhaps NEO sweet spot)
    • UNKNOWN
  • Sensitivity analysis for changing parameters and balancing proposals (with Cathy)
    • WAIT TILL REFACTORING

Cathy 
  • MAF replacing SSTAR 
    • DONE
  • New reference run
    • Lynne testing it - close


Michael 
  • Parameter management process (moving to pex config) 
    • PUT OFF TO REFACTOR
  • Refactoring review & start refactoring process
    • DONE
  • Create telemetry streams
    • NEXT QUARTER
  • Extend WFD proposal to arbitrary number of visits (instead of just pairs)
    • NEXT QUARTER - PUSH TO REFACTOR


Andy -

  • Docker with Opsim etc
    • DONE
  • Scheduling workshop -- March 16-20 in Tucson.
    • DONE


Alerts

Darko & Veljko

  • communication with comet to do independent testing of format
    • IN PROGRESS
  •  testing of speed and comparison of different protocols
    • NOT DONE
  •  publishing code in sims/DM format
    • DONE
  •  installing ESPER and testing communication with alertsim
    • NOT DONE
  •  generating cutouts (phosim/galsim??)
    • IN PROGESS
  •  inclusion any new developement in variable star/galaxy class (i.e. SN...) if feasible..
    • NOT DONE






  • No labels