Date/Time
8am PT
Meeting Online Connections
The following is the BlueJeans Information:
CIARA BlueJeans Account has invited you to a video meeting.
-----------------------------------
To join the Meeting:
https://bluejeans.com/843342501
To join via Room System:
Video Conferencing System: bjn.vc -or-199.48.152.152
Meeting ID : 843342501
To join via phone :
1) Dial:
+1.408.740.7256 (United States)
+1.888.240.2560 (US Toll Free)
+1.408.317.9253 (Alternate number)
(see all numbers - http://bluejeans.com/numbers)
2) Enter Conference ID : 843342501
Want to test your video connection?
Meeting Recording
TBD
Attendees
- Jeff Kantor (JK)
- Julio Ibarra (JI)
- Unknown User (rlambert) (RL)
- Unknown User (kollross) (MK)
Jeronimo Bezerra (JB)
Humberto Galiza (HG)
Albert Astudillo (AA) (absent)
- Unknown User (lcorral) (LC)
- Chris Morrison (CM)
- Vinicius Arcanjo (VA)
- Vasilka Chergarovoa (VC)
Goals
- Coordination of networking activities across LSST
Discussion items
Time (PT) | Item | Who | Notes |
---|---|---|---|
0800 | NET Action Items Status Introductions Update on ESnet agreement | Jeff Kantor | Review open action items. Introduce new NET members. The LSST - ESnet technical document for the connectivity on ESnet from Atlanta to Chicago has been given to ESnet and LSST directors. |
0810 | Requirements Clarifications and Verification Plans | Preparing for LSE-78 and LSE-309 change requests. | |
0815 | Network Design and End-to-End Test Plan and QoS planning | Status update. Testing additional vendors: Melanox, Ciena, others. Ciena is what we are using on Spectrum link. We will try in 2019. Can do before at least to La Serena - Miami. Vinicius posted QoS document | |
0845 | Discussion Topics | December Demonstration: Preparing report and press release of December demonstration. Vinicius finished/uploaded draft of report last week. Jeff merging the various press release versions next week. Plan for next test/demonstration: Julio Ibarra Next demonstration can be from Miami to NCSA, queried use of internet2 through Global NOC, got favorable response on 40 Gb, could request 100 Gb, best is scheduled between midnight and 6:00am. Jeronimo Bezerra Next test would also be valuable to use new DTNs. What can we do to simulate LSST application. Can we test TCP ramp up? Try relationship between LSST and AURA backup. Jeff Kantor Doing real image transfer should be done when NCSA archiver-forwarders are ready to test over long-haul network. Probably not until 2019. First use will be Auxiliary Telescope in early 2019, but that won't be "real" archiver-forwarder, it will be a quick and dirty prototype. We could simulate somehow. NCSA is testing over a simulated network latency test bed. Unknown User (kollross) Not a good idea to distract Jim Parsons now. Real a-f will have 20 servers simultaneously transferring, with protocol to avoid saturation. Actual a-f work is focused on DAQ side interface. Might be able to get access 100 Gb perfSonar for a demonstration. Question whether worth doing over internet2 if real link will be over ESnet. AURA Link: Jeff Kantor , Julio Ibarra, Unknown User (rlambert), Chris Smith, Jeronimo Bezerra starting discussions on extending/leveraging AURA 40 Gb link. Will continue to cover this in LSST NET meetings until/if there is another more appropriate forum identified. Stay tuned for more details. Site Redundancy in Santiago: (See document Julio Ibarra circulated examining ways to get site redundancy in Santiago.) Julio Ibarra would like to develop MOA that can be baselined so that we all agree to plan. | |
Other business | Any | ||
Wrap up and next meeting | Jeff Kantor | Wrap up and Next meeting date and agenda topics: TBD |
Action items
- Unknown User (kollross), Jeronimo Bezerra, Unknown User (rlambert) Find out and report on status/results of James Parsons testing of archiver-forwarders using simulated network latency box. Determine if additional tests would be beneficial and coordinate with James Parsons
- Jeronimo Bezerra, Unknown User (kollross), Julio Ibarra define requirements for 2018 LHN demonstration involving 100 G transfers between Miami and NCSA, using new DTNs.
- Jeff Kantor Merge the various press release versions and distribute.