There are longer term plans for cadence studies and parameter tuning studies (a feasibility study for using SLAC-HPC is underway), but the current emphasis is validation and debugging of existing features in OpSim v3.0, and preparation for the Community Workshop in August as described here.
- Validation runs will build on Doc-15318 to finalize the validation of the v3.0 codebase
- Tier 1 runs will be replaced by better M2M=30 runs soon (sstars are in progress)
- Rolling cadence is being attempted without code changes (a bug prevents non-integer durations).
- Epic = "Other Workshop Runs"
Community Cadence Workshop - Aug 11-15, 2014
- Website: https://lsstcorp.org/meetings/ocw/
- Workshop Planning Document
- Testing MAF installation
- Testing OpSim installation
- Validation, Tier 1 and Tier 2 runs
- Documentation (Epic = "Workshop Documentation")
...
- No further development is planned; will be replaced by MAF. A description of this tool is Doc-15392 " Analysis Tools: SSTAR"
- Replication in MAF should include improvements specified here.
- Miscellaneous tasks are recorded in Epic = "Prep for MAF"
...