Wednesday 9:30 PST / 10:30 MST

T&S Code was usurped so we used Science Code

Attendees

Cathy, Kem, Steve, Abi, Srini, Peter, Simon, Andy, Bill, George

Agenda

see last week's Action Items

Notes & Updated Action Items

Review Planning

  • George/Andy -  fill out and submit Review Plan
  • Cathy - update OpSim DataAccess Page for reviewer use to include v3.0 validation runs (defer until after Dec)
  • Cathy - verify that Review page is set up properly after Plan submission 

Rolling Cadence (next step on developing the v3.x OpSim codebase)

  • Francisco's first priority is documentation/presentations for the review, then transition to this at end of Feb.
  • Steve has drafted a description of the desired functionality and boundaries and has distributed to lsst-opsim for comments

Verification of v3.0

  • Cathy will take a more detailed look at how the weather implementation has been changed since v2.3.2
  • Validation of SSTAR 4.0 (and release) is needed to generate analysis on the Released version of OpSim v3.0 for the final validation package 

OpSim v3.0 - Release by Mon, Dec 23

  • Kem - OPSIM-39: Edit default proposal files and parameters in LSST.conf
  • Kem - AstronomicalSky.conf - not caching temporal; now in schedulingData.conf (+other?)
  • Kem - Remove conf files that are obsolete; and parameters that are no longer used - recalcskycount, reuserankingcount in each prop ; leaving in Scheduler.conf; delete useLookAhead
  • Cathy - Validation (should be encompassed by existing runs, but do one complete comparison run)
  • Francisco - Release OpSim v3.0 & install on production machines

SSTAR v4.0 - Release by Fri, Dec 20

  • Cathy - validate SSTAR v4.0 (include final v3.0 run)
  • Srini - Release SSTAR v4.0 & install on production machines
  • Fixing Aitoff plots for WLProp confs with more than one sequence will be addressed in MAF

Documentation - Documents will be provided to the Reading Committee by Monday (Cathy will set up access with short links and send email to the committee).  All authors should have their final version uploaded to Docushare by Friday afternoon.

  • Abi - Overview ** (Fri)
  • Francisco - Simulator description ** (Fri)
  • Francisco - Simulator requirements (Fri)
  • Francisco - Conceptual APIs for the for the Scheduler (interface with OCS) (Fri)
  • Srini -  Sphinx documentation on SSTAR * (Wed)
  • Srini / Kem - Sphinx documentation on OpSim * (Kem to send text from altered conf files to Srini)  (Fri)
  • Srini - Post-processing tools: SSTAR+ (Thu)
  • Steve/Srini - Post-processing tools: Metrics  (internal review in progress)
  • Steve/Lynne/Srini - MAF design and development plan (internal review in progress)
  • Cathy - Validation v3.0 [Cathy] (Mon?)
  • Kem/Cathy - Baseline run like opsim3.61 (Mon?)

June Cadence Workshop

  • Steve will draft a document describing a successful workshop from the OpSim perspective

 