(back to the list of all DMLT meeting minutes)
NOTE: For this meeting and future dates we are conducting the meeting on Blue Jeans (use web browser or below):
Web Browser:
https://bluejeans.com/293724745/
> Connecting directly from a room system?
> 1) Dial: 199.48.152.152 or bjn.vc
> 2) Enter Meeting ID: 293724745 -or- use the pairing code
>
> Just want to dial in? (all numbers)
> 1) Direct-dial with my iPhone or
> +1 408 740 7256+1 408 740 7256
> +1 888 240 2560+1 888 240 2560 (US Toll Free)
> +1 408 317 9253+1 408 317 9253 (Alternate Number)
>
> 2) Enter Meeting ID: 293724745
Date
Attendees
(sorry if I missed anyone)
- Unknown User (xiuqin)
- Unknown User (ciardi)
- Frossie Economou
- Tim Jenness (not available)
- Gregory Dubois-Felsmann
- Jacek Becla
- Margaret Gelman
- Donald Petravick
- Kian-Tat Lim
- Simon Krughoff
- Jim Bosch (not available)
- John Swinbank
- Robert Lupton (not available)
- Unknown User (nidever)
- Jeff Kantor
- Weekly coordination meeting to discuss and resolve management items, project communications, external contacts, etc.
Discussion items
Item | Who | Notes |
---|---|---|
FY16 Contracts | Jeff Kantor | Still working to have draft amendments out, all papers and budgets are with AURA, hope to have them this week. |
Design documents updates | Status update, critical actions. Along with Long-Range plans, need to have baseline updated first week after November DMLT. Discussing dependencies tomorrow, point out things you need, things you expect are needed. John Swinbank Baseline plan for measurement, need feedback adapt, Mario Juric looking this week.
| |
Long-range Plans | Need to have baselined in PMCS first week after November DMLT. These will evolve somewhat with every planning cycle (under change control), they are plans, not ironclad guarantees. Significant open issues to address before/during DMLT (per Kian-Tat Lim, Mario Juric): | |
Verification Plans | Jeff Kantor | All subsystems are required to provide Verification plans that describe how we will verify that DM meets flowed down requirements. SQuaRE has lead on producing the plan, Kian-Tat Lim and Mario Juric approve it. System Engineering is looking for requirements to support DM Verification for Simulations, proposed review sometime in the future. |
Upcoming conferences | Jeff Kantor |
IMPORTANT: Need to get prior approval with publications board (not oral presentations or posters, only papers), post in Interactions Database on project.lsst.org for any outside communications/papers/presentations that have programmatic information (scope, budget, schedule of MREFC project). |
Miscellaneous | Jeff Kantor | Reminder: Monthly report inputs due this week. |
Other business | Jeff Kantor |