Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Comment: Move a block to where I think they are meant for. Correct me if I am wrong.

...

Ops Rehearsal 4Ops Rehearsal 4: Daily validation pipeline
Pilot/Co-Pilot
channel/contact

#ops-rehearsals

Reps:

(Middleware)  James Chiang  (USDF infrastructure and Raws)  Yusra AlSayyad (Pipeline) Colin Slater  (V&V) 

Schedule:June 25, 26, 27
Data:Simulated ComCam, replayed from the summit
Pipeline:?
Collection Names:
Notes
Ops Rehearsal 4Ops Rehearsal 4: Prompt Processing of ComCamSim data
Pilot/Co-Pilot?

parameters of OR4 see: https://lsstc.slack.com/archives/C064M4D6RC4/p1715274916681629

  • What is the expected processing time?:
    • Avoiding overlap with observation time
  • How to avoid visit summary issues?

  • Will rapid analysis be used and if so if an issue is seen with an input file should reverting to starting from step1 be done?


Ops Rehearsal 4Ops Rehearsal 4: Prompt Processing of ComCamSim data
Pilot/Co-Pilot?
channel/contact

#comcam-prompt-processing

Reps:
channel/contact

#comcam-prompt-processing

Reps:

Kian-Tat Lim (Middleware)  Dan Speck  (Infrastructure) Ian Sullivan / Krzysztof Findeisen  (Pipeline) Meredith Rawls  (V&V)

Schedule:During each night of ops rehearsal playback June 25, 26, 27, 2024
Data:Simulated ComCam, replayed from the summit
Pipeline:

? (version and the actual pipeline yaml that is run)

the summit
Pipeline:

? (version and the actual pipeline yaml that is run)

Collection Names:


NotesCollection Names:Notes

parameters of OR4 see: https://lsstc.slack.com/archives/C064M4D6RC4/p1715274916681629

  • What is the expected processing time?:
    • Avoiding overlap with observation time
  • How to avoid visit summary issues?
    Will rapid analysis be used and if so if an issue is seen with an input file should reverting to starting from step1 be done?


    Ops Rehearsal 4DRP for Template Generation for Ops Rehearsal 4
    Pilot/Co-Pilot


    channel/contact

    #ops-rehearsals

    Reps:

    (Middleware)  James Chiang  (USDF infrastructure and Raws)  Yusra AlSayyad (Pipeline) Colin Slater  (V&V) 

    Schedule:
    Data:Simulated ComCam (to be freshly simulated and ready later in May)
    Pipeline:
    Collection Names:


    Notes

    ...