Attending: ajc, john, lynne, kem, peter, abi, debbie, bo, kirk, george, sco=
tt, cathy, scott
Action for this week:
- Move catsim to stash
- John will provide phosim developer names and we will provide stash user=
accounts
Last weeks action items:
- stash for maf and opsim - DONE
- resolve camera geometry difference - DONE
Plans for the development:
- DM summer 2014
- Development plan has no real im=
pact on development of simulations (image subtraction and multi=
-fit using simplified images). =
;
- Andy Becker finds DCR differenc=
es at the 10% level (wavelength dependent).
- En-Hsin will work with AndyB to resolve these differences
- George - M1M3 acceptance and el=
lipticity are the primary drivers for systems engineering
- SE will track compliance of the=
whole LSST system.
- Plan for the next few months is=
to validate the data for these metrics (system parameters and perturbation=
s).
- Will update and make these data=
available (on the confluence page)
- Work is legitimizing the pertur=
bation data through validation and the validation of the phosim parameteriz=
atio
- Understand the acceptance testi=
ng pipeline
- Bo will lead these efforts
- Phosim
- Should have the hooks in place =
to do the engineering tests
- Question will be to validate da=
ta and code as being correct
- EnHsin is leading the effort - =
will use JIRA to track the bugs
- Sensor development - see presen=
tation sent to email list
- Will release a new version - af=
ter calibration files are generated (end of April)
- George - Can EnHsin run phosim&=
nbsp;
- OpSIm
- Inputs document for the schedul=
er (Steve)
- Inputs to OCS and ICD between s=
cheduler and simulator
- Objectives for the scheduler an=
d the metrics meeting the scheduler objectives (Abi)
- Francisco transitions off opsim=
in July?
- Workshop development (Kem).&nbs=
p;
- Francisco is working on look ah=
ead and rolling cadence
- Zeljko's runs (12 of 13) Tier 1=
runs complete
- Srini installing on HPC environ=
ment
- work on replacing slalib with p=
alpy
- MAF work
- arc - down prioritize HPC =
till others are in place
- Srini - time on MAF (100% till =
September)
- MAF
- End of this month f=
or SSTAR outputs for multiple =
opsim runs
- Following month
- Documentation for MAF and SSTAR=
functionality
- Presentation layer version one<=
/span>
- Web reports for individual opsi=
m runs
- High priority metrics (Steve's =
metrics) - would like to use Srini time
- Third month
- Tutorials on MAF =
li>
- Presentation layer version 2
Call in number: 866 330 1200
code: 518 2287#