Date
Attendees
- Kian-Tat Lim
- Frossie Economou
- John Swinbank
- Jim Bosch
- Jacek Becla
- Unknown User (xiuqin)
- Margaret Gelman
- Steve Pietrowicz
- Greg Daues
- Unknown User (kooper)
- Hsin-Fang Chiang
- Joe Muggli
Agenda
- Hardware order status (first round) (5 mins)
- lsst-dev7 beta (3 mins)
- Shared-stack release manager transition (RFC-156) (@jdswinbank @frossie?) (20 mins)
- Timeline of transition
- Shared-stack installation on lsst-dev7
- Keeping the shared-stack lean?
- Need for /ssd or testing to verify its removal
- Verification cluster planning (@nidever) (20 mins)
- Changes to the timeline or necessary resources (if any)
- Batch environment requirements
- Data retention needs (still ~1PB?)
Discussion
- new shared stack install testing on lsst-dev7, not touching ~lsstsw
- Will find new install location for stack, steering clear of ~lsstsw, Developer documentation to change to reflect new install location. (ACTION) John, Jason to find install location
- shared stack install will only make use of weekly tags, stack should be lighter, can revisit need to purge tags later as necessary
- Waiting until GPFS ready (end of May) before rolling out lsst-dev7 into production.
- (ACTION) Benchmarking of stack builds / use on GPFS to present next meeting. Planning to remove /ssd
- Verification cluster batch environment TBD in discussions with Unknown User (kooper)
- Waiting on improvements to the stack before running DES through verification
- Data usage not projected to change at this time