Attendees:


Notes:

  • Merlin Fisher-Levine 
    • Will be in Japan starting tomorrow.
    • Will be available at 9:30pm Summit time tomorrow.
    • Last minute changes for the Ops Rehearsal have worked
      • Assuming that the calibs are correct at the summit.
      • USDF and summit processing are running.
    • Calibration group at the summit.
    • Add rapid analysis group at the summit as well?
      • Add examples of failures with correct classifications for instruction.
  • Christopher Waters 
    • New calibrations are built
      • Make PTC dataset.
    • TAXICAB
    • Calibration ops rehearsal
    • Ask Angelo about amplifier dimensions
      • Sasquatch to EFD connection as well?
    • Finish analysis_tools + metrics + cp_verify.
    • Simulated calibration data for the ops rehearsal.
  • Agnès Ferté 
    • IsrMock for new ISR Task.
      • Need re-review on that ticket DM-
    • Use rehearsal data to test new task as well.
      • Will need to have flat added to task.
      • Check this with the place holder.
    • New pipelines are needed to use the new task for calibration products.
      • Is this ticketed?
    • Tree rings and 2d templates.
      • Data access issues that have been resolved now.
      • Will be making 2d templates.
  • Andrés Alejandro Plazas Malagón 
    • Working on non-linear crosstalk implementation.
      • Into review this week.
      • Need to repack coefficients.
  • Robert Lupton 
    • Calibration ops rehearsal later this month.
      • Week of 2024-04-29
      • calib  group access.
    • July 8 is the nominal first photon date.
  • Yousuke Utsumi 
    • Crosstalk in general:
      • Stable with time.
      • Not the same for each detector.
      • Non-linear component strength changes.
      • Dependent on gain values
      • Will the coefficients change when the order of operations changes.
      • How much do we need to worry about the delay component?
        • Only seen in the high flux end.
        • Do we need to implement something on this?
    • Training Huan-Lin to do calibration.
      • Can we get him ramped up this week?
      • Prior to the ops rehearsal.
    • "hotfix" for LATISS.
      • Need PTC dataset that goes bright enough.
      • Will check with the current dataset.
      • Don't expect much gain change.