Project updates
  • OIR lab council this week in Tucson - Ed Ajhar in town. 
  • Status slides for AMCL .. 
  • Naming  - email exchanges continue on terminology  
    • 20 minute naming discussion (all hands) next week Tuesday -  followed by lunch (Tucson)
    • message will be sent today
    • slides from AAS in docushare link will be sent. Templates to come in two days. (perhaps bundled)
  • ComCam quad box arrived with 3 SLAC people who were not registered - we need to register visits in Jira.
    • Making a TR does this for us automatically - so mainly for others not in our TR system
  • TMA test plan review in Spain next week (Chuck/Sandrine)
  • talk about safety procedures and hazard analysis and mitigation
  • LCR-2045 (commissioning de scope) and DM hardware (LCR-2148) need to go the NSF board this week.
  • Lots of people in Chile for dome, VA coating chamber  (9) and TMA (13)
    • could be last VA trip (final interface testing), though may support M1M3 coating later.
  • Camera back flange flatness non conformance - requirement was arbitrary but needs some analysis from Doug.
  • EPO have new tram member in Chile - moving to Tucson (web designer)
  • Bulk head plate connector also problematic.
DMLT vF2F
  • The next DMLT face-to-face meeting will be virtual (ie, on BlueJeans), and will take place from 24 to 27 February (ie in six weeks).
  • Details are on this Confluence page.
  • Please add your suggested agenda items to that page by 10 February.
Crosstalk

LCR 1923 is approved. So we need to look at the image extraction and transfer.Mentioned to Kian-Tat Lim before the break.

  • Should we consider only one read out shared with camera ?
  • The image transferred for Alerts as the only transfer?
    • what about copy at La Serena
  •  Kian-Tat Lim to report on the impact of LCR-1923 (De-Scope Camera DAQ Crosstalk Correction) on DM at the February DMLT vF2F.  
CCBOld tickets  - as sent in email this AM - John and Frossie.
Level 2 Milestones

Test Plans due in the next 45 days

Jira
serverJIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQuerylabels = TESTPLAN and resolution = Unresolved and due <= 45d order by id asc
serverId9da94fb6-5771-303d-a785-1b6c5ab0f2d2

Milestones due in the next 45 days

Jira
serverJIRA
columnskey,summary,type,created,updated,due,assignee,reporter,priority,status,resolution
maximumIssues20
jqlQueryproject = DM and labels = L2Milestone and team not in ("Telescope and Site") and resolution = Unresolved and due <= 45d order by id asc
serverId9da94fb6-5771-303d-a785-1b6c5ab0f2d2

There was a bunch of discussion about whether the reviewer of the test report has to be able to replicate the test results, or if they can simply accept the documentation of a single test execution.

  • We agreed that a single successful execution is adequate to capture a milestone.
  • There was some discussion about putting tests in CI, but this seems inconclusive from a policy standpoint.
Any other business
DMLT travel & availability this week
No meeting next week due to Marin Luther King Jr Day

...