This page details the SOCS workplan with planned and actual storypoints.
Updated: 2017-08-31 15:19
SOCS Release v1.
...
1 (SIM-
...
1287)
Release Date: 20162017-1007-2731
Status = DoneIn Progress
Statement of Work
- Support for previous release
- Support Development for Area Distribution Look Ahead in Scheduler 1.1
- Implement non deterministic weather simulator
- Implement non deterministic downtime simulator
- Integrate and test
- Refactor and integrate Environment Model
- Simulate weather telemetry, clouds and seeing
- Incorporate filter swaps during new moon
- Incorporate downtime simulator
- Implement Scheduler configuration via commands
- Integrate with Scheduler
- Test with complete surveysurvey with Area Distribution proposals and Look Ahead
- Test repeatabilityspeed performance
- Test execution speed
...
- repeatability
Support for previous release v1.0 (SIM-
...
1945)
Planned Story Points = 10.0
Status = DoneIn Progress
Statement of Work
- Create module for downtime information
- Create classes for handling the downtime information
- Handle configuration overriding of the downtime information
- Make the simulator handle downtime
- Handle issues arising from testing the v1.0 release
Number of Issues (Stories) =
...
10
Key | Description | Status | Story Points | |||
---|---|---|---|---|---|---|
SIM-2106 | Use downtime in simulator | Done | 2420 | Support work for August | In Progress | 15.0 |
SIM-20172409 | Initial downtime Support work for July | Done | 51.0 |
Integrate and test with Scheduler v1.0 (SIM-1344)
Planned Story Points = 25.0
Status = Done
Statement of Work
- Perform "continous" integration testing between SOCS and Scheduler
- Update ICD to reflect any changes in topic information
Number of Issues (Stories) = 5
Key | Description | Status | Story Points |
---|---|---|---|
SIM-2130 | SOCS/Scheduler testing | Done | 5.0 |
SIM-2105 | SOCS/Scheduler testing | Done | 5.0 |
SIM-2074 | SOCS/Scheduler testing | Done | 5.0 |
SIM-2065 | SOCS/Scheduler testing | Done | 5.0 |
SIM-2016 | SOCS/Scheduler testing | Done | 5.0 |
Cadence studies in cycle v1.0 (SIM-1389)
SIM-2374 | Support work for June 2017 | Done | 2.0 |
SIM-2343 | Support work for May | Done | 2.0 |
SIM-2316 | Add parameters for restarting sequences | Done | 0.5 |
SIM-2311 | Ensure cloud and seeing models have concept of time of year | Done | 0.2 |
SIM-2310 | Support work for March | Done | 3.0 |
SIM-2308 | Fix session tracking | Done | 0.1 |
SIM-2299 | Change sim start date to 10/01/2022 | Done | 0.1 |
SIM-2298 | Correct time window configuration for DeepDrillingCosmology1 | Done | 0.1 |
Support Development for Area Distribution Look Ahead in Scheduler 1.1 (SIM-1345)
Planned Story Points = 15.0
Status = Done
Statement of Work
- Provide support to Scheduler developer
- Provide configuration for Area Distribution Look Ahead
Number of Issues (Stories) = 0
Implement non-deterministic weather simulator (SIM-1346)
Planned Story Points = 10Planned Story Points = 42.0
Status = Done
Statement of Work No description provided.
- Implement system to use generated weather distributions
- Implement configuration for using non-deterministic system
Number of Issues (Stories) =
...
0
Integrate and test with Scheduler v1.1 (SIM-1347)
Planned Story Points = 25.0
Status = Done
Statement of Work
- Perform routine integration work with the Scheduler
- Update ICD as necessary
Number of Issues (Stories) = 2
Key | Description | Status | Story Points |
---|---|---|---|
SIM-2372 | SOCS/Scheduler testing for June 2017 | Done | 5.0 |
SIM-2371 | SOCS/Scheduler testing March-May 2017 | Done | 15.0 |
Implement non-deterministic downtime simulator (SIM-1348)
Planned Story Points = 15.0
Status = Done
Statement of Work
- Create distribution for unscheduled downtime
- Implement system to use non-deterministic unscheduled downtime
- Implement configuration for system
Number of Issues (Stories) = 0
Cadence studies in cycle v1.1 (SIM-1392)
Planned Story Points = 95.0
Status = Done
Statement of Work
No description provided.
Number of Issues (Stories) = 33
Key | Description | Status | Story Points |
---|---|---|---|
SIM-2413 | Attend Scheduler Development Coordination Meeting in Seattle July 11-13 | Done | 3.0 |
SIM-2412 | Attend SOCS Workshop in Tucson July 5-7 | Done | 2.0 |
SIM-2411 | Attend SOCS Workshop in Tucson July 5-7 | Done | 2.0 |
SIM-2410 | Strategic planning meetings (weekly and as needed) July | Done | 2.0 |
SIM-2406 | V&V production - investigate variety of parameter settings for v4 and debug | Done | 3.0 |
SIM-2405 | Development and setup of processes and tools to create V&V runs | Done | 4.0 |
SIM-2402 | V&V - investigate variety of characteristics of v4 and debug | Done | 4.0 |
SIM-2401 | V&V - investigate variety of characteristics of v4 and debug | Done | 3.0 |
SIM-2373 | Support for V&V work with version 4 code | Done | 5.0 |
SIM-2370 | Strategic planning meetings (weekly and as needed) June | Done | 2.0 |
SIM-2351 | Rerun MAF on V&V runs and and analyze parameter impacts | Done | 3.0 |
SIM-2350 | Rerun MAF on V&V runs and and analyze parameter impacts | Done | 3.0 |
SIM-2349 | Review and update all default parameters for v4 | Done | 1.0 |
SIM-2348 | Review and update all default parameters for v4 | Done | 1.0 |
SIM-2347 | Strategic planning meetings (weekly and as needed) May | Done | 1.0 |
SIM-2345 | Support setup and running V&V runs, MAF and compiling results. | Done | 3.0 |
SIM-2340 | Support for V&V work with version 4 code |
...
Key
...
Description
...
Status
...
Story Points
...
SIM-2132
...
Support cadence studies for oct (rolling, dd, tier 1, etc)
...
Done
...
3.0
...
SIM-2131
...
Evaluate impact of new filter change time and closed loop optics correction
...
Done
...
2.0
...
SIM-2115
...
advertise old rolling cadence and DD tests
...
Done
...
1.0
...
SIM-2101
...
Support cadence study effort (including new lsst.org pages)
...
Done
...
3.0
...
SIM-2100
...
Design v1.0 verification & validation planned simulations
...
Done
...
2.0
...
SIM-2099
...
Review lsst.org webpages for Simulations (update esp. "LSST Science Pipelines"
...
Done
...
1.5
...
SIM-2098
...
New Reference Run - create new webpage on lsst.org, write and release announcements to public
...
Done
...
1.5
...
SIM-2083
...
Attend LSST2016
...
Done
...
2.5
...
SIM-2082
...
Attend LSST2016
...
Done
...
5.0
...
SIM-2081
...
Execute variation on minion_1016 with new closed loop values & filter change time
...
Won't Fix
...
2.0
...
SIM-2072
...
Generate & display MAF analysis of weather runs with correct cloud table
...
Done
...
1.0
...
SIM-2071
...
Support creation of LCR, materials and collections for new Reference Run
...
Done
...
3.0
...
SIM-2063
...
Identify strategy for validation and verification of v1.0
...
Done
...
1.0
...
SIM-2062
...
Identify strategy for validation and verification of v1.0
...
Done
...
1.0
...
SIM-2028
...
Support preparation of CCB documents for new Reference Run
...
Done
...
4.5
...
SIM-2018
...
Resurrect and redesign isolated rolling cadence regions for config files
...
Done
...
3.0
Production tools in cycle v1.0 (SIM-1390)
Planned Story Points = 42.0
Status = Done
Statement of Work
No description provided.
Number of Issues (Stories) = 10
Key | Description | Status | Story Points | |||
---|---|---|---|---|---|---|
SIM-2119 | Attend Software Carpentry workshop | Done | 2.0 | |||
SIM-2103 | August monthly reporting | Done | 0.5 | |||
SIM-2102 | July monthly reporting | Done | 0.5 | |||
SIM-2073 | Upgrades for ops2 - verify current data, archived data, install stack | Done | 2.0 | |||
SIM-2035 | Upgrades to ops2 - OS, disk space, sims_operations, sims_maf | Done | 2.0 | |||
SIM-2034 | Monthly Reporting for May | Done | 1.0 | |||
SIM-2027 | Recreate cloud tables and re-run simulations and modifySchema.sh | Done | 5.0 | |||
SIM-2021 | prepare talk from SPIE paper for SPIE meeting | Won't Fix | 2328 | Create github repository for trackingDbs, document all ports | Done | 13.0 |
SIM-20192322 | Strategic planning meetings (weekly and as needed)Tutorial for setting up and using configuration files in opsim3_config | Done | 21.0 | |||
SIM-1973 | Run Log - upgrade ops2 disks and software to enable running latest MAF (include EUPS) and simulator; php v. visual basic investigation for webserver. | Done | 3.0 |
Implement Environmental Model (SIM-1941)
Planned Story Points = 15.0
Status = Done
Statement of Work
- Convert old cloud table into SQLite DB file
- Convert old seeing table into SQLite DB file
- Create module for environmental information generation
- Create classes for reading environmental databases
- Create topics for passing environmental information
- Add configuration and documentation for overriding the environmental information
Number of Issues (Stories) = 2
Key | Description | Status | Story Points |
---|---|---|---|
SIM-2133 | Integrate weather information into system | Done | 10.0 |
SIM-2080 | Initial work on weather information | Done | 5.0 |
More Observatory Model Enhancements (SIM-1942)
Planned Story Points = 15.0
Status = Done
Statement of Work
- Implement filter swapping at new/full moon
- Implement filter changes constraints
- Implement initial variational model
Number of Issues (Stories) = 1
Key | Description | Status | Story Points |
---|---|---|---|
SIM-2107 | Handle filter swaps in SOCS | Done | 10.0 |
Infrastructure Enhancements (SIM-1944)
Planned Story Points = 20.0
Status = Done
Statement of Work
- See if EUPS can be a viable deployment
- Handle Conda installation if EUPS works
- Create a Docker image
- Ensure current configurations received by Scheduler
- Implement any necessary Scheduler specific configuration
Number of Issues (Stories) = 4
Key | Description | Status | Story Points |
---|---|---|---|
SIM-2129 | Infrastructure work for October | Done | 5.0 |
SIM-2104 | Infrastructure work for September | Done | 5.0 |
SIM-2075 | Infrastructure work for August | Done | 5.0 |
SIM-2066 | Infrastructure work for July | Done | 5.0 |
SOCS Extended v1.0 Development (SIM-2167)
Planned Story Points = 64.0
Status = Done
Statement of Work
No description provided.
Number of Issues (Stories) = 16
Key | Description | Status | Story Points |
---|---|---|---|
SIM-2256 | User interface work for February | Done | 3.0 |
SIM-2255 | Scheduler optimization work for February | Done | 5.0 |
SIM-2254 | SOCS/Scheduler testing for February | Done | 4.0 |
SIM-2253 | Infrastructure work for February | Done | 4.0 |
SIM-2243 | SOCS/Scheduler testing for January | Done | 4.0 |
SIM-2242 | User interface work for January | Done | 3.0 |
SIM-2241 | Scheduler optimization work for January | Done | 5.0 |
SIM-2240 | Infrastructure work for January | Done | 4.0 |
SIM-2228 | User interface work for December | Done | 3.0 |
SIM-2227 | SOCS/Scheduler testing for December | Done | 4.0 |
SIM-2226 | Scheduler optimization work for December | Done | 5.0 |
SIM-2225 | Infrastructure work for December | Done | 4.0 |
SIM-2203 | User interface work for November | Done | 3.0 |
SIM-2202 | Scheduler optimization work for November | Done | 5.0 |
SIM-2201 | SOCS/Scheduler testing for November | Done | 4.0 |
SIM-2200 | Infrastructure work for November | Done | 4.0 |
Cadence studies and validation - verification in v1.0.ext (SIM-2168)
Planned Story Points = 64.0
Status = Done
Statement of Work
No description provided.
Number of Issues (Stories) = 0
SOCS Release v1.1 (SIM-1287)
Release Date: 2017-07-31
Status = In Progress
Statement of Work
- Support for previous release
- Support Development for Area Distribution Look Ahead in Scheduler 1.1
- Implement non deterministic weather simulator
- Implement non deterministic downtime simulator
- Integrate and test with Scheduler
- Test survey with Area Distribution proposals and Look Ahead
- Test speed performance
- Test repeatability
Cadence studies in cycle v1.1 (SIM-1392)
Planned Story Points = 95.0
Status = In Progress
Statement of Work
No description provided.
Number of Issues (Stories) = 32
...
Key
...
Description
...
Status
...
Story Points
...
SIM-2351
...
Rerun MAF on V&V runs and and analyze parameter impacts
...
To Do
...
3.0
...
SIM-2350
...
Rerun MAF on V&V runs and and analyze parameter impacts
...
To Do
...
3.0
...
SIM-2349
...
Review and update all default parameters for v4
...
To Do
...
1.0
...
SIM-2348
...
Review and update all default parameters for v4
...
To Do
...
1.0
...
SIM-2347
...
Strategic planning meetings (weekly and as needed) May
...
To Do
...
1.0
...
SIM-2345
...
Support setup and running V&V runs, MAF and compiling results.
...
Done
...
3.0
...
SIM-2340
...
Support for V&V work with version 4 code
...
In Progress
...
5.0
...
SIM-2328
...
Create github repository for trackingDbs, document all ports
...
Done
...
1.0
...
SIM-2323
...
opsim4: Establish sky brightness limits for all filters in all baseline proposals
...
In Progress
...
2.0
...
SIM-2322
...
Strategic planning meetings (weekly and as needed)
...
Done
...
1.0
...
SIM-2321
...
Support V&V work with version 4 code
...
Done
...
5.0
...
SIM-2320
...
Add edit capability to new run log
...
Duplicate
...
3.0
...
SIM-2319
...
Publish opsim3 Tier 1 runs with newer MAFs on 8686
...
Done
...
0.5
...
SIM-2318
...
Add edit capability to alhena run log
...
In Progress
...
3.0
...
SIM-2309
...
Setup replacement db and interface for run log on alhena
...
Done
...
3.0
...
SIM-2294
...
V & V - define strategy for parameter optimization
...
Done
...
1.0
...
SIM-2293
...
V & V - itemize runs and priorities
...
Done
...
2.0
...
SIM-2289
...
Strategic planning meetings (weekly and as needed)
...
Done
...
1.0
...
SIM-2288
...
Attend JTM
...
Done
...
3.0
...
SIM-2287
...
Attend JTM
...
Done
...
3.0
...
SIM-2263
...
opsim4: Test limit on tuples requested per night (2, 3, 4) - field v. field/filter
...
In Progress
...
3.0
...
SIM-2215
...
Run the latest MAF (with filter stat corrections) on Tier 1 runs
...
Done
...
2.0
...
SIM-2213
...
Opsim3: Generate reuse parameter runs - run at 1, 5, 10 to see impact on filter change stats.
...
To Do
...
3.0
...
SIM-2114
...
Outline Francisco's visualization, real time analysis tool definition; include maf standard metrics list.
...
In Progress
...
2.0
...
SIM-2085
...
opsim4: Generate simulations with 3-4 minute return time for NEOs
...
To Do
...
3.0
...
SIM-2084
...
opsim4: Generate simulations with added Euclid area
...
In Progress
...
3.0
...
SIM-1975
...
Analyze and summarize results of weather study
...
To Do
...
2.0
...
SIM-1879
...
Write outline for opsim paper for publication
...
In Progress
...
1.0
...
SIM-1832
...
Develop method to cross compare or view results from weather runs
...
To Do
...
2.0
...
SIM-1624
...
Write document on deep drilling and filter change requirements
...
In Progress
...
1.0
...
SIM-1621
...
opsim3: Test rolling cadence with isolated userRegions and no overlap, and start/stop times
...
In Progress
...
5.0
...
SIM-1081
...
opsim3: Generate permutations of reference runs with various auxiliary proposals
...
In Progress
...
3.0
2321 | Support V&V work with version 4 code | Done | 5.0 |
SIM-2320 | Add edit capability to new run log | Duplicate | 3.0 |
SIM-2319 | Publish opsim3 Tier 1 runs with newer MAFs on 8686 | Done | 0.5 |
SIM-2318 | Add edit capability to alhena run log | Done | 3.0 |
SIM-2309 | Setup replacement db and interface for run log on alhena | Done | 3.0 |
SIM-2294 | V & V - define strategy for parameter optimization | Done | 1.0 |
SIM-2293 | V & V - itemize runs and priorities | Done | 2.0 |
SIM-2289 | Strategic planning meetings (weekly and as needed) | Done | 1.0 |
SIM-2288 | Attend JTM | Done | 3.0 |
SIM-2287 | Attend JTM | Done | 3.0 |
SIM-2215 | Run the latest MAF (with filter stat corrections) on Tier 1 runs | Done | 2.0 |
SIM-2213 | Opsim3: Generate reuse parameter runs - run at 1, 5, 10 to see impact on filter change stats. | Done | 3.0 |
SIM-1975 | Analyze and summarize results of weather study | Done | 2.0 |
SIM-1832 | Develop method to cross compare or view results from weather runs | Done | 2. |
Support for previous release v1.0 (SIM-1945)
Planned Story Points = 10.0
Status = In Progress
Statement of Work
- Handle issues arising from testing the v1.0 release
Number of Issues (Stories) = 7
...
Key
...
Description
...
Status
...
Story Points
...
SIM-2343
...
Support work for May
...
In Progress
...
2.0
...
SIM-2316
...
Add parameters for restarting sequences
...
Done
...
0.5
...
SIM-2311
...
Ensure cloud and seeing models have concept of time of year
...
Done
...
0.2
...
SIM-2310
...
Support work for March
...
Done
...
3.0
...
SIM-2308
...
Fix session tracking
...
Done
...
0.1
...
SIM-2299
...
Change sim start date to 10/01/2022
...
Done
...
0.1
...
SIM-2298
...
Correct time window configuration for DeepDrillingCosmology1
...
Done
...
0.1
Support Development for Area Distribution Look Ahead in Scheduler 1.1 (SIM-1345)
Planned Story Points = 15.0
Status = To Do
Statement of Work
- Provide support to Scheduler developer
- Provide configuration for Area Distribution Look Ahead
Number of Issues (Stories) = 0
Implement non-deterministic weather simulator (SIM-1346)
Planned Story Points = 10.0
Status = To Do
Statement of Work
- Implement system to use generated weather distributions
- Implement configuration for using non-deterministic system
Number of Issues (Stories) = 0
Integrate and test with Scheduler v1.1 (SIM-1347)
Planned Story Points = 25.0
Status = To Do
Statement of Work
- Perform routine integration work with the Scheduler
- Update ICD as necessary
Number of Issues (Stories) = 0
Implement non-deterministic downtime simulator (SIM-1348)
Planned Story Points = 15.0
Status = To Do
Statement of Work
- Create distribution for unscheduled downtime
- Implement system to use non-deterministic unscheduled downtime
- Implement configuration for system
...
0 |
Create Weather Distributions (SIM-1946)
Planned Story Points = 20.0
Status = To DoDone
Statement of Work
- Create distributions for clouds and/or transparency
- Create distributions for seeing
Number of Issues (Stories) = 0
SOCS Release v1.2 (SIM-1288)
Release Date: 2017-08-24
Status = To DoDone
Statement of Work
- Support for previous release
- Support Development for Time Distribution Look Ahead in Scheduler 1.2
- Integration and test with Scheduler
...
Planned Story Points = 59.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
Support for previous release v1.1 (SIM-1414)
Planned Story Points = 12.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
Integrate and test with Scheduler v1.2 (SIM-1415)
Planned Story Points = 12.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
Cadence Studies v1.2 (SIM-1416)
Planned Story Points = 83.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
SOCS Release v1.3 (SIM-1289)
Release Date: None
Status = To DoDone
Statement of Work
- Support for previous release
- Evaluate and implement performance enhancements
...
Planned Story Points = 76.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
Support for previous release v1.2 (SIM-1418)
Planned Story Points = 12.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
Cadence Studies v1.3 (SIM-1419)
Planned Story Points = 88.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
SOCS Release v1.4 (SIM-1290)
Release Date: None
Status = To DoDone
Statement of Work
- Support for previous release
- Implement warm start DB interface for Scheduler
- Implement image quality feedback simulator
- Implement degraded operational modes simulator
- Constrained limits and/or speeds for mount, rotator, dome, optics.
- Constrained availability of filters
- Integrate and test with Scheduler
- Test resuming partial surveys
- Test variable image quality feedback
- Test degraded modes
...
Planned Story Points = 23.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
Implement image quality feedback simulator (SIM-1354)
Planned Story Points = 23.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
Implement degraded operational modes simulator (SIM-1355)
Planned Story Points = 23.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
Integrate and test with Scheduler v1.4 (SIM-1356)
Planned Story Points = 26.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
Support for previous release v1.3 (SIM-1421)
Planned Story Points = 12.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
Cadence Studies v1.4 (SIM-1422)
Planned Story Points = 107.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
SOCS Release v1.5 (SIM-1291)
Release Date: None
Status = To DoDone
Statement of Work
- Support for previous release
- Implement spatial distribution for weather simulator
- Integrate and test with Scheduler
- Test dithering in Scheduler
- Test spatial distribution for weather in a survey
...
Planned Story Points = 53.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
Integrate and test with Scheduler v1.5 (SIM-1358)
Planned Story Points = 29.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
Support for previous release v1.4 (SIM-1424)
Planned Story Points = 12.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
Cadence Studies v1.5 (SIM-1425)
Planned Story Points = 94.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
SOCS Release v2.0 (SIM-1292)
Release Date: None
Status = To DoDone
Statement of Work
- Support for previous release
- Support Scheduler Implementation for publication of future targets schedule
- Integrate and test with Scheduler
...
Planned Story Points = 70.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
Integrate and test with Scheduler v2.0 (SIM-1360)
Planned Story Points = 12.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
Support for previous release v1.5 (SIM-1427)
Planned Story Points = 12.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
Cadence Studies v2.0 (SIM-1428)
Planned Story Points = 94.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
SOCS Release v2.1 (SIM-1293)
Release Date: None
Status = To DoDone
Statement of Work
- Support for previous release
- Implement weather forecast
- Integrate and test with Scheduler
...
Planned Story Points = 47.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
Integrate and test with Scheduler v2.1 (SIM-1362)
Planned Story Points = 24.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
Support for previous release v2.0 (SIM-1430)
Planned Story Points = 12.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
Cadence Studies v2.1 (SIM-1431)
Planned Story Points = 83.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
SOCS Release v2.2 (SIM-1294)
Release Date: None
Status = To DoDone
Statement of Work
- Support for previous release
- Support Scheduler implementation of generic interface for optimization algorithms
- Support Schedule Incorporation community provided optimizations
...
Planned Story Points = 35.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
Support Scheduler incorporation of community provided optimizations (SIM-1364)
Planned Story Points = 47.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
Support for previous release v2.1 (SIM-1433)
Planned Story Points = 12.0
Status = To DoDone
Statement of Work
No description provided.
Number of Issues (Stories) = 0
Cadence Studies v2.2 (SIM-1434)
Planned Story Points = 94.0
Status = To DoDone
Statement of Work
No description provided.