Attendees:


Notes:

  • Christopher Waters 
    • Filter scan code in review
    • Top priority: Summit scripts.
      • We need to have a CPV side script if we don't have them.
      • Talk to Tiago and Parker on summit block script status.
    • Next priority: CPV report.
    • Third priority: CPV results.
    • Documentation.
      • Summit distribution.
    • Fourth priority: Visit DB.
  • Agnès Ferté 
    • Will we have a schedule?
      • Next week.
    • New ISR Task testing.
  • Eli Rykoff 
    • Start renaming RFC implementation.
      • Will this break the summit scripts?
    • Ops Rehearsal Questions:
      • Move to new pipeline names.
    • Summit VPN access.
      • Need to learn how to put calibrations in place.
      • Tuesday 2pm Project time for the summit.
    • New ISR Task issues:
      • Crosstalk correction location?
        • Main CT is happening in cables coming directly from the detector.
        • Non-linear CT terms are in electrons. 
      • Saturation level.
        • CZW: Assert that this should be included in the PTC.
        • RHL: Is this confusing Saturation with Suspect?
        • How do we derive that?
          • Should we have a task?
          • Aperture vs PSF magnitudes.
  • Robert Lupton