Date: Fri, 29 Mar 2024 07:47:08 +0000 (UTC) Message-ID: <11699080.21813.1711698433762@confluence> Subject: Exported From Confluence MIME-Version: 1.0 Content-Type: multipart/related; boundary="----=_Part_21812_1272852630.1711698428752" ------=_Part_21812_1272852630.1711698428752 Content-Type: text/html; charset=UTF-8 Content-Transfer-Encoding: quoted-printable Content-Location: file:///C:/exported.html
Goal: walkthrough of presentations for FDR SysEng breakout to make sure = we cover the right material and that there is a consistency between the pre= sentations.
FDR slides:
Overall comments:
FDR Presentations:
Needs a title
Start with what are we using simulations = for in the project
Overview of the tools available
Describe the deliverables and when they w= ill be delivered
Note when each system was reviewed
Motivate the usage at the beginning with =
project needs
Include a description of dust model and tie to LSST
Plots of distributions
Emphasis is risk reduction so this is abo= ut validation of algorithms
Drop affiliation from intro slide
Dont separate out student contributors&nb= sp;
Slides 5-7 are busy
Increase the number of slides if the slid= e gets busy and hard to follow (eg slide 5)
Try to convey flow of information through= the system in the slide
Put validation after slide with all of th= e psfs
Have atmosphere validation as a backup
Use the official template and make it sho= rter (20mins with questions)
Describe the goals of opsim (maximize sci= ence programs simultaneously, develop a validated scheduler)
Start with a lay-man's description of how= opsim works (e.g. telescope parameters, weather, science cadences) and its= output
Less of the software objects and details = and more use cases and how it ties to project needs
Describe universal cadence and deep field= s to show you can to cadence trade studies
Simplify SSTAR to just include figures an= d results
Describe number of runs done with opsim a= nd its successes
Describe missing functionality in terms o= f a roadmap for development and delivery