Comment: Added LCR-1426, updated LCR-1425

...

LCRTitleStateDocuments AffectedSummary and commentsRelated IssuesCCB meeting for decision
LCR-1426Refine LSE-68 DAQ-DM interface

Status
colourBlue
titleLCR Assigned

LSE-68Refine interface with regard to image naming, metadata, units, and events.

LCR-1425?Modify DMS requirements to include creation and display of HiPS and MOC data

Status
colourBlue
titleProposedLCR Assigned


LSE-61, then consequentially LDM-151, LDM-554, and the Sizing Model

Implements

Jira
serverJIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId9da94fb6-5771-303d-a785-1b6c5ab0f2d2
keyRFC-441
.



LCR-1420Update LSE-140 including LCR-733

Status
colourBlue
titleLCR Assigned

LSE-140This LCR applies LCR-733 to LSE-140 and corrects some other minor issues.  It does not attempt to fully define the telemetry items expected from the auxiliary instrumentation; that will be left for a later LCR.

LCR-1403Update Base and Long-Haul Network Activities

Status
colourBlue
titleLCR Assigned

NA

The Base Network plan has been delayed relative to the baseline due to the updated schedule for construction and occupancy of the Base Facility. This LCR reflects the updated dates.

The US Network plan has been delayed while we coordinated with ESnet for dedicated 2 x 100 Gbps links between Atlanta and Chicago. The ESnet links provide additional path diversity and guaranteed latency for prompt processing over leased service from internet2. This coordination is documented in a request document and technical requirements document, which when finalized will be posted in docushare. The activities and dates in this LCR reflect the implementation plan and schedule for the ESnet links.



LCR-1395Proposed Data Rights Policy Document LPM-261

Status
colourBlue
titleLCR Assigned

LPM-261Codifies a proposed data rights and data access policy. Will require SAC review and agency approval.

LCR-1392Restore requirement to OSS from LSE-369 scheduler requirements

Status
colourBlue
titleLCR Assigned

LSE-30Add OSS-REQ-0378 back to OSS so that DM tracing will work correctly.LCR-899
LCR-1375Update Base Data Center IT Installation and Configuration Activities

Status
colourBlue
titleLCR Assigned

NAAdd Base Data Center activities in PMCS

LCR-1364Updated LSE-131 (EPO/DM ICD)

Status
colourBlue
titleLCR Assigned

LSE-131Mainly reduction of scope.

LCR-1353Reorganization of Early Integration Activities

Status
colourBlue
titleLCR Assigned

PMCSClarification and augmentation of the list of planned cross-subsystem early integration activities.

LCR-1344Add Performance Metrics to
LSE-61

Status
colourBlue
titleLCR Assigned

LSE-61Add database and image access requirements and ability to calculate science KPMs.

LCR-1343Revisions to LSE-239 Base Data Center Requirements

Status
colourBlue
titleLCR Assigned

LSE-239


LCR-1332Update LSE-30 (OSS) to Better Define OSS-REQ-0164

Status
colourYellow
titleStudied

LSE-30Improves and modernizes the language concerning the definition of completeness and reliability tests for DM.

Jira
serverJIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId9da94fb6-5771-303d-a785-1b6c5ab0f2d2
keyLIT-388


LCR-1309Update DM Documentation Regarding Special Programs

Status
colourGreen
titleApproved

LSE-29, LSE-30, LSE-61


LCR-1302LSR-REQ-0034 Clarification

Status
colourGreen
titleApproved

LSE-29Clarify the requirement concerning the saving of Observatory engineering data and the like.

Jira
serverJIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId9da94fb6-5771-303d-a785-1b6c5ab0f2d2
keyLIT-100


LCR-1243Update LSE-239 Base Data Center Requirements

Status
colourGreen
titleApproved

LSE-239

LSE-239 was developed to provide the definition of the Base Data Center (BDC) requirements for the Base construction contracts and the BDC Information Technology and Communications (ITC) infrastructure design. Since that version, much has been learned and the requirements have been migrated into the project SySML requirements model. A new version of LSE-239 has been prepared as a document generated from Magic Draw, and has also been substantially re-organized, to more cleanly separate those sections directly applicable to the Base Facility construction contract (Sections 1 - 3), versus those more targeted at the ITC infrastructure design (Appendices I and II). Finally, as the formerly baseline Tape Library has been recommended to be replaced in the BDC ITC design baseline (LCR-781 and follow-on), requirements related to the Tape Library have been deprecated into Appendix III.



LCR-1238Implement DM and OSS part of LCR-786

Status
colourGreen
titleApproved

LSE-61, LSE-30


LCR-1230Update to LSE-75

Status
colourYellow
titleStudied

LSE-75Defining feedback for Active Optics and guider. KTL rewording with more specifics after discussion with Sandrine.

LCR-1214Clarify DM's Level 1, 2, and 3 Terminology for the Science Community

Status
colourGreen
titleapproved

LSE-163, LPM-231


LCR-1203Searchable - Interactive Nightly Reports

Status
colourYellow
titleStudied


Need to determine what DM will need to do to meet this requirement.

LCR-1154Stand Up Data Access Rights Working Group - Put LPM-221 under Change Control

Status
colourGreen
titleFULLY IMPLEMENTED

LPM-221


LCR-1070DM Milestones for Base LAN and Summit Network

Status
colourGreen
titleFULLY IMPLEMENTED





LCR-1068Revised Commissioning Plan LSE-79

Status
colourGreen
titleFULLY IMPLEMENTED

LSE-79


LCR-1065Date Update for the DM/EPO ICD Phase 3 Milestone

Status
colourGreen
titleFULLY IMPLEMENTED





LCR-1064Add Priorities to LSE-61

Status
colourGreen
titleFULLY IMPLEMENTED

LSE-61

Add priorities to the baselined version of the document that are already part of the MagicDraw model (added as part of

Jira
serverJIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId9da94fb6-5771-303d-a785-1b6c5ab0f2d2
keyDM-10647
)



LCR-1048Update Summit Network Installation Schedule

Status
colourGreen
titleFULLY IMPLEMENTED





LCR-1034Auxiliary Telescope Spectrograph Instrument and Detector Schedule and Cost Update

Status
colourGreen
titleFULLY IMPLEMENTED


Updates the schedule and cost of the procurement of the Auxiliary Telescope Spectrograph Instrument. Details of the change are not yet available ().



LCR-1024Tie LSE-163 into OSS

Status
colourGreen
titleapproved

LSE-30 (OSS); others indirectly, LSE-61Resolves a long-running formal gap in our requirements flowdown. Makes the contents of the DPDD (LSE-163) authoritative in deriving DM-level requirements (i.e., in the DMSR, LSE-61) by stating in the OSS that the data products generated by DM shall conform to the DPDD.

LCR-1021Adjust Dates for DWDM Equipment Installation

Status
colourGreen
titleFULLY IMPLEMENTED

PMCSNotes ~60 day delay in the installation of the Summit-Base and Base-Santiago DWDM equipment, triggered by late delivery from the equipment vendor. New schedule shows installations complete by roughly November 2017.

LCR-1018Follow up to New Camera Image Types (LCR-773) to flow down requirements to subsystem specs and ICDs

Status
colourGreen
titleAPPROVED

LSE-59, LSE-71; DM impact to be analyzed

Adds the new image types introduced by LCR-773 (New Camera Image Types) to the Camera requirements and OCS-Camera ICD. Superficially this doesn't require a response in DM-level documents; however, the exploitation of the new image types is driven by calibration requirements and so most likely they should eventually appear in DM documents.

Note that as of  LCR-773 itself is Approved but not Fully Implemented.



LCR-1013Place the LSST Science Platform Vision Document under Change Control

Status
colourGreen
titleFULLY IMPLEMENTED

LSE-319


LCR-1006Update DM-OCS ICD, LSE-72, to reflect DM design changes and to match recent LSE-70/LSE-209

Status
colourYellow
titleStudied

LSE-72, LDM-230Updates LSE-72 to match current design work. Incorporates changes from LCR-780 and LCR-888.


LCR-1005LSE-209 Software Component Document Reformat and Reqs Refresh 

Status
colourRed
titleREJECTED

LSE-209, likely LSE-72This is mostly a cleanup pass on a key OCS middleware definition document. The DM-to-OCS interface depends on its contents, so it's likely that some consequential changes to LSE-72 will be needed.

LCR-1004Withdraw LSE-77, "Infrastructure Interfaces Between Data Management and the Base Facility"

Status
colourGreen
titleFULLY IMPLEMENTED

LSE-77, possibly LSE-239In 2015, the project shifted from the then-existing DM-to-T&S ICD LSE-77 to a new "Base Data Center Requirements" document, LSE-239, to capture the needs of DM for data center space at the Base. LSE-77 became effectively a dead letter in the process. This change request is intended to just clean that up.
Final result: LSE-77 has been withdrawn.

Vote initiated

LCR-983Integrate DM and Camera Data Systems Early

Status
colourGreen
titleAPPROVED

PMCS, possibly ICDs, LSE-61Perform additional early integration activities, notably around the use of the CCOB camera test facility to generate data to be ingested into DM on a regular basis.

LCR-974Update Network Requirements in LSE-61

Status
colourGreen
titleFULLY IMPLEMENTED

LSE-61One new requirements, modifications to 3 others.

LCR-964Summit Computer Room Requirements Document

Status
colourGreen
titleFULLY IMPLEMENTED

LSE-299 (new)Consolidates all planned compute hardware needed on the Summit (except what is actually in the domes).

LCR-963Summit - Base ITC Design Document

Status
colourGreen
titleFULLY IMPLEMENTED

LSE-309 (new)

Product of Jeff Kantor's Summit-Base Tiger Team

Touches on almost all DM's interfaces with the other systems.



LCR-962Flowdown LSE-163 (DPDD) to LSE-61 (DMSR)

Status
colourGreen
titleFULLY IMPLEMENTED

LSE-163, LSE-61Includes a handful of unrelated requirements changes/additions. Some text updates to DPDD.

LCR-943

Minor updates to LSE-63

Status
colourGreen
titleFULLY IMPLEMENTED

LSE-63 (Data Quality Assurance Plan)LSE-63 has not been updated since 2011. This update includes some minor modernizations based on current best practice and removes mention that we are currently in R&D phase.

LCR-924Duplicate LSR Data
Performance Metrics in OSS for DM Flow Down

Status
colourGreen
titleAPPROVED

LSE-30 (OSS)

Flows LSR-REQ-0093, LSE-REQ-0094 and LSR-REQ-0097 to OSS so that DM can include them in DMSR for verification of the performance metrics (via

Jira
serverJIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId9da94fb6-5771-303d-a785-1b6c5ab0f2d2
keyLIT-276
).



LCR-921DM to Provide Service for Publishing Predicted Visit Sequence

Status
colourGreen
titleFULLY IMPLEMENTED

LSE-61 (DMSR)

Publish telescope position and predicted schedule to the community (via

Jira
serverJIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId9da94fb6-5771-303d-a785-1b6c5ab0f2d2
keyLIT-215
).



LCR-908Keep all Data Releases loaded in databases

Status
colourGreen
titleAPPROVED

LSE-30 (OSS) and many subordinate documentsAdopt the following requirement: "The LSST project shall maintain user access to the contents of all Data Releases. This facility may be provided with reduced performance and capacity for Data Releases older than the most recent one, but be qualitatively identical otherwise." in place of the current policy of maintaining access only to the two most recent data releases.
Jira
serverJIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId9da94fb6-5771-303d-a785-1b6c5ab0f2d2
keyRFC-325

LCR-900DM S17 Mid Cycle Replan

Status
colourGreen
titleFULLY IMPLEMENTED

(PMCS)Implement S17b plans for NCSA, SQuaRE, and AP with some small tweaks to other subsystems.

LCR-899Scheduler Requirements Control

Status
colourYellow
titleStudied

LTS-347, possibly LSE-62Promote the scheduler requirements in LTS-347 to project-level change control, moving them to an LSE-* document.

LCR-888Proposed Meta-data header client for LSST images

Status
colourGreen
titleAPPROVED

LSE-72, LDM-230, probably numerous othersProposes that a common Summit-Base service be created that extracts all observation metadata (from published telemetry or the EFD) intended to be packaged with the image files, storing an artifact containing all this metadata as "headers" for later retrieval.Q: Does this have anything to do with the reformatted EFD database? -XW
LCR-851Update to LSE-151

Status
colourGreen
titleFULLY IMPLEMENTED

LSE-151 "Interface Control & Compliance Management Process"Clarifies language surrounding ICDs and documents that describe or actually are the implementations of the interfaces controlled by ICD.

2017-02-22

LCR-849

Update LSE-78 LSST Observatory Network Design

Status
colourGreen
titleFULLY IMPLEMENTED

LSE-78LCR-849 is to make LSE-78 consistent with and refer to the Network Sizing document LDM-142.  Requested CCB if this can be voted on via the electronic voting process.  I think it is non-controversial and was discussed at some length in the DM TCT when we last updated LDM-142.It would be good to get this done, as there are a number of more significant changes to the same documents coming very soon as a consequence of Tiger Team activities.
2017-03-05 email vote
LCR-838Auxiliary Telescope Scheduler

Status
colourBlue
titleLCR Assigned

LTS-187 (draft: SPT-372)


LCR-836Typographic correction to LSE-69 to match LSE-130

Status
colourGreen
titleapproved

LSE-69

This is a trivial typographic correction that was requested a long time ago in

Jira
serverJIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId9da94fb6-5771-303d-a785-1b6c5ab0f2d2
keyLIT-183
.

Jira
serverJIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId9da94fb6-5771-303d-a785-1b6c5ab0f2d2
keyDM-9336

2017-02-22

LCR-835Camera Heterogeneous Sensor Focal Plane

Status
colourGreen
titleFULLY IMPLEMENTED


Implicitly sharpens requirements on ability to determine the correct pixel geometry upon data ingest from Camera to DM. May have an implication for the generation of difference imaging templates, at the (~annual) template-creation level and/or at the nightly template-warp-instantiation level.


2017-03-22 (status check only)

LCR-795

Updates to DM/EPO interface requirements (LSE-131)

Status
colourGreen
titleFULLY IMPLEMENTED

LSE-131

See substantive discussion in the DM Leadership Team Meeting 2017-03-20.

Jira
serverJIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId9da94fb6-5771-303d-a785-1b6c5ab0f2d2
keyLIT-97

2017-03-22 (vote deferred)

LCR-788Transfer Task Framework from 02C.07 to 02C.06
Status
colourGreen
titleFULLY IMPLEMENTED


(PMCS)Moves the Task class and a cluster of related classes and interfaces to be a responsibility of the SLAC group.

LCR-787Commissioning Re-Plan 2016

Status
colourGreen
titleFULLY IMPLEMENTED

LSE-79See also the February 2017 Commissioning Review.
Awaiting the report of the review committee. 


LCR-786Eliminate Base Network Outage Buffer; Expand Summit Camera Image Buffer

Status
colourGreen
titleFULLY IMPLEMENTED

Unclear

Kevin Long is awaiting guidance on what WBS element to use for the additional budget for the enlarged buffer.

The "documents affected" is "Unclear" because it has not been completely decided whether to implement this as a change to requirements or as a specification that exceed the requirement. This is a separate question both at system and at Camera level.



LCR-785Observatory Operations Server

Status
colourRed
titleREJECTED

Unclear; may require a new ICD. Would also affect DM design documents.


LCR-783Commissioning Cluster Services

Status
colourRed
titleREJECTED

Appears in DM design documents


LCR-782Additional OCS Driven Services for Archive Center Access

Status
colourGreen
titleApproved

LSE-72, possibly LSE-140Provide a means for the OCS to launch predefined batch processing actions at the Archive Center. Likely to be used for, e.g., producing synthetic calibration images following the collection of the input flats, bias frames, etc.

LCR-780Eliminate Engineering & Facilites Database Copies in Offline Archive Centers

Status
colourGreen
titleApproved

LSE-72, LDM-230

Requires changing EFD interface with OCS to be the ingest to the Reformatted EFD.

: discussed at an OCS-DM meeting. Further discussions planned for .



LCR-773New Camera Image Types

Status
colourGreen
titleFully Implemented

LSE-30 (OSS)Adds requirements for a pinhole filter and for the capability to take filterless images.

LCR-747Unified LSST Authentication and Authorization Services

Status
colourGreen
titleFully Implemented

LSE-279Provides unified authentication and authorization technical services to assure authorized individuals access LSST services and systems.

2017-10-19 minutes

LCR-733LSST CCD, CCS, and DAQ for the Auxiliary Telescope Spectrograph
Status
colourGreen
titleFully Implemented


LSE-140 and many othersRequires consequential changes to LSE-140 because of the change to direct spectrograph-to-DM image retrieval.

The details of the timeline of capabilities required of DM to support the spectrograph, starting 8/2018, remain under analysis. 


LCR-687Alternate Standard Visit with 30s single exposure

Status
colourGreen
titleFully Implemented

LSE-29 (LSR), LSE-30 (OSS)Requires that DM be able to handle two types of standard visits: two 15s exposures, or one 30s exposure. Somewhat vague on the question of how closely the two types of visits could be interleaved.

2016-11-16 minutes

LCR-586Update LSE-209 Software to OCS ICD

Status
colourGreen
titleAPPROVED

LSE-209A further round of technical updates to the OCS-to-subsystem device interface. The draft already serves as the basis for the prototype and early integration work that is ongoing.

2017-03-22

LCR-581Calibration Hardware Requirements Update

Status
colourGreen
titleFully Implemented

LSE-30 (OSS), LSE-60, LSE-140 (DM ICD)


LCR-458Support for "Deep Drilling" observing scenario

Status
colourYellow
titlePENDING


See

Jira
serverJIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
serverId9da94fb6-5771-303d-a785-1b6c5ab0f2d2
keyLIT-325
for a task relating to unblocking this change request.



...