Attendees:


Notes:

  • Merlin Fisher-Levine 
    • Camera configuration can be set on the CCS command line.
      • This information should be stored in the EFD (according to K-T).
      • This would very useful to have in the image headers.
      • We don't currently use any header information – We don't use any listed gain.
      • We need to have a check that the system is consistent.
        • The future PTC calib needs to have a checksum of parameters to ensure that we're processing with the same configuration.
    • Ramping up after vacation/at USDF.
    • Merging already-reviewed tickets.
  • Christopher Waters 
    • USDF does not have latexmk.
    • DMTN-222 updated.
    • RFC for CAB.
    • Fringe images exist, but not imsim.
    • Small tickets, no big issues.
    • Check for tickets to Agnès Ferté 
    • Aaron Roodman's weird feature.
  • Andrés Alejandro Plazas Malagón 
    • Watcher alarms DM-33898.
      • There is some code issues. Additional tickets: DM-36189, DM-36192, DM-36187.
      • Non-blocking code execution work.
      • Intermediate tickets need to be assigned (possibly to other people).
      • PP with Tiago to get knowledge transfer.
      • async processing does not appear to be available – need to assign to someone else
      • Cross-team work may need to be organized by the commissioning scientist.
      • Work to see if K-T can sort it out.
      • Check in at the CAP meeting
    • Alex Broughton PTC/BFK mask issue.
    • Gain test for cp_verify.
    • Linearity tests and photodiode ingestion.
      • How to ingest photodiode.
  • Agnès Ferté 
    • Documentation ticket merged.
    • Working on running BPS to run pipetasks for parallel overscan checks.
      • Using Craig's calibration collection.
    • Reproduce PTC curve that Jim Chiang worked on.
  • Eli Rykoff 
    • DM-ification of Eotest by December 16th from Jim Chiang.
      • Necessary for camera recertification.
    • Dark current statistics – Eotest has, but isn't something calculated by DM.
      • If someone wants it, we should do it.
    • ISR reorganization.
      • A number of flat steps that are not implemented yet.
      • Lateral E-field artifact removal – Agnès Ferté.
      • Tickets will need to be made.
      • Plan posted this week.