20th December Simulations Meeting
Attending: ajc, jim, john, peter, steve r, kem, simon, chris,=
bo, george, cathy
Actions from last week
- ajc: to put image renaming code into simulation stack (TBD)
- ajc: to invite Alex Abate to present at a sims phonecon on her work (DO=
NE we will schedule a week in January)
- everyone: read Lynne's design review pages (see below)
- ajc: will send requests for people to read opsim review documents (feed=
back due 1st week of January) (DONE, ajc, Zeljko, Michael Woods-Vasey are t=
he reading group)
Introduction to Bo a new systems analysis working in Tucson
Comments on the design review
page for MAF (ability to compare opsim runs=
and to validate the simulations)
- more text than other design reviews (doesnt need to be as verbose, code=
should speak for itself, we dont need to call out private methods)
- Needs the api to be laid out in full including base classes
- Code needs to be runnable for the review
- Discussion about the goal of MAF in terms of the a technical metrics an=
d a science metrics framework (needs to serve both)
- We will add Kem and Cathy to the design review to ensure the technical =
use cases are supported.
ajc will send out development process to the sim leads (outlining how=
the agile approach for the development of the simulation work)  =
;(DONE)
Status of opsim documents for the review
- Documents: mostly finished (see list sent by Steve R on ops=
im mailer)
- Currently documents are in docushare collection-3288.=
Cathy will mail out lsst short urls for the reviewers
Status of catsim (Simon)
- Need to complete the final bits of the validation (in particular =
the measurement of the sizes)
- This will be coordinated with DESC (David Kirkby) as goal is for =
all to use the same validation framework
- Next work will be improving the bright star model
- Update the catalogs in the simulation based on latest Besacon tests
- add real stars
- Based on review comments future work will be
- zodiacal light
- variability
- morphology
Status of phosim
- Perturbation model is primary work
- increased flexibility with the new definition of the perturbation input=
s (one month from demoing interface)
- George - use systems engineering to get sign off on interfaces (e.g. sy=
seng phonecon)
- ajc - need to have the telescope subsystem sign off on the interfaces=
li>
- Sensor work on going
Next phonecon Jan 3 (a short one)
AOB