There are longer term plans for cadence studies and parameter tuning studies (a feasibility study for using SLAC-HPC is underway), but the current emphasis is validation and debugging of existing features in OpSim v3.0, and preparation for the Community Workshop in August as described here.

  • Validation runs will build on Doc-15318 to finalize the validation of the v3.0 codebase
  • Tier 1 runs will be replaced by better M2M=30 runs soon (sstars are in progress)
  • Rolling cadence is being attempted without code changes (a bug prevents non-integer durations).
  • Epic = "Other Workshop Runs"

Community Cadence Workshop - Aug 11-15, 2014

...

  • No further development is planned; will be replaced by MAF. A description of this tool is Doc-15392 " Analysis Tools: SSTAR"
  • Replication in MAF should include improvements specified here.
  • Miscellaneous tasks are recorded in Epic = "Prep for MAF"

...