Location

BrowserRoom SystemPhone Dial-in

https://bluejeans.com/293724745/

  1. Dial: 199.48.152.152 or bjn.vc
  2. Enter Meeting ID: 293724745 -or- use the pairing code

Dial-in numbers:

  • +1 408 740 7256
  • +1 888 240 2560 (US Toll Free)
  • +1 408 317 9253 (Alternate Number)

Meeting ID: 293724745

(back to the list of all DMLT meeting minutes)

Time

10:15am PT

Attendees

Regrets



DMLT Meeting Goals

  • Weekly meeting to keep the DM leadership team coordinated, informed, and in agreement on the vision, priorities, and challenges facing DM construction, including surfacing and resolving issues and ambiguities needing our attention. The goal of this meeting is to provide information and decisions that help each one of us better direct our own (or our team's) activities.

Discussion Items

Guidelines: Propose items in line with the meeting rationale (see above); include as much information in the agenda notes; summarize, don't go into details while on the call; maximize time available for discussion. 

ItemWho

Notes

Project updates
  • M2 in port in Chile.
    • No insects in the container.
    • No visible problems.
    • Won't be further inspected until it reaches the summit (~1 week).
  • Victor & T&S management in Chile last week.
    • Taking direct control of dome construction.
  • L3 blank acceptance on Friday.
    • Some flatness non-conformance, but the team are convinced that this is acceptable.
  • M1M3 test readiness review also on Friday.
    • Passed, with some action items.
  • See also 2018-12-06 Weekly Status Meeting Notes.
Monthly Report
  • Due Wednesday 2018-12-12.
  • Here.
Variance narrativesJohn Swinbank
  • All ME 18-10 variance narratives from DM are in as of this morning: thank you!
AuxTel workshopLeanne Guy / Kian-Tat Lim
  • Brief summary of Auxiliary Telescope Planning Workshop - December 3, 2018.
  • The goal of the meeting was to define the criteria to ship the spectrograph to Chile and to put in place a plan to achieve this.
    • Produced a long list of items that have to be accomplished; will appear in Jira (work in progress by Leanne Guy & Michael Reuter)
    • Also procedures for shipping if all of the criteria are not met.
  • This is a commissioning activity — Michael Reuter will be leading it.
  • Discussion of:
    • Terminology
    • Spectral reduction
    • Configuration
    • Building a verification plan
    • ...etc.
    • Useful for getting everybody on the same page.
Level 2 Milestones
Test Plans due in the next 45 days

Key Summary T Created Updated Due Assignee Reporter P Status Resolution
Loading...
Refresh

Milestones due in the next 45 days

Key Summary T Created Updated Due Assignee Reporter P Status Resolution
Loading...
Refresh


Overdue RFCs


Change Control Board report
  • Change requests of interest to DM
  • Several long-pending LCRs approved by Victor, including LSE-61 and LSE-68. Kian-Tat Lim implementing in MagicDraw.
  • Nothing currently blocking us.
  • Selected still-in-progress LCRs:
    • Header Service LCR-1494 for LSE-400 (in "studied" state):
      • Updates to requirements coming from K-T.
    • Data Rights policy LCR-1395 for LPM-261 (in "studied" state):
      • Currently being worked on by Bob Blum.
      • A sanity-check technical review by DM will be required following these changes (although we don't expect any issues) to ensure that the policies proposed are implementable with the current LSP design, before sending the document for agency review.
    • Image naming convention LCR-1424 (in "pending refinement" state):
      • Basic agreement, but still waiting for Systems Engineering to write it up properly.
      • Not holding up any work.
      • Likely to be written up in LSE-69 Camera-DM ICD.
Open todo items


DMLT travel & availability this week

Wil O'Mullane CMB-S4 Mon-Thurs

  • Overdue RFCs

Key Summary T Created Updated Due Assignee Reporter P Status Resolution
Loading...
Refresh

Past action items

Open DMLT actions

DescriptionDue dateAssigneeTask appears on
  • Frossie Economou Will recommend additional Level 3 milestones for implementation beyond just the DAX-9 Butler provenance milestone.   
15 Mar 2022Frossie EconomouDM Leadership Team Virtual Face-to-Face Meeting, 2022-02-15 to 17
  • Kian-Tat Lim Convene a meeting with Colin, Tim, Robert, Yusra to resolve graph generation with per-dataset quantities (likely based on Consolidated DB work).  
18 Mar 2022Kian-Tat LimDM Leadership Team Virtual Face-to-Face Meeting, 2022-02-15 to 17
  • Frossie Economou Write an initial draft in the Dev Guide for what "best effort" support means  
17 Nov 2023Frossie EconomouDM Leadership Team Virtual Face-to-Face Meeting - 2023-Oct-24
  • Convene a group to redo the T-12 month DRP diagram and define scope expectations Yusra AlSayyad 
30 Nov 2023Yusra AlSayyadDM Leadership Team Virtual Face-to-Face Meeting - 2023-Oct-24
11 Dec 2023Gregory Dubois-FelsmannDM Leadership Team Virtual Face-to-Face Meeting - 2023-Oct-24
02 May 2024Frossie EconomouDMLT Meeting - 2024-04-22
22 May 2024 DMLT Meeting - 2024-04-22
  • Richard Dubois USDF part in data facilities for PSTN-017 and distrib processing ? 
22 May 2024Richard DuboisDMLT Meeting - 2024-04-22
22 May 2024Fabio HernandezDMLT Meeting - 2024-04-22
  • Tim Jenness - section on middleware for PSTN-017  
22 May 2024Tim JennessDMLT Meeting - 2024-04-22
  • Cristián Silva - section on summit/data acquisition  for PSTN-017  
22 May 2024Cristián SilvaDMLT Meeting - 2024-04-22